• Title/Summary/Keyword: 대형공사

Search Result 460, Processing Time 0.032 seconds

A Study on Analysis and Improvement of the Process of Furniture Work for High-rise Residential Building (초고층주거건축의 가구공사 프로세스 분석 및 개선방안에 관한 연구)

  • Kim Hyun-Woo;Song Young-Woong;Choi Yoon-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.446-449
    • /
    • 2003
  • Recently, large residental buildings including high-rise apartment and a multi-business and commercial-residential building are appearing in the form of Korean construction work. According to this large-size trend a tenn and cost of construction works was largely increased. Therefore, studies of techniques construction management for successful project are lively being progressed. This study introduced Just-In-Time form and Lean Construction concept in order to establish management system of a house construction work taking up much portion on aspects of work scale and materials transportation in finishing works of high-rise residental building architecture. The process of house construction works will be analyzed with these two principles for productivity improvement and then the improvement plan will be suggested. This analysis and proposal can induce the flow of finishing works smoothly and contribute to success of project through saving of a tenn and cost of construction works.

  • PDF

The effect of variations to the benthic macroinvertebrates community after river environment improvement in the Osan Stream (오산천 하천환경정비가 저서성 대형무척추동물 군집변화에 미치는 영향)

  • Kim, Jea-Su;Kwon, Yong-Duk;Kim, Seong-Hwan;Kim, Kook-Il
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2006.05a
    • /
    • pp.977-981
    • /
    • 2006
  • 본 연구는 오산천 하천환경정비로 인하여 저서성 대형무척추동물의 군집변화에 미치는 영향을 파악하기 위하여 2002년 6월부터 2005년 11월까지 5개지점을 선정하여 조사를 실시하였다. 조사기간 중 출현한 저서성 대형무척추동물은 총 4문 7강 16목 38과 81종이었으며, 년도별로는 2002년에는 총 55종이 출현하였으나, 2004년에는 36종으로 종수가 급감하였다. ESB에 따른 군집의 생태점수는 2003년도에 45.4에서 2004년도에는 21.7로 낮아졌다가 2005년도에는 31.2로 높아졌다. 이는 하천환경정비공사로 일시적인 교란을 일으켜 저서성 대형무척추동물의 군집변화에 영향을 미친 것으로 사료된다. 종조성의 변화로는 상류부의 경우 환경정비공사 완료 후 생태계안정화와 추이대가 복원되면서 1급수 지표종인 플라나리아(Dugesia japonica)와 옆새우(Gammarus sp.)가 출현하여 다양한 군집을 형성하고 있었다. 하류의 경우는 군집의 종조성이 빈약하지만 공사가 마무리 단계에 들어가면서 수서생물의 서식처가 안정화되고 있는 것으로 사료된다. 이처럼 저서성 대형무척추동물의 서식에 영향을 주는 하상의 물리적 구조와 이와 연관된 유기물 퇴적층과 토사 퇴적층에 대한 관리가 필요하며, 이를 통하여 하도특성에 맞는 안정된 군집구조가 형성될 수 있도록 대체서식처를 하천환경정비계획 수립 시 고려하여야 한다.

  • PDF

Improving Constructability for Partnering in Large Hospital Construction Projects (대형병원 프로젝트의 시공성 증대를 위한 파트너링 모델 구축)

  • Kim Sang-Il
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.3 s.19
    • /
    • pp.153-165
    • /
    • 2004
  • Most engineering tasks require collaboration between many users in major hospital construction projects that have many reconstructions. Loss and change orders occurred in factors such as information exchange, misunderstandings, advanced technology in hospital projects. Moreover, changes in context, costs, requirements, deadlines, etc. require negotiation of issues that may modify important project characteristics. The objective of this paper is to reduce reconstruction for the pre-construction process of hospital projects, reconstruction factors were analyzed in recent hospital construction project the system was established in order to solve reconstruction factors, and this system was validated through applying to the real project. Therefore it is a major challenge to make high level of communication and to have mutual understanding.

A Study on Substantiation Methodology for Extension of Time in International Mega-Project Claims (해외 대형건설공사 공기지연클레임의 공기연장기간 입증방법)

  • Kim, Young-jae;Kim, Tae-kyoung;Jo, Duk-sang;Lee, Hwang-ku
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.3
    • /
    • pp.165-176
    • /
    • 2015
  • Recently many Korean large-sized construction companies as well as specialty contractors have been expanding their business in the overseas market to mitigate impacts from long-term stagnation in the domestic market. Such as a result, it has been arisen as a major issue that contractors effectively manage the delays which have been commonly faced with in international mega-projects. Therefore it can be said that the ability of the delays management leads a success of project. This paper presents a review of literature for delay analysis methods such as time impact analysis(TIA) and raises practical problems to rationally substantiate the duration of extension of time(EoT) in international mega projects which have wide scope of works as well as complicated and detailed contract baseline programs by taking theoretical approaches. We suggest the two improvement concepts to substantiate the EoT claims which are effectively applicable to practical projects. The first is to sort out dominant delays among numerous delays in advance of applying a delay analysis. The second is to set up the delay sections with the advanced concept for analysing delays' effects by TIA. This study performed a case study on an actual international mega-project. to confirm the effectiveness of improvement concepts that this practical approach is applicable for the assessment of EoT. In conclusion, this paper supposes to provide practitioner in charge for an EoT claim with an advanced substantiation methodogy when they not only analyse the construction delays by using TIA, but also negotiate with stakeholders about with the assessment of EoT.

Improvement of Technical Proposal Tendering Evaluation Criteria for Small and Medium sized Construction Projects (중·소형 건설공사를 위한 기술제안입찰 평가기준 개선)

  • Yu, Jun-Hyeok;Hyun, Chang-Taek;Moon, Hyun-Seok;Son, Myung-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.95-105
    • /
    • 2012
  • The government introduced the technical proposal drafting system in September 2007, as a new method to stimulate technical competence among construction companies to require ingenuity, creativity, artistic sense, and high-level technology. However, an examination of instances has shown that this system has been applied only to large scale constructions worth 30 billion won or more, and not to small and medium constructions worth less than 30 billion won. This is because the evaluation criteria of the system is structured in a manner that makes it difficult to apply to small and medium constructions. This study presented methods to improve the evaluation factors, categories, and scoring scheme of the technical proposal creation system for medium to small scale constructions to be able to further apply the current system to small and medium constructions. The technical proposal evaluation criteria presented in this study was significant in that it enabled the technical proposal creation system that was mainly used for large scale constructions to be further applied to medium to small scale constructions. And it also contributes to the establishment and settlement of a new technical proposal tendering for medium to small scale constructions.

System reorganization of electrical standard Production Units and effect analysis of electrical construction business (전기부문 표준품셈 체계개편과 전기공사업계의 영향분석)

  • Lim, S.H.;Hwang, M.S.;Shin, K.S.;Kim, J.I.;Sun, A.S.
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.2060-2061
    • /
    • 2007
  • 본 논문에서는 국가 경제성장률과 국내 전기공사실적 증가률에 대한 상관관계를 비교분석하였으며, 연간 전기공사 실적에 대한 항목별 구성비율 중 노무비가 차지하는 비율을 분석하였다. "국가를 당사자로 하는 계약에 관한 법률 시행령 및 시행규칙"과 회계예규인 "예정가격 작성기준"에 근거하여 원가계산에 의한 전기공사 예정가격 산정의 기초자료로 활용되는 전기부문 표준품셈 체계개편이 전기공사업에 미치는 영향을 최근 발주된 대형공사에 체계개편 전과 체계개편 후 공사금액을 비교하여 종합적으로 분석하였다.

  • PDF

Introduction of seven-type channels on large experimental facility (대형 수리모형 실험시설의 7종 실험수로 구축 소개)

  • Yoon, Jae-Seon
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2018.05a
    • /
    • pp.236-236
    • /
    • 2018
  • 한국농어촌공사 농어촌연구원에 구축되고 있는 대형 수리모형 실험시설은 수공구조물에 대한 수리모형실험 수행, 설계기준 제 개정, 호안 검인증제도 지원 등 국가의 정책지원과 개방 공유를 통한 국내 건설기업의 하천분야 신기술 개발 및 국가 경쟁력 확보, 하천 관련 원천기술 확보 등 다양한 목적을 가지고 진행되고 있는 대규모 분산공유형 실험시설에 해당한다. 본 사업의 일환으로 현재 구축 진행되고 있는 7종의 실험수로는 장기하상변동, 토석류, 실규모 호안블록, 감세공 수리특성, 신형어도개발 등 다양한 수리특성에 대한 계측 및 분석이 가능한 대형 실험시설에 해당한다. 7종의 실험수로는 PIV시스템의 연계 계측이 가능한 1) 고정식개수로, 2) PIV실험수로와 1/5의 역경사 재현이 가능한 3) 가변식경사수로, 호안블록 및 사석의 소류력 측정이 가능한 4) 고정식급경사수로, 토석류흐름 측정이 가능한 5) 가변식하도실험수로, 장기하상변동 분석을 위한 6) 대형유사순환수로, 부유사의 침 퇴적 양상 재현을 위한 7) 소형유사순환수로로 구성되어진다. 7종의 실험수로는 '18년 2월에 착공하여 현재 실시설계도서를 검토 중에 있으며, 18년 9월에 준공될 예정이다.

  • PDF