A Comparative Analysis of the Priority and Evaluation Factors of the Renewable Energy Plan Site by Country (국가별 재생에너지 계획입지제도 절차별 우선순위 및 평가요소 비교 분석)

  • Sung-Hoon, Kim;Hwa-Young, Yoon
    • New & Renewable Energy
    • /
    • v.18 no.4
    • /
    • pp.54-63
    • /
    • 2022
  • This study compared and analyzed major policies and operational processes of countries that introduced the Renewable Energy Plan Site, through literature analysis of published governmet data, and previous research results. The procedures of the Renewable Energy Plan Site were classified into planned location designations, selection of power generation business operators, designation of the business' district and development and evaluating the factors derived for each procedure. Four contries were selected to be compared and analyzed, namely: Denmark, Germany, the United Kingdom and Japan. This was based on the criteria used to introduce and operate the Renewable Energy Plan Site, activate renewable energy supply and check the applicability of Korea's policies. It was analyzed that the priority of the planned location for the procedure was different for each country depending on the conditions there.

Application of Enhanced Geothermal Systems for Jeju geothermal power plant (EGS 지열발전시스템을 적용한 제주 지열발전소)

  • Lee, Sang-Don
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2009.06a
    • /
    • pp.573-573
    • /
    • 2009
  • 지열에너지는 지구가 생성될 당시부터 지구 내부에 존재하는 무한한 열에너지로 온실가스 배출이 적으며 태양광이나 풍력 등 다른 신재생 에너지와는 달리 일정한 에너지를 공급할 수 있는 항상성 에너지로 기저부하를 담당할 수 있다. 지열을 이용한 전력 생산은 1904년에 이탈리아 라데렐로에서 처음으로 시작되었으며, 현재까지 화산지대를 중심으로 활발히 이루어지고 있다. 2001년에서 2005년 사이에 전세계 지열발전용량은 약 13% 증가하였으며, 2005년을 기준으로 약 8,933MWe의 지열발전설비가 가동 중이다. 최근 들어 지하 심부까지 시추하여 지열저장소(geothermal reservoir)를 형성하고 이를 통해 지열에너지를 생산하는 새로운 시스템인 EGS(Enhanced Geothermal Systems)가 개발됨에 따라 비화산지대에서도 지열발전소를 건설하려는 움직임이 가속화되고 있다. EGS는 지하 심부의 불투수성 결정질 암반에 존재하는 지열에너지의 경제적인 생산뿐만 아니라 물을 주입하여 생산시키는 순환 방식을 이용하여 지열에너지 획득의 매개 역할을 하는 지열수의 고갈 문제를 해결하였다. 결정질 암반에서의 지열저장소의 형성은 암반 내에 분포하는 불연속면에서 주로 발생하며, 이를 위한 압력 조건은 현지 암반의 응력 분포 특성과 암반 및 불연속면의 물성에 좌우된다. 시추공을 통해 지하 심부의 암반에 수압이 가해지면 물의 주입으로 불연속면의 마찰력이 감소하며, 이로 인해 불연속면에 전단변형이 발생하게 된다. 전단변형은 불연속면을 열린 상태로 유지시켜 지열저장소를 형성하게 된다. 불연속면의 전단 변형시 발생하는 미소 탄성파는 시추공 주변에 설치한 모니터링 장비에서 측정되며, 모니터링 장비에 의해 측정된 미소 탄성파 발생 지점의 클러스터는 지열저장소의 공간적 분포 및 규모를 추정할 수 있는 자료가 된다. 현재 EGS를 이용한 지열발전 프로젝트는 프랑스 슐츠, 스위스 바젤, 호주 하바네로에서 대표적으로 진행 중이다. 슐츠는 현재 1.5MWe의 파일럿 플랜트를 가동 중이며, 하바네로는 파일럿 플랜트 건설 단계를 진행중이다. 스위스 바젤은 지열저장소를 형성시킬 목적으로 수행된 주입시험에서 발생된 문제에 대한 기술의 신뢰성을 확보할 목적으로 잠시 중단된 상태다. 제주도는 신생대에 분출하여 형성된 대표적인 한국의 화산지형으로 지열부존 가능성이 높을 것으로 예상되는 지역이다. 따라서 폐사는 지열에너지 부존 특성을 파악하기 위한 심부 물리 탐사 및 탐사정 시추가 실시될 예정이며 궁극적으로 국내 최초의 상용화된 지열발전소 건설을 목표로 하고 있다.

  • PDF

Current Status of Water Electrolysis Technology and Large-scale Demonstration Projects in Korea and Overseas (국내외 수전해 기술 및 대규모 실증 프로젝트 진행 현황)

  • JONGMIN BAEK;SU HYUN KIM
    • Journal of Hydrogen and New Energy
    • /
    • v.35 no.1
    • /
    • pp.14-26
    • /
    • 2024
  • Global efforts continue with the goal of transition to a "carbon neutral (net zero)" society with zero carbon emissions by 2050. For this purpose, the technology of water electrolysis is being developed, which can store electricity generated from renewable energies in large quantities and over a long period of time as hydrogen. Recently, various research and large-scale projects on 'green hydrogen', which has no carbon emissions, are being conducted. In this paper, a comparison of water electrolysis technologies was carried out and, based on data provided by the International Energy Agency (IEA), large-scale water electrolysis demonstration projects were analyzed by classifying them by technology, power supply, country and end user. It is expected that through the analysis of large-scale water electrolysis demonstration projects, research directions and road maps can be provided for the development/implementation of commercial projects in the future.

$CO_2$ Removal Process Analysis and Modeling for 300MW IGCC Power Plant (300MW급 IGCC Power Plant용 $CO_2$ 제거공정 분석 및 모델링)

  • Jeon, Jinhee;Yoo, Jeongseok;Paek, Minsu
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2010.11a
    • /
    • pp.130.2-130.2
    • /
    • 2010
  • 2020년까지 대형 CCS (Carbon Capture and Storage) Demo Plant 시장 (100MW 이상) 이 형성될 전망이다. 발전 부문에서 대규모 CCS 실증 프로젝트는 총 44개이며 연소전(41%), 연소후(28%), 순산소(3%) 프로젝트가 계획되어 있다. 순산소 연소 기술은 실증진입단계, 연소후(USC) 기술은 상용화 추진단계, 연소전 (IGCC) 기술은 실증완료 이후 상용화 진입 단계이다. IGCC 발전의 석탄가스화 기술은 타 산업분야에 서 상용화 되어있어 기술신뢰성이 높다. IGCC 단위설비 기술 개발을 통한 성능개선 및 비용절감에 대한 잠재력을 가지고 있기 때문에 미래의 석탄발전기술로 고려되고 있다. IGCC 기술은 가장 상용화에 앞서있지만 아직까지 IGCC+CCS 대형 설비가 운전된 사례가 전 세계적으로 없으며 미국 EPRI 등에서 Feasibility Study 단계이다. 현재 국책과제로 수행중인 300MW급 태안 IGCC 플랜트를 대상으로 향후 CCS 설비를 적용했을 경우에 대해 기술 타당성 검증을 목적으로 IGCC+CCS 모델링을 수행하였다. 모델링은 스크러버 후단의 합성 가스를 대상으로 하였다. Water Gas Shift Reaction (WGSR) 공정 및 Selexol 공정을 구성하여 최종 단에서 수소 연료를 생산할 수 있도록 하였다. WGSR 공정은 Co/Mo 촉매반응기로 구성되었다. WGSR 모델링을 통하여 주입되는 스팀량 (1~2 mol-steam/mol-CO) 및 온도 변화 ($220-550^{\circ}C$)에 따른 CO가스의 전환율을 분석하여 경제적인 설계조건을 선정하였다. Selexol 공정은 $H_2S$ Absorber, $H_2S$ Stripper, $CO_2$ Absorber, $CO_2$ Flash Drum으로 구성된다. Selexol 공정의 $CO_2$$H_2S$ 선택도를 분석 하였으며 단위 설비별 설계 조건을 예측하였다. 모델링 결과 59kg/s의 합성가스($137^{\circ}C$, 41bar, 가스 조성은 $CO_2$ 1.2%, CO 57.2%, $H_2$ 23.2%, $H_2S$ 0.02%)가 WGSR Process를 통해 98% CO가 $CO_2$ 로 전환되었다. Selexol 공정을 통해 $H_2S$ 제거율은 99.9%, $CO_2$제거율은 96.4%이었고 14.9kg/s의 $H_2$(86.9%) 연료를 얻었다. 모델링 결과는 신뢰성 검증을 통해 IGCC+CCS 전체 플랜트의 성능예측과 Feasibility Study를 위한 자료로 활용될 예정이다.