Korean Journal of Construction Engineering and Management
/
v.6
no.1
s.23
/
pp.205-211
/
2005
Turnkey projects accounting for some $10\%$ of the total volume of the projects in the domestic market have been often implemented without the process of full-scale review or study because of clients' lack of expert and expertise. Moreover, many projects have been executed under the terms and conditions of the contact which were found to be unilaterally in favor of the clients. The study, as part of effects to mitigate the claims that would possibly be caused by the potential problems with the typical turnkey projects, were intended to identify the elements of the claims virtually being occurred at the construction sites, and then analyze the degree of influence on the project so as to be able to incorporate the outcome into the plan at the working-levels. As a result of experts' review, through the survey, of the elements once extracted, those having relatively higher degrees of influence on turnkey projects were determined, and the investigation aimed at estimating the amount of claims in terms of value were conducted to eventually identify, evaluate and verify the elements that had affected the Project together with the degree of influence.
Avoiding a fault zone would be a best practice for safety in underground construction, which is only sometimes possible because of many restrictions and other field conditions. For instance, there is an ongoing conception of Korea-Japan subsea tunnels that inevitably cross a massive fault system in the Korea Strait. Therefore it was deemed necessary to find an efficient way of predicting the likely behaviour of underground structures under fault slip. This paper presents the findings from simple numerical analysis for investigating the stress induced at a normal fault with a dip of 45 degrees. We used a boundary element software that assumed constant displacement discontinuity, which allowed the displacement to be estimated separately at both the fault's hangingwall and footwall sides. The results suggested that a principal stress rotation of 45 degrees occurred at the edges of the fault during the slip, which was in agreement with the phenomenon for fault plane suggested in the body of literature. A simple numerical procedure presented in this paper could be adopted to investigate other fault-related issues associated with underground structure construction.
KSCE Journal of Civil and Environmental Engineering Research
/
v.26
no.3D
/
pp.353-359
/
2006
Image frame analysis is a conventional way of evaluating loop detector's performance. In image frame analysis, the time to evaluate performance is linearly proportional to the number of evaluated subjects, and the results can be subjective, depending on operator's personal evaluation standards and physical condition. Also, this method is often inferior in accuracy to that provided by the evaluated devices. Therefore, it is critical to develop a portable standard system which has better accuracy and more objectivity in evaluating vehicle detectors. This paper discusses function and reliability of tape-switch detector, which can be a replacement for image frame analysis, for effectively measuring traffic volume, speed, and occupancy.
Magazine of the Korean Society of Agricultural Engineers
/
v.34
no.1
/
pp.10-19
/
1992
서해안 시대를 맞이하여 21세기를 열어나갈 새萬金 千拓綜合開發事業 기공식이 지난해 11월 28일 전북 부안군 변산면 대항리 현장에서 盧泰愚대통령, 曺京植농림수산부장관, 金榮鎭農漁村振興公私社長, 국회농림수산위원회 위원장, 전북도지사, 地域出身國會議員등 내외 귀빈과 지역 주민 2,400여명이 참석한 가운데 열려 사상 최대의 간척사업으로서 첫발을 내딛었다. 이날 盧泰愚대통령은 치사를 통해 "자손만대에 물려줄 웅대한 국토확장의 첫삽을 뜨게 되어 깊은 감회를 느낀다"면서 "만경, 김제의 넓은 벌이 우리나라의 곡창으로 겨레의 삶을 보장해온 터전이었듯이 새만금의 광활한 간척지를 21세기 번영을 기약하는 땅이 되도록 하자"고 당부하였다. 새만금사업의 공사기간은 '91년부터 98년까지 외곽방조제를 완공하고 2004년까지 내부개발을 완료할 예정이고, 총 사업비 1조 3천억원을 투입하게된다. 사업지역은 1도 3군 1시 19읍면동 (전북 옥구군, 부안군, 김제군, 군산시)에 걸쳐서 40,100ha를 개발하게 된다. 주요시설로는 부안군 변산면 대항리에서 可力島, 新侍島, 夜味島, 및 飛鷹島를 연결하는 세계 최장의 방조제 33km를 축조하고 방조제 위에는 4차선 도로를 설치하고 장항선이 군산하구둑을 경유, 이 방조제를 거쳐 고군산군도까지 갈 수 있도록 하는 철도부지도 건설된다. 이와 함께 새만금국제항을 개설, 연간 5,000만톤의 하역능력을 갖게 되고 고군산군도를 잇는 관광휴양지가 형성된다.
국책사업이나 SOC의 확충을 위한 도로 및 철도의 건설에서 적용되는 터널의 단면크기를 보면, $50m^2$에서부터 $100m^2$이상의 중 대단면 터널이 주를 이루고 있으나, 전력구, 통신구, 소규모로 운영되는 광산의 채광용 터널, 용수를 위한 도수로터널 등 특수한 용도로 설계, 시공되고 있는 터널에서는 $20m^2$이하의 단면크기를 갖는 경우가 있다. 이러한 소단면 터널의 경우에는 협소한 작업공간으로 인하여 적용공법 뿐만 아니라 장비의 사용 또한 제약을 받게 되어 작업효율이 저하되고 공사기간이 늘어나게 되는 등 여러 가지 문제점을 안고 있다. 특히, 에멀젼 폭약을 사용하는 발파에서 먼저 기폭된 발파공의 충격압력에 의해 인접공의 폭약이 예비압축(Precompression)되어 사압현상을 일으키고 잔류약을 발생시키는 사례가 종종 발생하고 있다. 사압현상은 당해 발파의 실패와 함께 2차적인 사고의 위험요인이 될 수 있으므로 이를 방지하기 위한 대책을 수립하여야 한다. 이를 위해 기존 문헌을 통하여 사압현상의 원인과 발생 가능성을 검토하였고, 국내에서 주로 사용되는 에멀전폭약의 수중 내충격성시험과 충격압력 전달시험을 실시하여 사압현상의 발생정도를 측정하였으며, 사압현상이 발생한 소단면 터널현장을 대상으로 대책을 수립하여 적용하였다. 심발방법을 변경하여 전단의 충격압력을 견딜 수 있는 공간격을 확보하고 뇌관의 초시간격을 적절하게 배치한 발파패턴을 적용한결과, 사압현상을 억제하고 잔류약의 발생을 감소시켜 계획 굴진장을 확보하고 파쇄석의 크기를 감소시키는 등 양호한 결과를 얻을 수 있었다.
Journal of the Korea Institute of Building Construction
/
v.20
no.6
/
pp.497-504
/
2020
In Korea construction industry, researches are being conducted to reduce the disasters related tower crane due to the increase of tower crane's usage and accidents continuously. Although the usage amount of remote control tower crane has been increasing recently, the research on remote-control tower crane is insufficient. In this study, the importance ranking of remote control tower crane's accident factors derived by AHP analysis. AHP questionnaire was conducted to engineers (or operators) like construction site engineer, construction manager, safety engineer, and tower crane operator, who have more than 10 years career. The results of AHP analysis reveal that top ranking factor of remote control tower crane's accident is lifting work for materials. Therefore, the high importance factors should be managed, and taken the priority measures for reducing the tower crane accidents by using the results of this research.
Kim, Woo-Jae;Park, Dong-Cheol;Yang, Wan-Hee;Lee, Sea-Hyun
Proceedings of the Korea Concrete Institute Conference
/
2008.04a
/
pp.961-964
/
2008
There are researches in progress on ensuring the safety of the high impact concrete in case of fire which is a current rising social problem and this research institute also developed PFB technology, the explosion preventing technology. PFB technology is to apply POSCO E&C Fire Board, a fireproof board, with an adhesive agent on the construction site, and this technology passed 3-hour fireproof test and this technology was proven from a previous research that the temperature of main root is maintained under $200^{\circ}C$. Therefore, tests on basic contents was performed in this research before the actual construction, with a full scale of wooden prototype to apply PFB technology to actual construction sites and the tests were done on the workability of fireproof board, the adhesive power, the resistance against imprint of wooden nail, the heat conductivity and etc. As the results of these tests, PFB technology was proven to have an excellent workability at a construction site and to be easy for processing and also, this technology was proven to have a great resisting power against imprint of wooden nail. Therefore, this research has confirmed that PFB technology has no problem to be applied on a construction site.
Kim Jeong-Woong;Seo Jea-Hwa;Yang Mu-Seok;Yuk Il -Dong
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.232-239
/
2001
Young Jong Grand Bridge is approach traffic road of New Inchon International Airport which covers hub airport function in northeast asia. The total span length of this bridge is $4,420{\cal}m$ and this main bridge type is, the first in the world, Double Deck Self Anchored Suspension Bridge, designed as double deck systems to be arranged by road and railroad. Approach bridges to be connected with main span also are composed double deck steel truss and steel box girder to consider a continuity with this span. Our company erected $1,375{\cal}m$(about 60,000tons) of double deck steel truss bridge type which is composed by 6 traffic lane on upper deck and 4 traffic lane and Double track railroad on lower deck. The original installation method of this bridge was planed to install about 75 meters bridge blocks to use floating crane, after temporary bent was constructed between permanent piers. But this method which had to construct many temporary bents in the sea had the matter that construction periods can become lengthen and construction cost can be risen. To overcome the uncertainty to ensure high qualify of bridge and economic project execution, our company developed new bridge erection method to assure both quality control and economic construction work. The new erection method which was developed by us was one that could transport and install long bridge block, $120{\cal}m$ unit at a time and that temporary bent was not required. We hope that this paper is used as technical data which will erect bridge in the western sea and others marine region.
Kim, Jinyoung;Baek, Sungha;Kim, Namgyu;Choi, Changho;Kim, Jisun;Cho, Jinwoo
Journal of the Korean GEO-environmental Society
/
v.23
no.8
/
pp.11-16
/
2022
The compaction process using vibrating rollers in road construction is essential to increase soil stiffness in earthworks. Currently, there is no clear standard for the operation method of the compaction roller during compaction. Although simple quality inspection techniques have been developed, plate load test (PLT) and field density test (FDT) are the most frequently used test methods to evaluate the degree of compaction during road construction as the most frequently used quality inspection methods. However, both inspection methods are inefficient because they cannot perform quality inspection in all sections due to time and cost reasons. In this study, we analyzed how the operating conditions of vibrating rollers affect the compaction quality. An intelligent quality management system, which is a currently developed and commercialized technology, was used to obtain quality inspection results in all sections. As a result of the test, it was analyzed that the speed and vibration direction of the compaction roller had an effect on the compaction degree, and it was found that the compaction direction had no effect on the compaction degree.
This study is the basic research to develop the customized base module for modular road system. A case study was carried out on designs of base module for soft soil condition. Two types of base module was proposed; crossbeam module and crossbeam-pile module. Based on the case study, it was verified crossbeam-pile module is suitable for soft soil condition and the optimum dimension of crossbeam-pile module for modular road system constructed on soft soil was determined. For development of the optimal base modular for modular road system, it is needed in the future to build a data base about ground and roadbed of road construction sites and to classify and systemized base modules according to soil conditions through many case studies.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.