• Title/Summary/Keyword: 도로 건설현장

Search Result 606, Processing Time 0.028 seconds

Design and Implementation of Fugitive Dust Measurement System using Optical Method (광학기법을 이용한 비산 먼지 측정 시스템의 설계 및 구현)

  • Chae-Hoon, Ban;Hyun-Gun, Son
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.17 no.6
    • /
    • pp.1237-1242
    • /
    • 2022
  • Fugitive dust, which accounts more than 50% of fine dust, is an air pollutant, that is generated by a lot in construction work(29.5%) and the law provides standards for facility installation and measures to control this. However, small-scale construction sites are not subject to management standards, and the law to measure and manage fugitive dust generated from construction sites is insufficient. In this paper, we designed and implemented the method to easily measure and monitor fugitive dust using the digital optical method for turbidity of dust. We presented the method to measure the turbidity of fugitive dust using the digital optical method and measured the actual turbidity of fugitive dust at the construction sites after implementing the fugitive dust measurement system.

UAV-based Construction Site Monitoring and Analysis System Development for Civil Engineering Management (토목현장에서의 무인비행장치 기반 현장정보 취득 및 분석 시스템 개발)

  • Kim, Changyoon;Youn, Junhee
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.4
    • /
    • pp.549-557
    • /
    • 2022
  • Due to harsh conditions of construction site, understanding of current feature of terrain and other infrastructures is critical issue for site managers. However, because of difficulties in acquiring the geographical information of the construction sites such as large sites and limited capability of construction workers, comprehensive site investigation of current feature of construction site is not an easy task for construction managers. To address these circumstances of construction sites, this study deduce difficulties and applicabilities of unmanned aerial vehicle in the area of construction site management. To confirm applicability of UAV in civil construction project, case study have been conducted on the road construction project. The result of case study proved that the developed system is one of promising technologies that has been studied in construction site management. To improve applicability of UAV for construction and process management information, law and technical issues will be an important area of future study.

열정! 건설현장을 찾아서 - 상생, 시스템, 자율 안전관리의 삼박자 완벽 조화, 롯데건설(주) 제주시티호텔 신축현장

  • Jeong, Tae-Yeong
    • The Safety technology
    • /
    • no.192
    • /
    • pp.16-18
    • /
    • 2013
  • 국제관광도시로서의 명상을 돈독히 다지고 있는 제주도. 최근 이곳의 관광업 관계자들은 물론 지역주민들은 한껏 기대감에 부풀어 올로 있다. 바로 롯데건설(주)이 시공하는 제주시티호텔이 다음 달이면 준공될 예정이기 때문이다. 실제로 이곳은 제주도 내에서 가장 높은 건축물(90m)로 탄생하면서 랜드마크 역할을 톡톡히 할 것으로 전망되고 있다. 이곳 현장은 지난 2011년 8월 구 제주일보 사옥 철거공사를 시작으로 2011년 12월부터 TOP DOWN 및 UP-UP공법을 병행하여 토공, 골조공사를 본격적으로 착수했다. 현재는 공정율 85% 수준으로 건물외부 코깅작업 및 내부 인테리어 마감작업이 진행 중이다. 이곳이 특히 주목받고 있는 이유는 롯데건설(주)의 안전관리 기술력이 집약된 또 하나의 건축물이라는 평가를 듣고 있기 때문이다. 롯데건설(주) 관계자들은 이곳에 면세점과 호텔 등 다중이용시설이 들어서기 때문에 부실시공은 곧 대형안전사고를 불러온다는 인식을 바탕으로 빈틈없는 안전시공을 해나가고 있는 것이다. 이는 물론 현장 근로자들을 대하는 안전관리에도 고스란히 나타난다. 착공부터 현재까지 무재해 100만 시간을 앞두고 있다는 점이 이를 잘 증명한다. 안전으로 제주도의 새로운 명소를 건서래 나가고 있는 롯데건설(주) 제주시티호텔 신축현장을 찾아가 봤다.

  • PDF

Application Method of Remote Site Monitoring in Public Road Construction Projects (공공 도로건설사업에서의 원격 현장모니터링 적용방안에 관한 연구)

  • Ok, Hyun;Kim, Seong-Jin
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.12
    • /
    • pp.6550-6557
    • /
    • 2013
  • The public road construction projects awarded by the regional construction and management office, which is an affiliate of the Ministry of Land, Infrastructure and Transport, are managed by construction supervision officers. These officials frequently visit a large number of construction sites to conduct inspections and supervision tasks. Therefore, the site management efficiency is essential in terms of the time and money spent in travelling to the sites. The introduction of a site monitoring management system is considered necessary to minimize the number of site visits and enable remote monitoring of the construction progress to enhance the business efficiency of the construction supervision officers. In this study, a remote site monitoring system was constructed using web cameras for public road construction works. The trial applications were implemented by selecting ten constructions sites. The effectiveness of the system was analyzed to assess its applicability. In an assessment of the applicability of the verification results, remote site monitoring showed cost savings of approximately 35% compared to the existing site management. The guidelines for applying the site monitoring management system were provided, the introduction plan was investigated, and the improvement method was presented. The results showed that the system is likely to minimize the unnecessary site visits, remove the risk factors at vulnerable areas in the sites beforehand, and prevent a range of disasters and accidents. In addition, the quality of the infrastructures is likely to improve through the prevention of accidents and the elimination of substandard and faulty construction work.

Analysis of Competency Assessment Using IPA for Construction Project Managers (IPA 기법을 활용한 현장소장 역량 요인 도출 및 분석)

  • Kim, Hwa-Rang;Lee, Na-Kyung;Jang, Hyoun-Seung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.1
    • /
    • pp.115-123
    • /
    • 2013
  • Changes have occurred in the professional capabilities of the construction project managers after the global financial crisis. As representatives of construction companies and projects, construction project managers have full responsibility over a construction project. Throughout its life cycle, from design through construction to completion, the business capabilities of such managers are regarded as critical elements in the changes in the country's construction economy. Therefore, this study aimed to determine the main capabilities of current construction project managers, and to analysis of its competitiveness using Important-Performance Analysis(IPA). The results of IPA were as follows; (1)capability to win new contracts and capability to collect information of new project are needed for external relation competitiveness, (2)gerentocratic management mind-set and active breakthrough are needed for internal project management competitiveness, and (3)capability to predict issues and self-improvement are needed for self discipline competitiveness. However, this work is still considered to provide the basic data that can help Korean construction companies who plan to educate the project manager's strengthen their medium and long-term capabilities.

Development of CITIS Model and Analysis of Its functionality as a Collaborative Virtual Factory for Construction Projects (건설프로젝트의 협업적 가상기업으로서의 CITIS 모델개발 및 성능분석에 관한 연구)

  • Han Seung Heun;Chin Kyung Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.2 s.10
    • /
    • pp.87-98
    • /
    • 2002
  • Korea government is making an effort to improve the efficiency in construction industry by introducing CITIS (Contractor integrated Technical Information Service). In order to provide a base for the application of CITIS into the construction industry, this research provides a concept of virtual factory which should be incorporated into CITIS system for the successful collaborative work in the virtual space. It then implements a prototype system through process and data modeling to apply into the road construction projects. The prototype system is tested to verify its efficiency. Finally, lesson learned from these works is provided to advance the current CITIS toward a collaborative virtual factory.

A Study on Productivity Analysis of Quality Management System in Construction Site (건설현장 품질관리 자동화 시스템의 생산성 분석에 관한 연구)

  • Choi, Yeongjun;Oh, Hyunchul;Baek, Kihyun;Kim, Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.3
    • /
    • pp.17-26
    • /
    • 2024
  • Quality management work at construction sites demands substantial time and effort, involving the preparation of documents in Excel, approval processes, and the execution of quality tests. These Excel-based tasks include printing quality test reports, performing quality tests, generating and approving test reports, and preparing management ledgers. This division of processes extends the duration of work and diminishes efficiency. Accordingly, a cloud-based construction site quality management system was developed to enhance the productivity of quality management work. The purpose of this study is to analyze the productivity of the construction site quality management system, which is in the early stages of implementation at construction sites. This study implemented the construction site quality management system at a road construction site and scrutinized subsequent alterations in the quality management workflow before and after the implementation. Additionally, a survey was conducted among quality control engineers to collect data on work time both before and after the introduction of the construction site quality management system. Based on the collected data, the Monte-Carlo simulation method was applied to analyze the productivity improvement effect of the construction site quality management system, and the results were presented. The results of this study can serve as foundational data for future research endeavors focused on the automation of quality management works.

Evaluation of Project Manager's Leadership in Construction Projects (건설사업 현장소장의 리더십 평가에 관한 연구)

  • Gang, Ji-Sun;Kim, Han-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.1
    • /
    • pp.151-159
    • /
    • 2010
  • Leadership is a critical factor for success or failure of an organization. Project managers in construction projects are 'field CEO' so their leadership affects performance of the projects. The objectives of this study is to evaluate the leadership of project managers and to analyse its major characteristics. The LBDQ(Leader Behavior Description Questionnaire) technique was used to evaluate and identify types of leadership of project managers from 'heaven' and 'hell'. Relationships between leadership and performance of the projects were also discussed.

The Development of Road Signs Mobile Application for Managing Road Signs Efficiently (도로표지의 효율적 관리를 위한 도로표지 모바일 어플리케이션 개발)

  • Baik, Sang-Keun;Hong, Chang-Hee;Kim, No-Min;Park, Hyun-Keun
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2013.05a
    • /
    • pp.835-838
    • /
    • 2013
  • 국토해양부에서는 전국 도로표지의 효율적인 관리를 위해 국내 300여개 도로표지 관리기관에서 도로표지업무에 활용할 수 있도록 2001년 웹 기반의 도로표지전산관리시스템을 구축하였고, 2003년 도로표지종합관리센터를 설립하여 지속적으로 운영해오고 있다. 이는 네트워크 기반의 도로망도 상에서 전국 도로표지를 연계하여 관리할 수 있어 도로표지의 안내 연결성 확보 등 국내 도로표지 관리업무에 많은 부분 기여해 왔다. 최근 들어서는 모바일 환경이 구축되면서 인터넷이 연결된 사무공간 외에 현장에서도 시스템을 활용하고자 하는 요구가 증가하게 되었다. 따라서 도로표지종합관리센터에서는 도로표지전산관리시스템 이용자들의 편의를 증진하기 위하여 현장지원을 위한 도로표지 모바일 어플리케이션을 개발하였다. 모바일 어플리케이션은 스마트폰, 스마트패드 등 3G/4G/Wi-Fi 등 무선통신이 가능한 다양한 모바일 스마트 기기를 활용하여 도로표지전산관리시스템의 기능을 현장에서 활용할 수 있도록 하였으며, 현장이라는 공간 특성을 반영하여 쉽고 간단하게 기능을 구현하였다는 데 특징이 있다. 이를 통해 도로표지 담당자들은 언제 어디서든 도로표지 정보의 조회가 가능하고, 현장조사 시 표지 사진과 관련 정보를 수집하여 현장에서 즉시 도로표지전산관리시스템에 표지정보를 입력하거나 수정 할 수 있다. 현재는 모바일 어플리케이션 버전 1.0이 개발된 상태이며, 향후 다양하고 반복적인 사용자 활용 패턴을 면밀히 분석하여 보다 사용하기 쉽게 도로표지전산관리시스템 기능을 사무공간에서와 같이 모바일 어플리케이션도 사용할 수 있도록 지속적으로 개선해 나가고자 한다.

An Implementation of Construction Machine Noise Simulation System (건설 장비 소음 예측 시스템의 구현)

  • Lee, Jung-Hwan;Kim, Ju-Ryong;Seo, Jeong-Min
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2011.01a
    • /
    • pp.21-24
    • /
    • 2011
  • 일반적으로 공사현장에서 발생하는 건설소음은 주변 생활환경을 해치는 중요한 원인으로 대두되고 있으며, 최근에는 건설공사 주변에 거주하는 주민들로부터 많은 민원을 낳고 있다. 따라서 최근에는 각종 공사 시 설계 및 시공단계에서부터 건설 소음에 대한 영향평가를 실시하여 규제기준치를 초과하면 방음벽 설치나 기타 방음 대책 등에 대한 적극적인 검토 및 보완을 요구하고 있다. 이러한 관점에서 본 연구는 건설 현장고 인접해 사업계획 승인단계에 있는 현장을 대상으로 음향시뮬레이션 프로그램을 이용하여 건설 소음도를 예측하였다. 이러한 연구는 향후 각종 건설 현장과 소음 영향평가, 방음대책 수립 시 중요한 자료를 제공할 시스템으로 예상된다.

  • PDF