• Title/Summary/Keyword: 도로분야 건설기술자

Search Result 3, Processing Time 0.014 seconds

An Analysis of Perceptions by Road Construction Engineers on ICEC Framework at the Time of System Transition, from Responsibility Supervision to Construction Management(I) - Main Focus on ICEC Framework - (책임감리가 건설사업관리(CM)로 전환시 도입된 역량지수(ICEC)에 대한 도로건설기술자들의 인식 분석(I) - 역량지수 등급 체계를 중심으로 -)

  • Park, Hyo-Sung;Kim, Nak-Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.5
    • /
    • pp.1147-1156
    • /
    • 2015
  • The result of responsibility supervision system which has been enforced for the last twenty (20) years since January, 1994 is evaluated, and keeps an eye out the process of unification and absorption of the system into the construction management (CM). As a baseline data for this study, the grade framework of construction engineer's ICEC introduced with CM is summarized. In this manuscript, the questionaire survey for CM and ICEC was conducted toward the target group of road field construction engineers and analyzed the outcome of the respondents' answers. 50% of the respondents have answered positively for the question about converting responsibility supervision to CM. 48% of the respondents from construction works field have answered positively for converting responsibility supervision system to CM while 38% of the respondents from engineers of supervision field have answered positively, less positive than the answers from works field engineers. 46% of overall respondents have answered, however, to maintain the present system of 40%, 40% and 20% on the survey to the question asking the opinion on the ways of calculating ICEC to use the rates : 40% of career, 40% of qualification and 20% of academic achievements. However, it appeared that engineers who have comparative advantages with academic achievements and career, and engineers with lower grade qualification demanded higher rate for career.

An Analysis of Perceptions by Road Construction Engineers on ICEC Framework at the time of System Transition, from Responsibility Supervision to Construction Management (II) - Focused on CM Terminology & ICEC Coordination - (책임감리가 건설사업관리(CM)로 전환시 도입된 역량지수(ICEC)에 대한 도로건설기술자들의 인식 분석(II) - CM 용어와 ICEC 조정을 중심으로 -)

  • Park, Hyo-Sung;Kim, Nak-Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.6
    • /
    • pp.1357-1366
    • /
    • 2015
  • This study (II) aims to draw up the future-oriented construction policy recommendations based on the outcomes as a result of a broad research and conducting questionnaire surveys on the arguable issues raised by construction engineers for roads and bridges in the course of previous study (I) implementation. As for the question of "The term 'Construction Management (CM)' which currently is defined in two (2) ways", 45% of respondents have answered that two (2) different types of CM should be unified into one (1) CM type as is the case in most advanced countries. About the question of "The ways to educate the CM professionals", many respondents have preferred to acquire CM professional certificate after receiving education for a certain period of time from private CM training institutions. As for the question of The revised draft that the ICEC grade of special engineers for design, construction and quality control areas shall be "more than 78 points from a more than 75 points by the original draft." 52% of respondents preferred to maintain the original draft. About the question of "The reason why the CM system has not been working well yet." 62% of respondents have answered that the staff members who are in charge of handling public project procurements are concerned about the fact that their roles (or activities) might be deprived as a result of CM adoption. In order for the CM system to be activated, based on the notion that the construction projects must be out soured, the reshuffle of the headquarter organization of Ministry of Land, Infrastructure and Transportation (MLIT) should be preceded.

A Successful Beginning for Fiber Reinforced Polymer(FRP) Composite Materials in Bridge Applications (섬유보강폴리머(FRP) 복합재료의 교량 적용)

  • 김지상
    • Magazine of the Korea Concrete Institute
    • /
    • v.13 no.5
    • /
    • pp.77-81
    • /
    • 2001
  • 부식 열화는 교량 기술자들에게 있어서 지속적인 도전을 요구하는 문제가 되어왔는데, 스텔스 항공기를 개발하게 한 새로운 재료 기술은 교량의 부식을 해결할 수 있게 하였다. 즉, 경량의 고강도 재료로 높은 피로 저항성을 갖고 있고, 부식에 강한 복합체는 교량의 재료로서 아주 바람직한 성질을 갖고 있다 섬유 보강 폴리머(FRP) 복합재료를 교량의 건설에 이용하려는 프로젝트는 1998년 현재 80 여 개가 넘게 진행되고 있는데, 이 중 미국 내에서 31개의 프로젝트가 수행되고 있다. 이 글은 미국 내에서 FRP복합체를 교량 공학 분야에 적용하려는 초기의 성공적인 시도들에 관한 내용으로 복합체의 장점, 특성, 교량 적용시 고려 사항, 그리고 향후 복합재료에 관한 기술을 토목 구조물에 적용하는데 필요한 소요 기술 등에 관하여 정리한 것이다. 이 새로운 재료는 신설 구조물의 건설과 기존 교량의 보수 및 보강에 모두 적용할 수 있으며, FRP복합체 기술을 토목 구조물과 기반 시설물 건설 분야에 적용하는 것은 지금까지 성공적인 결과를 보여 주고 있다 미국연방도로국(FHWA, Federal Highway Administration)은 이 기술을 미국 내 교통 기반 시설물인 신규 교량의 건설은 물론 기즌 교량의 보수 및 보강에 활용하는 방안에 대하여 관심을 갖고 있다.