In general, the size of tunnel cross section in construction site is $50{\sim}200m^2$. But, electric cable tunnel, telecommunication cable tunnel, mine tunnel. Waterproof tunnel have small cross section less than $20m^2$. There are so many problem at small sectional tunnel: restriction of equipment, dead pressure by precompression, loss of efficiency, increase of work time. Especially, explosives remainder by precompression of previous detonation is serious problem. To find its measures of dead pressure (explosives remainder), the following series of progress have been conducted: (1) survey of previous study (2) investigate causes of dead pressure (3) set up of its measures (4) application and appraisal at tunnel site. The measures, change of cut pattern, hole space over 40cm, adjustment of delay time, are proved by experimental results.
For a hydro power plant project, the headrace tunnel having a finished diameter of 3.3 m was constructed in volcanic rocks with well-developed vertical joint and high groundwater table. The intake facility was located 20.3km upstream of the powerhouse and headrace tunnel of 20km in length and penstock of 440m in height connected the intake and the powerhouse. The typical caldera lake, Lake Toba set the geology at the site the caving of the ground caused tension cracks in the vertical direction to be developed and initial stresses at the ground to be released. High groundwater table(the maximum head of 20bar) in the area of well-connected vertical joints delayed the progress of tunnel excavation severely due to the excessive inflow of groundwater. The excavation of tunnel was made using open-shield type TBM and mucking cars on the rail. High volume of water inflowraised the water level inside tunnel to 70cm, 17% of tunnel diameter (3.9m) and hindered the mucking of spoil under water. To improve the productivity, several adjustments such as modification of TBM and mucking cars and increase in the number of submersible pumps were made forthe excavation of severe water inflow zone. Since the ground condition encountered during excavation turned out to be much worse, it was decided to adopt PC segment lining instead of RC lining. Besides, depending on the conditions of the water inflow, rock mass condition and internal water pressure, one of the invert PC segment lining with in-situ RC lining, RC lining and steel lining was applied to meet the site specific condition. With the adoption of PC segment lining, modification of TBM and other improvement, the excavation of the tunnel under severe groundwater condition was successfully completed.
Proceedings of the Korea Water Resources Association Conference
/
2016.05a
/
pp.358-358
/
2016
본 연구에 앞서 가뭄에 따른 충청남도 서부권의 물 부족을 해결하기 위하여 금강 본류로부터 보령댐으로 일정 유량을 도수(diversion)하는 계획이 금강 본류에 미치는 수리적 영향을 1차원 비정상류 해석(unsteady flow analysis)을 통하여 분석하였으며, 본 연구에서는 수리모형 결과와 연계하여 수질 모형을 구축하여 금강 본류 수질에 미치는 영향을 알아보고자 하였다. 조위 영향에 따른 염도의 역류 모의를 위하여 전자해도와 위성영상자료를 활용하여 금강 하굿둑에서 외해 방향으로 약 9km에 이르는 모의 구간을 확장하였으며, 상류단의 진두수위표를 포함한 8개 지천의 유입유량 및 수질, 하구의 조위와 염도, 농공용수 취수시설의 취수량 및 회귀수 수질, 금강 배수갑문 운영, 대상 구간에 인접한 기상대의 기상자료 등을 고려하고 금강 본류를 따라 9개 수질측정소의 수질자료를 이용하여 모형의 보정을 실시하였다. 또한 대상 구간 내 2015년의 갈수기 유황 분석을 토대로 비선형 회귀분석식을 도출하여 2016년 갈수기 예측 유량과 함께 수질-유량 관계식을 도출하여 대상 구간의 수온, 염도, 용존산소(DO), BOD, 조류 등 영향을 분석하였다. 수온 분석 결과, 지점에 따라 2015년 유황 대비 평균 수온 1.79~3.83도, 최고 수온 1.74~4.30도 상승할 것으로 모의되었으며, 염도는 2016년 갈수기 동안의 금강 하굿둑 외해 염도는 담수 방류량의 감소로 전년 동기 대비 평균 53% 증가하는 것으로 모의되어 기수역 생태계에 상당한 영향을 줄 것으로 분석되었으며, 갈수기 동안의 금강 하굿둑 내수의 염도는 배수갑문 개방 빈도, 개방 시간, 개방 정도의 감소에 따른 해수 역류의 감소로 전년 동기 대비 크게 감소할 것으로 모의되었다. 용존산소는 2016년 갈수기 동안의 용존산소 농도는 지점에 따라 전년 동기 대비 평균 4~11% 감소하는 것으로 모의되었으며, 2016년 갈수기 동안의 BOD 농도는 지점에 따라 전년 동기 대비 평균 30~57% 증가하는 것으로 분석되었다. 조류는 지점에 따라 전년 동기 대비 평균 29~67% 증가하는 것으로 모의되었다. 유량의 감소에 따른 수온 증가 및 수질 악화의 영향이 있을 것으로 분석되나, 도수에 따른 영향은 상대적으로 제한적인 것으로 분석되었다.
To verify the characteristics of groundwater inflow accompanied by the tunnel excavation, the flow rate was measured before and after primary grouting. The relationship between the flow rate and fracture system was also analyzed. The initial flow rate was estimated as 120,990 m$^3$/day through six zones, which were characterized by a large amount of inflow before the primary grouting. After the primary grouting, although considerable amount of inflow was still recognized at the six zones, the flow rate was greatly reduced as 42,844 m$^3$/day. However, great recovery of water levels was not observed. Groundwater flow into the tunnel by excavation of the tunnel is mainly controlled by the fracture system that include faults and joints developed in the host rocks. Four sets of discontinuities affecting on the network of grondwater inflow in the study area were identified as follows: N60-85$^{\circ}C$ W.25$^{\circ}$SW/80$^{\circ}$SW(TSet 1), N40-50$^{\circ}$E.85$^{\circ}$SE/85$^{\circ}$NE(TSet 2), N10-20$^{\circ}$E.85$^{\circ}$SE(TSet 3), and N70-80$^{\circ}$E.80SE(TSet 4).
Park, Chul-Whan;Synn, Joong-Ho;park, Chan;Kim, Min-Kyu;Chung, So-Keul;Kim, Hwa-Soo
Tunnel and Underground Space
/
v.10
no.4
/
pp.526-532
/
2000
The uniaxial compressive strength of rock mass is known as the major factor in the assessment of drillability and the optimum excavation design in full-face tunnel excavation by TBM. Referring to worldwide cases, TBM has been applied mostly to the rock mass within the strength range of 80~250 MPa. Recently, a water way tunnel has been constructed as a part of Milyang dam project by TBM within the rock masses where the rock type is mainly granite with some granophyre, hornfels and andesite. Their uniaxial compressive strengths in extended area are estimated higher than 260 MPa. In this paper, the relation between the penetration rate and the rock mass properties is analyzed and TBM application to the very hard rocks is discussed. As a result that three suggestions to predict the TBM net penetration rate are analyzed, NTH method seems a better approach than other methods in the extremely hard rocks. NTH prediction matches with the results of actual values with the variations of 2~20%. Hardness measurement by Schmidt hammer and RMR estimation are carried out along the L = 5.3 km entire TBM tunnel alignment. The net penetration rate measured monthly is shown to be reciprocally proportional to Schmidt rebound hardness and RMR where coefficients of correlation, $R^2$are 0.705 and 0.777 respectively. As a result, they are good quantitative indices for the prediction of TBM net penetration rate in the extremely hard rocks. Magnitude of in-situ stress has a certain effect on TBM performance, and it is required to measure the in-situ stresses in TBM excavation design.
Kim, Kyoung Ho;Yang, Hai Ryong;Oh, Hyun Sik;Lee, Ho Jin
한국방재학회:학술대회논문집
/
2011.02a
/
pp.159-159
/
2011
수자원 공급의 시 공간적 편차가 큰 우리나라에서는 수자원을 이용하기 위해서 다수의 댐을 건설하고 있다. 특히, 생활수준의 향상으로 용수 수요가 급증하였기 때문에 용수가 부족한 곳에는 광역상수도 사업 등을 통하여 용수를 공급하고 있다. 댐에서 용수가 공급되기까지의 과정은 일종의 관수로 흐름으로 생각할 수 있다. 관수로 내를 흐르는 유체가 갑자기 정지하게 되면, 유체 운동 에너지의 변화가 유발되고, 그로 인해 관내에 급격한 압력의 상승이 일어나게 된다. 반대로 정지하고 있던 유체가 빠른 속도로 흐르게 되면 압력 감소가 급격하게 발생한다. 이와 같이 유체 운동 상태의 급변에 의한 압력변화와 그에 따른 압력파가 음속의 속도로 상 하류로 전파되는 현상을 수격작용(waterhammer)이라 한다. 통상적으로 수격작용은 밸브 개폐 정도가 갑자기 바뀔 때, 펌프의 급격한 기동이나 정지 시, 터빈 내 전력소요가 갑자기 바뀔 때, 댐 수위의 갑작스런 변화, 펌프 임펠러의 진동, 물 수요의 급격한 변화 등에 의해 발생하며, 수격작용은 유체의 질량과 운동량 때문에 관 벽에 큰 힘을 가하게 되어 정상적인 동수압 보다 몇 배나 큰 압력을 발생시킴으로 관 자체는 물론 펌프, 밸브, 터빈 등 관 시설물을 파손시키거나 진동, 소음 등을 야기시킴으로 대규모 건물, 공장, 발전소 등을 설계할 경우 그에 대한 적절한 대책을 강구하여야 한다. 특히 댐에 연결된 저수지 또는 조정지로부터의 도수로가 압력수로이며 그 길이가 상당히 크면 수차가 급정지했을 경우 수격작용에 의해서 압력터널 내에 과도한 압력상승이 일어난다. 이 압력상승을 방지함과 함께 발전소 부하의 증감에 따라서 수량을 공급하거나, 흡수할 목적으로 압력도수로와 수압관과의 접합부에 자유수면이 있는 수조를 설치한다. 이것을 조압수조(surge tank)라 한다(최영박, 1979). 조압수조에서 부하의 급속한 차단에 의해서 수차로 유입될 수량이 차단되면 도수로 내로 흘러 들어온 물은 관성 때문에 수조 내의 수위를 상승시키고, 수조 수위가 어느 정도 이상으로 되어 저수지 수위 보다 상승하면 수조로의 유입이 정지하고 반대로 수조에서 저수지로 역류하여 수조수위는 하강한다. 즉, 조압수조는 도수로 내에 발생한 과도한 압력을 수조 내 수면의 승강운동을 이용하여 감소시키고 원래의 안정적인 수위로 회복시킨다. 본 연구에서는 수격작용에 대한 댐 안정성을 확보하는 수단 중의 하나인 조압수조에 대해 살펴보았다. 연구대상으로 용담댐을 선정하였다. 용담댐에 대한 기존의 검토결과 수직 갱의 지름이 5m 이상이면 조압수조의 동적안정조건을 만족 시키는 것으로 조사되었다. 댐의 설계홍수위인 EL. 265.5m를 기준으로 조압수조의 안정성을 감소시키지 않는 범위 내에서 조압수조 내 격벽 설치 유 무에 따른 수조의 최적 크기를 산정하였다. 산정결과를 분석한 결과 동일 조건에서 격벽을 설치한 경우가 격벽을 설치하지 않은 경우에 비해서 조압수조의 면적이 약 21% 감소하는 것으로 나타났다.
A field technique for assessing the transmissive fractures in an aquifer was applied to a fractured rock formation in Youngchun area Korea. Geological mapping and detailed acoustic borehole teleview(BHTV) logging were performed to obtain information about the fractures. The study area consists predominantly of two types of fractures. The fracture sets of low angle partings such as bedding and sheeting plains have strike N70-80$^{\circ}$W, 25$^{\circ}$-30$^{\circ}$SW and N3S$^{\circ}$W, 12$^{\circ}$NE, respectively. In areas of high fractures, on the other hand, the major fracture sets show strike N80$^{\circ}$W and dip 70$^{\circ}$-85$^{\circ}$SW, N10$^{\circ}$E.85$^{\circ}$SE in sedimentry rocks, N40-50$^{\circ}$E.85$^{\circ}$SE/85$^{\circ}$NE, N70$^{\circ}$E.80$^{\circ}$SE, and N7$^{\circ}$-75$^{\circ}$W.80$^{\circ}$SW in granites and volcanic rocks. Injection tests have been performed to identify discrete production zones and quantify the vertical distribution of hydraulic conductivity. The calculated hydraulic conductivities range from 3.363E-10 to 2.731E-6, showing that the difference between maximum and minimum value is four order of magnitude. Dominant section in hydraulic conductivity is extensively fractured. Geophysical logging was carried out to clarify characterization of the distribution of fracture zones. Transmissive fractures were evaluated through the comparison of the results obtained by each method. The temperature logs appeared to be a good indicator that can distinguish a high transmissive fractures from a common fractures in hydraulic conductivity. In numerous cases, evidence of fluid movement was amplified in the temperature gradient log. The fracture sets of N70-80$^{\circ}$W.60-85$^{\circ}$NE/SW N75-80$^{\circ}$W.25-30$^{\circ}$SW, N50-64$^{\circ}$W.60-85$^{\circ}$NE, N35-45$^{\circ}$E.65-75$^{\circ}$SE, and N65-72$^{\circ}$E.80$^{\circ}$SE/60$^{\circ}$NW were idenfied as a distinct transmissive fractures through the results of each tests.
Journal of the Korean Society of Groundwater Environment
/
v.5
no.4
/
pp.192-202
/
1998
We investigated the geochemistry and environmental isotopes of granite-bedrock groundwater in the Yeongcheon diversion tunnel which is located about 300 m below the land surface. The hydrochemistry of groundwaters belongs to the Ca-HCO$_3$type, and is controlled by flow systems and water-rock interaction in the flow conduits (fractures). The deuterium and oxygen-18 data are clustered along the meteoric water line, indicating that the groundwater are commonly of meteoric water origin and are not affected by secondary isotope effects such as evaporation and isotope exchange. Tritium data show that the groundwaters were mostly recharged before pre-thermonuclear period and have been mixed with younger surface water flowing down rapidly into the tunnel along fractured zones. Based on the mass balance and reaction simulation approaches, using both the hydrochemistry of groundwater and the secondary mineralogy of fracture-filling materials, we have modeled the low-temperature hydrogeochemical evolution of groundwater in the area. The results of geochemical simulation show that the concentrations of Ca$\^$2+/, Na$\^$+/ and HCO$_3$and pH of waters increase progressively owing to the dissolution of reactive minerals in flow paths. The concentrations of Mg$\^$2+/ and K$\^$+/ frist increase with the dissolution, but later decrease when montmorillonite and illitic material are precipitated respectively. The continuous adding of reactive minerals, namely the progressively larger degrees of water/rock interaction, causes the formation of secondary minerals with the following sequence: first hematite, then gibbsite, then kaolinite, then montmorillonite, then illtic material, and finally microcline. During the simulation all the gibbsite is consumed, kaolinite precipitates and then the continuous reaction converts the kaolinite to montmorillonite and illitic material. The reaction simulation results agree well with the observed, water chemistry and secondary mineralogy, indicating the successful applicability of this simulation technique to delineate the complex hydrogeochemistry of bedrock groundwaters.
Journal of Korean Society of Disaster and Security
/
v.17
no.2
/
pp.1-11
/
2024
Most reservoirs in South Korea are earthen dams, mainly because they are cost-effective and easy to construct. However, earthen dams are highly vulnerable to seepage and overtopping, making them prone to sudden failure during excessive flooding. Such sudden failures can lead to a rapid increase in flood discharge, causing significant damage to downstream rivers and inhabited areas. This study investigates the effect of riprap placement on the slopes of earthen dams in delaying dam failure. Delaying the failure time is crucial as it allows more time for evacuation, significantly reducing potential casualties, which is essential from a disaster response perspective. Hydraulic experiments were conducted in a straight channel, using two different sizes of riprap for protection. Unlike previous studies, these experiments were performed under unsteady flow conditions to reflect the impact of rising water levels inside the dam. The target dam for the study was a cofferdam installed in a diversion tunnel. Experimental results indicated that the presence of riprap protection effectively prevented slope failure under the tested conditions. Without riprap protection, increasing the size of the riprap delayed the failure time. This delay can reduce peak discharge, mitigating damage downstream of the dam. Furthermore, these findings can serve as critical reference material for establishing emergency action plans (EAP) for reservoir failure.
Kim, Seok-Jung;Kwon, Oh-Soo;Choi, Dong-Won;Song, Ho-Wook;Kang, Hyun-Taek;In, Yong
Journal of the Korean Arthroscopy Society
/
v.8
no.1
/
pp.19-25
/
2004
Purpose: To compare the results of two different autografts used to reconstruct the anterior cruciate ligament(ACL): bone-patellar tendon-bone and quadruple hamstring tendon. Materials and Methods: Forty one cases (20 bone-patellar tendon-bone cases and 21 quadruple hamstring tendon cases) were followed up more than 2 years postoperatively. Patellar tendons were fixed with interference screws and hamstring tendons were fixed with cross pins and intrafix sheaths and screws. Follow-up results were evaluated with KT-2000 arthrometer, International knee Documentation Committee(IKDC) evaluation form and follow up X-ray Donor site morbidity was analysed. Results: Final IKDC) scores more than B grade and side to side differences of manual maximum test using KT-2000 arthrometer showed insignificant differences(p>) between the two groups. Plain radiographs of hamstring group showed marked widening of the femoral and tibial tunnels at postoperative 2 years. Patellar tendon group showed 30% rate of anterior knee complications. Conclusion: ACL reconstruction using autogenous hamstring graft with new fixation method showed comparable clinical results to using autogenous patellar tendon graft with fewer anterior knee symptoms.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.