• Title/Summary/Keyword: 도면정보

Search Result 679, Processing Time 0.026 seconds

GIS-based Fire Evacuation Simulation using CA Model (CA 모델을 이용한 GIS 기반 화재 대피 시뮬레이션)

  • Park, In-Hye;Jun, Chul-Min;Lee, Ji-Yeong
    • Spatial Information Research
    • /
    • v.16 no.2
    • /
    • pp.157-171
    • /
    • 2008
  • With emerging technologies on wireless networks and mobile computing environment, a number of researches have been carried out for ubiquitous computing. An important functional requirement of ubiquitous computing is to handle location data with ease. With the increase of accidents in large complex buildings. move attention is being paid to indoor spaces and evacuation. However, most currently used evacuation-related applications are simulation based on hypothetical data. Also, since they use non-georeferenced CAD data, it is not easy to integrate them with indoor positioning devices. With the recent progress of indoor positioning systems, the simulators can be enhanced to real-time evacuation systems. As a preliminary stage to make such systems possible, this study proposes using a georeferenced data and evacuation simulation. This study used GIS data and Cellular Automata theory an the algorithm for the movement of the evacuee.

  • PDF

Decision-making system for the resource forecasting and risk management using regression algorithms (회귀알고리즘을 이용한 자원예측 및 위험관리를 위한 의사결정 시스템)

  • Han, Hyung-Chul;Jung, Jae-Hun;Kim, Sin-Ryeong;Kim, Young-Gon
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.15 no.6
    • /
    • pp.311-319
    • /
    • 2015
  • In this paper, in order to increase the production efficiency of the industrial plant, and predicts the resources of the manufacturing process, we have proposed a decision-making system for resource implementing the risk management effectively forecasting and risk management. A variety of information that occurs at each step efficiently difficult the creation of detailed process steps in the scenario you want to manage, is a frequent condition change of manufacturing facilities for the production of various products even within the same process. The data that is not contiguous products production cycle also not constant occurs, there is a problem that needs to check the variation in the small amount of data. In order to solve these problems, data centralized manufacturing processes, process resource prediction, risk prediction, through a process current status monitoring, must allow action immediately when a problem occurs. In this paper, the range of change in the design drawing, resource prediction, a process completion date using a regression algorithm to derive the formula, classification tree technique was proposed decision system in three stages through the boundary value analysis.

3-D Visualization of Reservoir Characteristics through GOCAD (GOCAD를 이용한 저류층 속성정보의 3차원 시각화 연구)

  • Gwak Sang-Hwan;Lee Doo Sung
    • Geophysics and Geophysical Exploration
    • /
    • v.4 no.3
    • /
    • pp.80-83
    • /
    • 2001
  • Four seismic reflection horizons in 3-D seismic data, coherence derived from the seismic data, and 38 well logs from the Boonsville Gas Filed in Texas were tried to be integrated and visualized in 3 dimensions. Time surface was constructed from pick times of the reflection horizons. Average velocities to each horizon at 38 well locations were calculated based on depth markers from the well logs and time picks from the 3-D seismic data. The time surface was transformed to depth surface through velocity interpolation. Coherence was calculated on the 3-D seismic data by semblance method. Spatial distribution of the coherence is captured easily in 3-D visualization. Comparing to a time-slice of seismic data, distinctive stratigraphic features could be correctly recognized on the 3-D visualization.

  • PDF

Identifying and Analyzing Pre-Dispute Factors for Construction Projects (건설공사 사전분쟁요인 도출 및 분석)

  • Park, Sung-Yong;Yang, Jin-Kook;Kim, Byeong-Ok;Lee, Sang-Beom
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.6
    • /
    • pp.48-57
    • /
    • 2009
  • As recent construction projects have gradually become larger in size and complex, construction documents such as drawings and specifications revealed the limitations that can not express all the necessary information. Due to the lack of stipulations on the contract, disputes arise among contracting parties. Traditionally, many construction companies in Korea make an unfair agreement with the clients so that the irrational items are included in their contract documents. Potential dispute factors are triggered as a result of misleading or omitted items on the written documents. This paper analyzed the civic counseling cases obtained from the public procurement service in Korea, and identified the potential dispute factors that can occur during pre-dispute stage alone with their influence analysis. The results found from this study can be used for the development of checklists that prevent the dispute in the process of construction projects.

A Study on the Indirect Copy of Dancheong Patterns Using Three-dimensional Scanning (3차원 스캐닝을 활용한 단청문양의 간접전사 연구)

  • An, Ji Eun;Choi, Chan Ho;Kim, Sung June;Yoon, Man Young
    • Journal of Conservation Science
    • /
    • v.34 no.6
    • /
    • pp.471-479
    • /
    • 2018
  • Seonunsa Temple is a site of Dancheong cultural significance in Daewoongjeon. Three-dimensional (3D) scanning can be used to create a simulation in 1:1 ratio without touching the Dancheong patterns directly. The traditional method of recreating Dancheong was paining with tracing paper using a fix pin. However, manual direct copy processes can cause and damage to the objects. This study shows the results of a simulation of a tranditional Dancheong patterns as an alternative; the simulation was able to reduce dimensional errors and prevent damage by using 3D scanning. As a result, objective and precise proportions of the simulation were acquired. The 3D scanning method may be applied for work such as the replication and restoration of the drawing, 3D fabrication of the original data, and printing of the additional drawing. In addition, with the production of 3D materials, a virtual museum is possible.

Efficient Construction of Open Source-based Sewage Facility Database (오픈소스 기반의 하수 시설물 데이터베이스의 효율적 구축)

  • Ko, Jeongsang;Xu, Chunxu;Yun, Heecheon
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.40 no.5
    • /
    • pp.393-402
    • /
    • 2022
  • Effective data management of underground facilities is very important in terms of human life. For this, input of up-to-date and high-accuracy data should be preceded. Therefore, it is important to have an efficient data input method. In this study, by developing a sewage facility site survey program using open source software, paper drawings could be replaced with tablet PCs. By using a tablet PC, figures and property information acquired from the field are transmitted in real time through a database server. PostGIS query is developed to automate structured editing to minimize manual work in constructing a GIS (Geographic Information System) database for sewage facilities. did. In addition, the database was built using the sewage facility GIS database building program. As a result of comparing and analyzing the existing sewage facility database construction, work process, and work time, the work process was simplified and work time was shortened. In addition, through simple customization of open source software, it will be able to be used for field surveys and database construction in other fields.

The Site Analysis for Crop Cultivation Using GIS-Based AHP Method (GIS 기반 AHP 기법을 이용한 작물재배 적지분석)

  • Kim, Tae Jun;Lee, Geun Sang
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.4D
    • /
    • pp.695-702
    • /
    • 2006
  • In GIS-based Spatial Decision-making Support System (SDSS), the Boolean logic by conventional simple overlay method contains two problems. One is losing lots of information in analysis process, the other is unable to reflect of weighting values between evaluated items. Therefore, evaluation system as Analytic Hierarchy Process (AHP) needs to improve these problems effectively. The purpose of this study is to provide the benefit of AHP method and GIS spatial analysis in site analysis for crop cultivation. First, the weighting value of AHP for topography, distribution grade of water, property of soil and slope items are evaluated throughout survey to experts of soil, crop and agricultural management fields. On the basis of these weighting value of AHP by items, site suitability analysis for black raspberry cultivation is performed. To estimate the benefit of AHP method, the current cultivating map of black raspberry is constructed in Ssangchi-myeon district. In comparison with site analysis of Boolean logic, site analysis of AHP method shows more realistic.

Design Information Management System Core Development Using Industry Foundation Classes (IFC를 이용한 설계정보관리시스템 핵심부 구축)

  • Lee Keun-hyung;Chin Sang-yoon;Kim Jae-jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.2 s.2
    • /
    • pp.98-107
    • /
    • 2000
  • Increased use of computers in AEC (Architecture, Engineering and Construction) has expanded the amount of information gained from CAD (Computer Aided Design), PMIS (Project Management Information System), Structural Analysis Program, and Scheduling Program as well as making it more complex. And the productivity of AEC industry is largely dependent on well management and efficient reuse of this information. Accordingly, such trend incited much research and development on ITC (Information Technology in Construction) and CIC (Computer Integrated Construction) to be conducted. In exemplifying such effort, many researchers studied and researched on IFC (Industry Foundation Classes) since its development by IAI (International Alliance for Interoperability) for the product based information sharing. However, in spite of some valuable outputs, these researches are yet in the preliminary stage and deal mainly with conceptual ideas and trial implementations. Research on unveiling the process of the IFC application development, the core of the Design Information management system, and its applicable plan still need be done. Thus, the purpose of this paper is to determine the technologies needed for Design Information management system using IFC, and to present the key roles and the process of the IFC application development and its applicable plan. This system play a role to integrate the architectural information and the structural information into the product model and to group many each product items with various levels and aspects. To make the process model, we defined two activities, 'Product Modeling', 'Application Development', at the initial level. Then we decomposed the Application Development activity into five activities, 'IFC Schema Compile', 'Class Compile', 'Make Project Database Schema', 'Development of Product Frameworker', 'Make Project Database'. These activities are carried out by C++ Compiler, CAD, ObjectStore, ST-Developer, and ST-ObjectStore. Finally, we proposed the applicable process with six stages, '3D Modeling', 'Creation of Product Information', 'Creation and Update of Database', 'Reformation of Model's Structure with Multiple Hierarchies', 'Integration of Drawings and Specifications', and 'Creation of Quantity Information'. The IFCs, including the other classes which are going to be updated and developed newly on the construction, civil/structure, and facility management, will be used by the experts through the internet distribution technologies including CORBA and DCOM.

  • PDF

Geologic Map Data Model (지질도 데이터 모델)

  • Yeon, Young-Kwang;Han, Jong-Gyu;Lee, Hong-Jin;Chi, Kwang-Hoon;Ryu, Kun-Ho
    • Economic and Environmental Geology
    • /
    • v.42 no.3
    • /
    • pp.273-282
    • /
    • 2009
  • To render more valuable information, a spatial database is being constructed from digitalized maps in the geographic areas. Transferring file-based maps into a spatial database, facilitates the integration of larger databases and information retrieval using database functions. Geological mapping is the graphical interpretation results of the geological phenomenon by geological surveyors, which is different from other thematic maps produced quantitatively. These features make it difficult to construct geologic databases needing geologic interpretation about various meanings. For those reasons, several organizations in the USA and Australia are suggesting the data model for the database construction. But, it is hard to adapt to a domestic environment because of the representation differences of geological phenomenon. This paper suggests the data model adaptive in domestic environment analyzing 1:50,000 scales of geologic maps and more detailed mine geologic maps. The suggested model is a logical data model for the ArcGIS GeoDatabase. Using the model it can be efficiently applicable in the 1:50,000 scales of geological maps. It is expected that the geologic data model suggested in this paper can be used for integrated use and efficient management of geologic maps.

A Development of 3D Computer-Aided Design(CAD) Add-on Program for a Quantity Take-off through the User Needs Analysis (사용자 요구 사항 분석에 따른 물량산출 연동 프로그램 개발)

  • Kim, Seong-Ah;Lee, Jea-Jun;Shin, Tea-Hong;Chin, Sang-Yoon;Kim, Yea-Sang;Choi, Cheol-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.297-300
    • /
    • 2008
  • Since the Three Dimensional Computer Aided Design(3D CAD) appeared in 1990s, Building Information Modeling(BIM) has got the great issue in the construction project nowadays. BIM is the process of managing and generating building information during life cycle of a construction project. And information can be moved to 3D modeling flexibly in BIM. As a result, a field of estimating has also been doing researches in the calculation of the amount of building materials from 3D modeling. And the Construction Cost Estimating Software which is generally used over the world has been trying to be applied to the Construction project in Korea. But, when we consider the productivity, it is less efficient than the existing way in Korea which use the 2D Drawings when they take off the Quantity. Also, there are lots of difference how to estimate the construction cost. between Korea and the others. Because it is a bit hard to apply the software used in the other countries to the construction project in Korea, people couldn't use it well in the construction project actually. In this study, for developing the appropriate construction cost estimating software rooted in 3D in Korea, we suggest 3D CAD Add-on Program for a Quantity Take-off which can move quantitative information to 3D CAD.

  • PDF