• Title/Summary/Keyword: 댐 저수용량

Search Result 95, Processing Time 0.027 seconds

Assessing greenhouse gas footprint and emission pathways in Daecheong Reservoir (대청댐 저수지의 온실가스 발자국 및 배출 경로 평가)

  • Min, Kyeong Seo;Chung, Se Woong;Kim, Sung Jin;Kim, Dong Kyun
    • Journal of Korea Water Resources Association
    • /
    • v.55 no.10
    • /
    • pp.785-799
    • /
    • 2022
  • The aim of this study was to characterize the emission pathways and the footprint of greenhouse gases (GHG) in Daecheong Reservoir using the G-res Tool, and to evaluate the GHG emission intensity (EI) compared to other energy sources. In addition, the change in GHG emissions was assessed in response to the total phosphorus (TP) concentration. The GHG flux in post-impoundment was found to be 262 gCO2eq/m2/yr, of which CO2 and CH4 were 45.7% and 54.2%, respectively. Diffusion of CO2 contributed the most, followed by diffusion, degassing, and bubbling of CH4. The net GHG flux increased to 510 gCO2eq/m2/yr because the forest (as CO2 sink) was lost after dam construction. The EI of Daecheong Reservoir was 86.8 gCO2eq/kWh, which is 3.7 times higher than the global EI of hydroelectric power, due to its low power density. However, it was remarkable to highlight the value to be 9.5 times less than that of coal, a fossil fuel. We also found that a decrease in TP concentration in the reservoir leads to a decrease in GHG emissions. The results can be used to improve understanding of the GHG emission characteristics and to reduce uncertainty of the national GHG inventory of dam reservoirs.

Utilization of Peace Dam for Conservation Purpose (이수측면에서 평화의댐 활용방안 연구)

  • Yi, Jae-Eung;Lim, Dong-Sun;Lee, Jong-Tae
    • Journal of Korea Water Resources Association
    • /
    • v.37 no.8
    • /
    • pp.653-662
    • /
    • 2004
  • In this study, the method of Increasing the flood control as well as conservation effects is studied by joint operation of Hwacheon and Peace Dam. After completing the second phase of the construction of the Peace Dam, the dam crest height will be increased from 225m and the storage capacity will also be increased. If storage capacity is increased and gates are installed, it will assist not only flood control but also conservation of the entire Han river basin. Considering the change of conservation levels, the change of the restricted water level of the Hwacheon Dam in flood season, and the inflow change into the Peace Dam through the simulated reservoir operation, the annual average power of Hwacheon Dam with 95% reliability, annual firm power, the volume of water supply is calculated. As a result, when the conservation level of the Peace Dam and the restricted water level of the Hwacheon Dam are increased, the generation capacity will be improved. However, even though the inflow decrease, the generation capacity will not be affected. If the inflow decrease under the same conditions, the water supply capability will be reduced to the range from 35% to 40%. It is necessary to increase conservation level to keep the same water supply capability.

A Fundamental Comparison and Enhancement of Simulation and Optimization Modeling Approach for Multiple Reservoir Operation (댐군 연계운영에서 시뮬레이션 기법과 최적화 모형 활용기법의 원론적 비교 및 개선방법에 대한 연구)

  • Kong, Jeong-Taek;Kim, Jae-Hee;Kim, Sheung-Kown
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2012.05a
    • /
    • pp.118-118
    • /
    • 2012
  • 수자원의 효율적 이용 및 관리는 심화되고 있는 기후변화에 선제적으로 대응하고 발생가능한 물위기에 대비하기 위한 필수조건이다. 그 중 가장 핵심이 되는 요소는 댐에 저수된 물을 효과적으로 이용하는 것, 즉 댐 건설목적에 따라 시간 및 공간별로 적절하게 할당시키는 것이라고 할 수 있다(Kim, 1998). 그러나 단일 댐의 운영과는 달리 수계내 댐군의 연계 운영은 매우 복잡하고 어려운 문제이다. 연계된 댐들간 저수 상황을 고려하여 유역내 시 공간적인 용수 수요의 지속적인 충족을 위하여 유입량 예측의 정확성을 높이도록 하고, 상류 댐에 최대한 저류하도록 하며, 여수로 방류 같은 불필요한 방류를 최소화 하고, 서로 상충되는 목표를 갖고 있지만, 홍수용량 및 발전수위를 최대로 확보하도록 하여야 한다. 이처럼 댐 운영을 위한 실제 상황은 단일 목적에 의한 최적화와는 달리 여러 상충되는 목적 및 구성 요소들간의 타협, 조정을 필요로 한다. 댐군의 연계운영 문제는 1960년대 초부터 현재까지 활발히 연구가 진행되어 온 분야 중 하나이나 문제의 복잡성과 어려움으로 인해 아직까지도 최선의 방안을 제시하기 어려운 문제이다(ReVelle, 2000). 이를 위한 방법은 시뮬레이션 모형 활용기법과 최적화 모형 활용기법으로 대별할 수 있으며 각 방법의 서로 다른 구조적 특성과 장단점으로 인하여 이원화된 체계로 사용되는 것이 현재의 국내 실정이다. 대부분의 실무에서는 이해도도 쉽고, 비교적 결과를 빨리 도출할 수 있는 시뮬레이션 기반의 모형을 활용하며 대표적으로 HEC-5, K-ModSim, HEC-ResSim 등이 활용되어왔다. 반면, 학계에서는 DP, MIP, SLP, SDP 등 최적화기법을 댐운영에 활용 할 것을 제안하고 있지만, 활용에 대한 거부감이 남아있는 것이 현실이다. 본 연구에서는 시뮬레이션과 최적화기법의 원론적 비교를 통해 각 방법의 장단점과 한계점을 분석하고, 왜 이원화된 사용체계로 되었는지에 대한 고찰과 이에 대한 해결책으로 시뮬레이션모형의 장점과 최적화기법의 장점을 결합한 모형을 제안한다. 국내에는 Kim and Park(1998)이 시뮬레이션 기반의 최적화 모형 CoMOM(Coordinated Multi-Reservoir Operating Model)을 개발하였으며, 이후 21C프론티어 연구사업(2001-2011)에서 모형의 보완수정 검증을 통해 실무 활용도를 높여 왔다. 본 연구를 통하여 거부감의 원천을 추적해 보고, 타당한 이유가 있는지 대한 것을 심층 분석해보고, CoMOM모형과 시뮬레이션 모형, 다른 최적화 기법들과의 원론적 비교를 통해 각 방법들의 효율적인 활용방안과 최적화모형의 구체적인 활용방안을 제시하고자 한다.

  • PDF

Optimal Reservoir Operation using Adaptive Neuro-Fuzzy Inference System (적응 퍼지 제어기법을 이용한 저수지 운영 최적화)

  • Kim, Jin-Ho;Chung, Gun-Hui;Lee, Do-Hun;Lee, Eun-Tae
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2010.05a
    • /
    • pp.779-783
    • /
    • 2010
  • 최근 들어 그 심각성을 더하고 있는 이상기후 현상으로 가용 수자원의 변동이 커지고 있으며, 이에 따라 수자원의 효율적인 운영이 요구되고 있다. 그러나 효율적인 운영을 위해서는 미래 유입량의 불확실성의 고려하고, 홍수 조절용량의 확보하면서도, 용수공급을 위한 저수량을 확보하고, 수력 발전을 해야 하는 복잡한 상황을 모두 고려하여야한다. 이러한 복잡한 시스템에서 하나의 최적화 기법으로는 모든 고려사항들을 만족시키는 최적해를 찾는 것은 사실상 불가능에 가깝다. 그러므로 저수지 운영의 최적화를 위한 연구에서 한 가지 이상의 기법을 조합하는 기법을 사용하게 되었다. 이러한 기법은 각 기법의 장점을 취하고 각각의 한계를 극복하기 위해 주로 사용되었다. 본 연구에서는 저수지 운영 최적화를 모의하기 위하여 대청댐에서의 저수위, 유입량, 용수이용량 등을 고려하여 방류량의 예측을 동적 계획법(Dynamic Programming Model)으로부터 동적 신경망(Dynamic Neural Network Model)과 적응 퍼지 제어기법(Adaptive Neuro-Fuzzy Inference System)을 개발하여 실제 방류량과 세 가지 최적화 방법에 의한 결과를 비교 검정하였다. 본 연구의 수행으로 인해 얻어진 결과를 요약하면 다음과 같다. 첫째, 동적 신경망과 적응 퍼지 제어기법에 의한 최적화 모의가 동적 계획법에 비해 시스템의 구축이 쉽고 유연하다. 둘째, 퍼지추론의 Membership 함수의 구축에 따라 단시간에 많은 양의 강우가 발생하는 국지성 강우에 대해서도 최적 방류량을 예측할 수 있다. 셋째, 저수지 운영 과거자료의 부족과 불확실성을 해결하면, 보다 용이하고 양호한 예측결과를 얻을 수 있을 것이다.

  • PDF

2-Dimensional Numerical Model for Sediment Transport considering the Impact of Helical Flow (Helical Flow의 영향을 고려한 2차원 하상변동모의)

  • Kim, Mujong;Lee, Seonmin;Choi, Sung-Uk
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2016.05a
    • /
    • pp.64-64
    • /
    • 2016
  • 하천은 인간에게 용수의 이용 및 하천호안의 휴식처로써의 이용을 통해 직접적인 영향을 주고, 하천구조물의 심미적 영향, 랜드마크로써의 역할을 통해 간접적인 영향을 준다. 또한, 하천은 하천생태계에 서식하는 동 식물에게 영향을 준다. 그러나 하천유사로 인해 통수능이 감소하고, 하천구조물 주변에 침식을 야기할 뿐만 아니라, 댐과 저수지에 유사의 퇴적으로 저수용량의 감소시킨다. 그러므로 이를 예측하는 것은 경제적, 환경적으로 중요하다. 하상변동의 모의를 위해 기존의 2차원 모형은 만곡흐름에서 유동의 helical flow를 고려하지 않아 예측이 부정확하였다. 본 연구에서는 천수방정식을 이용한 하상변동 수치모의에 helical flow의 영향을 고려하였다. 하천과 같은 천수영역에서의 흐름 및 하상변동을 해석하기 위하여 수심평균 된 Navier-Stokes equations인 천수방정식을 이용하였다. 지배방정식은 곡선 좌표계에서 유한체적법으로 차분하였고, 비엇갈림격자를 사용하였다. 지배방정식의 닫힘 문제를 해결하기위해 0-방정식 난류모형을 사용하였고, "time marching" 기법의 적용을 위해 계산단계분할 방법을 이용하였다. 비엇갈림격자의 사용으로 인해 검사체적의 면에서의 유속이 필요하여 pressure-velocity coupling을 사용하여 유속의 진동을 줄였다. 또한, 만곡부의 helical flow를 모의하기위해 helical flow intensity model을 도입하였다. 앞에서 계산한 흐름을 바탕으로 유사량 산정공식과 Exner 방정식을 이용하여 하상변동을 모의하였다. 흐름의 검증, helical flow의 영향에 대한 확인, 하상변동의 적용을 위해 선행연구의 실험이 사용되었다.

  • PDF

Loss and Sediment Estimation for the Precise Monitoring of Surface Soil (표토의 정밀 모니터링을 위한 유실 및 퇴적량 산정)

  • Kang, Young Mi;Kang, Joon Mook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.1D
    • /
    • pp.141-147
    • /
    • 2006
  • Soil losses are occurred by rainfall has caused productivity decline of a fertile surface soil and inflow sediment on Dam reservoir which are the main reasons of the decrease of storage volume and difficulty of water management. In this study, the amount and location of soil losses which were evaluated using USLE(Universal Soil Loss Equation) were applied on soil, landcover, and topographical conditions on the basis of satellite images and GIS. Furthermore, it was possible to evaluate the amount of riverbed sediments using echo-sounder and sediment rate were analyzed by comparing with soil losses.

Development of Selection Criteria of Small Scale Reservoirs for Emergency Action Plan(EAP) Establishment (소규모 저수지 비상대처계획(EAP) 수립 선정지표 개발)

  • Park, Ki-Chan;Choi, Kyung-Sook
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2019.05a
    • /
    • pp.394-394
    • /
    • 2019
  • 본 연구에서는 최근 기상이변의 영향 및 지진 발생과 저수지 노후화 등으로 지속적으로 발생되고 있는 소규모 저수지 붕괴에 의한 재해 위험성을 경감하고자 댐 저수지 EAP 수립 기준 이하 소규모 저수지를 대상으로 EAP 수립 대상여부를 판단할 선정지표를 개발하였다. 기존의 EAP 수립지침 검토, 과거 붕괴사례 분석, 관련분야 선행 연구 등을 분석하여 저수용량, 제체높이, 경과연수, 호우인자 및 지진인자를 포함하는 5개 선정지표를 정량화 하여 제시하므로 실무적용을 용이하게 하고자 하였다. 또한 개발된 선정지표는 EAP 수립 기준 이하 소규모 저수지에 적용하기에 앞서 각 선정 지표별 저수지 붕괴와의 연관성을 파악하기 위해 과거 저수지 붕괴사례에 단일지표 및 지표간 중첩도를 파악해 보았다. 그 결과, 지진인자, 호우인자, 지진 및 호우인자, 경과연수 지표순 순으로 저수지 붕괴와 높은 연관성을 나타내어, 소규모 저수지 붕괴에 연관되는 주요 지표를 지진인자, 호우인자, 경과연수로 선정하였다. 본 연구에서 선정된 지표간의 중첩정도를 파악하기 위해 과거 저수지 붕괴사례에 적용해 본 결과 호우인자+지진인자가 가장 높은 중첩도를 나타났다. 다음으로 본 연구를 통해 도출된 EAP 수립 대상 선정지표 중 주요 지표인 지진인자, 호우인자, 경과연수를 대상으로 2개의 지표가 중첩될 경우와 3개의 지표가 중첩될 경우를 EAP 수립 대상 관찰그룹과 검토그룹의 각각 분류한 후 이를 재해위험 저수지(MOIS, 2016)에 적용하여 보았다. 그 결과, EAP 수립 대상 관찰그룹에 속하는 경우가 38.5%를 차지하였고, 검토그룹에 속하는 경우가 11.9%를 차지하였다. EAP 수립 대상 관찰그룹에 해당하는 저수지에 대해서는 전문 시설관리자에 의한 주기적 점검 및 계측기 설치를 통한 모니터링 실시 등으로 세심한 시설물 관리가 필요할 것으로 판단되며, EAP 수립 대상 검토그룹에 해당하는 저수지에 대해서는 제체 하류부 구간의 주민 거주 현황, 경작지, 축사 등 재산 현황 및 EAP 수립에 소요되는 예산 등을 종합적으로 고려하여 저수지 관리기관에서 최종적으로 EAP 수립 여부를 결정하여 잠재적인 피해 발생을 사전에 저감시켜야 하겠다. 본 연구의 결과는 기존의 EAP 수립 기준의 보완책으로 활용 가능할 것으로 사료된다.

  • PDF

The Characteristics of Runoff for Hwacheon dam watershed (화천댐 상류유역의 유출거동 특성)

  • Kim, Nam-Won;Lee, Jeong-Eun
    • Journal of Korea Water Resources Association
    • /
    • v.42 no.12
    • /
    • pp.1069-1077
    • /
    • 2009
  • Lately, it is an important concern in water resources research to maintain a stable water supply according to a future climate change and an increase in water use. In Han-River basin, approximately 10 % of water resources that is provided the capital region (Gyeonggi, Seoul etc.) has been reduced as a consequence of the construction of Imnam Dam (storage volume: 27 billion $m^3$) located in the upper Hwacheon Dam upstream area. Therefore, streamflows have decreased in Bukhangang basin, but it could not be evaluated quantitatively. In this study, SWAT-K which is the physically based long-term runoff simulation model, was used in order to evaluate the effect of Imnam Dam on the reduced inflow to Hwacheon Dam according to the change of hydrological condition in the upstream area of Hwacheon Dam. For the model input data of North Korea area, meteorological data of GTS (Global Telecommunication System) were used, and soil maps by FAO/UNESCO (2003) were applied. Temporal variations of water resources is investigated with comparison of observed and simulated inflows at Hawcheon Dam site. Also, annual, monthly, seasonal decreases in water resources were evaluated using the flow duration analysis of simulated streamflows with or without Imnam dam.

A Modeling Study of Lake Thermal Dynamics and Turbid Current for an Impact Prediction of Dam Reconstruction (댐 재개발이 호수 수온 및 탁수 거동 변화에 미치는 영향 예측을 위한 모델 연구)

  • Jeong, Seon-A;Park, Seok-Soon
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.27 no.8
    • /
    • pp.813-821
    • /
    • 2005
  • This paper presents a modeling study of thermal dynamics and turbid current in the Obong Lake, Kangreung. The lake formed by the artificial dam in 1983 for agricultural water supply, is currently under consideration of reconstruction in order to expand the volume of reservoir for water supply and flood control in downstream area. The US Army Corps of Engineers' CE-QUAL-W2, a two-dimensional laterally averaged hydrodynamic and water quality model, was applied to the lake after reconstruction as well as the present lake. The model calibration and verification were conducted against surface water levels and temperature of the lake measured during the years of 2001 and 2003. The model results showed a good agreement with fold measurements both in calibration and verification. Utilizing the validated model, an impact of dam reconstruction on vertical temperature and hydrodynamics were predicted. The model results showed that steep temperature gradient between epilimnion and hypolimnion would be formed during summer, along with extension of cold deep water after reconstruction. During winter and spring seasons, however, the vertical temperature profiles was predicted to be quite similar both before and after reconstruction. This results indicated that thermal stratification would become stronger during summer and stay longer after dam reconstruction. From the examination of predicted water movements, it was noticed that the upstream turbid current would infiltrate into the interface between metalimnion and hypolimnion and then suspended solids would slowly settle down to the bottom before reconstruction. After reconstruction, however, it was shown that the upstream turbid current would stay longer in metalimnion with similar density due to strong stratification. The model also predicted that dam reconstruction would make suspended solids near the dam location significantly decrease.

A Model for Real-time Reservoir Operations during Flood Period.II : Single Reservoir Operating Rules at Daecheong Dam (홍수기중의 실시간 저수지운영 모형(II) - 대청댑의 단일저수지 운영 방안 -)

  • 심명필;박인보
    • Water for future
    • /
    • v.23 no.4
    • /
    • pp.499-507
    • /
    • 1990
  • Real-time reservoir operation models during flood period require optimization of hourly releases from the input data through on-line system. And predicted values. An algorithm of the simulation model to resolve the problem has already been reported with formulation of objectives to minimize the flood damage in downstream reaches and to conserve water at the end of operation for the later use. This paper presents an application of the model to a single reservoir system at the Daecheong Dam during flood and the results are reviewed. This paper also reviews measured inflows and releases in the past. The model is applied to the flood hydrographs of several return periods assuming different reservoir levels at the beginning of the operation. Also it demonstrates the simulation of test run with inflow forecasts obtained by rainfall-runoff model and compares the results. As a result, the model can use efficiently the flood control capacity with consideration of risk factor for the uncertainties associated with inflow forecasts.

  • PDF