• 제목/요약/키워드: 대량조기방출빈도

검색결과 4건 처리시간 0.04초

국내 WH형원전의 출력증강에 따른 PSA 영향평가 (Assessment on Plant-Specific PSA for Power Uprates of Westing-House Type Nuclear Power Plants in Korea)

  • 이근성;임혁순;이은찬
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2007년도 춘계학술대회B
    • /
    • pp.3464-3466
    • /
    • 2007
  • Power uprate is the process of increasing the maximum power level at which a commercial nuclear power plant may operate. Power uprate applications(113 units) for NPPs(Nuclear Power Plants) were recently approved in the United States. Utilities have been using power uprates since the 1970s as a way of increasing the power output of their nuclear plants. To increase the power output of a reactor, typically more highly enriched uranium fuel and/or more fresh fuel is used. This enables the reactor to produce more thermal energy and therefore more steam, driving a turbine generator to produce electricity. In this paper, the propriety of power uprate is explained through the review on the power uprate method and the changes of the physical parameters due to power uprate. The analysis results showed that the CDF(Core Damage Frequency) and LERF(Large Early Release Frequency) are affected in the current probabilistic safety assessment (PSA) model.

  • PDF

프라마톰형 원전의 배관 가동중검사에 리스크 정보를 활용한 기법 적용 (Application of Risk-Informed Methods to In-Service Piping Inspection in Framatome Type Nuclear Power Plants)

  • 김진회;이정석;윤은섭
    • 비파괴검사학회지
    • /
    • 제34권4호
    • /
    • pp.311-317
    • /
    • 2014
  • 가압경수로형 원자력발전소 소유자 그룹은 ASME Sec. XI 코드의 배관 샘플링검사법 대안으로 리스크 정보를 활용한 가동중검사 프로그램(RI-ISI)을 개발 및 적용하였다. RI-ISI 프로그램은 파손 메커니즘이 있는 고위험도 배관에 검사를 집중함으로써 발전소의 전반적인 안정성을 향상시켰다. 또한, RI-ISI 프로그램은 비파괴검사 물량, 검사자 방사선 피폭, 검사 시간 등을 줄일 수 있다. 배관 RI-ISI 방법은 한국 표준형 원자력 발전소 3개호기에 적용되고 있으며 다른 발전소도 개발중에 있다. 이 논문에서는 프라마톰형(프랑스형) 원전에 대한 RI-ISI 방법을 연구하고 그 결과를 나타내었다. 프라마톰형 원전에 대한 RI-ISI 적용은 발전소 안전성을 향상시키고 유지시키며 계량화할 수 없는 이익을 준다는 결론에 도달하였다.