• Title/Summary/Keyword: 단가수립체계

Search Result 7, Processing Time 0.026 seconds

A Pilot Study on Development of Market-Driven Construction Cost-Reference (민간 중심 BOTTOM-UP 방식 건설공사 단가 수립 체계 개발을 위한 기초 연구)

  • Kim, Kyeong-Baek;Lee, Ga-Yeoun;Kim, Sang-Bum
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.41 no.2
    • /
    • pp.151-159
    • /
    • 2021
  • Cost information in the Korean construction industry is mainly controlled by the government agencies. However, there have been wild-spread speculations among participants on the adequacy of these unit prices and difference with the actual market condition. Korean public-led unit prices are developed using mainly a top-down approach by a few designated public institutions. Due to the rapid fluctuations in market prices and high-volume of information, it is impossible for a few public institutions to properly consider market conditions. However, there are almost none private cost reference while many are available in other countries to supplement the public cost references. Needs for private cost references have recognized, and this study can be seen as a pilot study to support them. This study attempts to identify the problem areas of Korean cost references and to provide guidance by benchmarking other countries. This study has confirmed the need of developing market-driven cost references by employing a bottom-up approach in which a large number of various construction participants are fostered to provide their own cost information and share with others. It is envisioned that this study provides foundations for further study on the development on-line construction market platform based on abundant and appropriate cost information.

Configuration Management System for Multi-Component Development (다품종부품 개발을 위한 형상관리 체계)

  • Kim, Sung-Chan;Oh, Hae-Soon;Lee, Sang-Wook
    • Proceedings of the KAIS Fall Conference
    • /
    • 2011.12b
    • /
    • pp.499-502
    • /
    • 2011
  • 중형급 회전익 항공기는 약 5,000여종의 주요기능 부품이 사용된다. 이들 주요 기능부품은 항공기에 장착되기 위해 최적화설계로 목표중량을 달성하고, 요구성능을 상회하여야 한다. 따라서 항공기 기능부품은 개발비를 제외하고도, 동종의 자동차 부품에 비해 약 100배 이상의 양산 단가 구조과 막대한 개발비가 소요된다. 이와 같은 구성품 개발에 있어 개발비를 절감하는 기술관리 수단중 하나가 형상관리이며, 형상관리 체계의 수립은 사업의 성패에 중요요인으로 작용하고, 군사규격에 의거 항공분야 개발사업의 형상관리체계 수립이 요구된다. 본 연구에서는 다양한 민군겸용 구성품 국산화 개발에 적합한 형상관리 체계를 제안하고, 제안된 형상관리 체제를 구축 운용하여, 성공적인 민군겸용 구성품 형상관리가 수행되었음을 확인하였다.

  • PDF

Development on Repair and Reinforcement Cost Model for Bridge Life-Cycle Maintenance Cost Analysis (교량 유지관리비용 분석을 위한 대표 보수보강 비용모델 개발)

  • Sun, Jong-Wan;Lee, Dong-Yeol;Park, Kyung-Hoon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.11
    • /
    • pp.128-134
    • /
    • 2016
  • Estimating the repair and reinforcement (R&R) costs for each bridge member is essential for managing the life cycle of a bridge using a bridge management system (BMS). Representative members of a bridge were defined in this study, and detailed and representative R&R methods for each one were drawn in order to develop a systematic maintenance cost model that is applicable to the BMS. The unit cost for each detailed R&R method was established using the standard of estimate and historical cost data, and a systematic procedure is presented using an integration program to enable easy renewal of the R&R unit cost. Also, the average unit cost of the representative R&R methods was calculated in the form of a weighted average by considering the unit cost and application frequency of each detained R&R method. The appropriateness of the drawn average unit cost was reviewed by comparing and verifying it with the previous historical unit cost. The suggested average R&R unit cost can be used to review the validity of the required budget or the appropriateness of the R&R performance cost in the stage to establish the bridge maintenance plan. The results of this study are expected to improve the reliability of maintenance cost information and the rationality of decision making.

Evaluation of Shanghai New Port Development Plan (중국 상해 신항만 개발계획 평가)

  • Nam, Ki-Chan;Song, Yong-Seok;Yeon, Jeong-Hum
    • Journal of Korean Society of Transportation
    • /
    • v.21 no.6
    • /
    • pp.7-15
    • /
    • 2003
  • China is expected to experience rapid increase in container traffic due to the joining to WTO and the fast economic growth. However, logistics-related infrastructure such as sea port is very poor and the capacity is lagging far behind the demand, resulting in transferring around 70% of import and export cargo volume at ports in adjoining countries such as Korea, Taiwan, Hong Kong and Japan. Recently, China announced a huge project of developing an offshore port consisting of 52 berths, 30km away from Shanghai with a connecting bridge. As such plan seems to have a significant impact on the port of Pusan which tries to be a Hub port in Far East Asia, we need to scrutinize the plan. This paper, therefore, tries to examine Shanghai New Port Plan, to evaluate the feasibility and potential competitiveness, and to analyze the impact on Pusan port. For this, we review the situation of major container ports in China and the flow pattern of container traffic to and from Pusan port. We then examine the feasibility of the proposed offshore port with respect to demand and supply for container terminal, weather condition, hinterland connection and resource of investment.

Cost Prediction Models in the Early Stage of the Roadway Planning and Designbased on Limited Available Information (가용정보를 활용한 기획 및 설계초기 단계의 도로 공사비 예측모델)

  • Kwak, Soo-Nam;Kim, Du-Yon;Kim, Byoung-Il;Choi, Seok-Jin;Han, Seung-Heon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.87-100
    • /
    • 2009
  • The quality of early cost estimates is critical to the feasibility analysis and budget allocation decisions for public capital projects. Various researches have been attempted to develop cost prediction models in the early stage of a construction project. However, existing studies are limited on its applicability to actual projects because they focus primarily on a specific phase as well as utilize restricted information while the amount of information collectable differs from one another along with the project stages. This research aims to develop two-staged cost estimation model for the schematic planning and preliminary design process of a construction projects, considering the available information of each phase. In the schematic planning stage where outlined information of a project is only available, the Case-Based Reasoning model is used for easy and rapid elicitation of a project cost based on the extensive database of more than 90 actual highway construction projects. Then, the representing quantity-based model is proposed for the preliminary design stage where more information on the quantities and unit costs are collectable based on the alternative routes and cross-sections of a highway project. Real case studies are used to demonstrate and validate the benefits of the proposed approach. Through the two-stage cost estimation system, users are able to hold a timely prospect to presume the final cost within the budge such that feasibility study as well as budget allocation decisions are made on effectively and competitively.

A Study on the Efficiency of Internet Keyword Advertisement According to CPM and CPC Methods by Analyzing Transactional Data (키워드 검색 광고 운영 DB 데이터 분석을 통한 CPM와 CPC방식의 광고효과 연구)

  • Kim, Do-Yeon;Lim, Gyoo-Gun;Lee, Dae-Chul
    • The Journal of Society for e-Business Studies
    • /
    • v.16 no.4
    • /
    • pp.139-154
    • /
    • 2011
  • Recently Internet keyword search service providers tends to use CPC advertizement method rather than CPM method. However researches how much the CPC method is beneficial to advertisers than CPM method in certain perspectives are insufficient and not performed systematically. So this paper tries to do comparative analysis about the two methods by analyzing the real transactional DB data from an advertizement agency. Due to the difficulties of direct comparison between the two methods because of their different expose positions on the Web and different types of attributes in DB, we did some preprocessing step for the transactional data. From the result of analysis, the click rate of CPC is higher than CPM by 1.3% and the unit cost for the CPC per one click is lower than CPM method by 51 Won. It shows the CPC method is more effective than CPM method for advertizement from the point of advertizement effectiveness (CTR) and advertizement cost (CPC). We hope this research would give useful information to advertisers and marketing managers in making advertizement strategy, marketing decision and budgeting.

A Study on the Design of the Grid-Cell Assessment System for the Optimal Location of Offshore Wind Farms (해상풍력발전단지의 최적 위치 선정을 위한 Grid-cell 평가 시스템 개념 설계)

  • Lee, Bo-Kyeong;Cho, Ik-Soon;Kim, Dae-Hae
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.24 no.7
    • /
    • pp.848-857
    • /
    • 2018
  • Recently, around the world, active development of new renewable energy sources including solar power, waves, and fuel cells, etc. has taken place. Particularly, floating offshore wind farms have been developed for saving costs through large scale production, using high-quality wind power and minimizing noise damage in the ocean area. The development of floating wind farms requires an evaluation of the Maritime Safety Audit Scheme under the Maritime Safety Act in Korea. Floating wind farms shall be assessed by applying the line and area concept for systematic development, management and utilization of specified sea water. The development of appropriate evaluation methods and standards is also required. In this study, proper standards for marine traffic surveys and assessments were established and a systemic treatment was studied for assessing marine spatial area. First, a marine traffic data collector using AIS or radar was designed to conduct marine traffic surveys. In addition, assessment methods were proposed such as historical tracks, traffic density and marine traffic pattern analysis applying the line and area concept. Marine traffic density can be evaluated by spatial and temporal means, with an adjusted grid-cell scale. Marine traffic pattern analysis was proposed for assessing ship movement patterns for transit or work in sea areas. Finally, conceptual design of a Marine Traffic and Safety Assessment Solution (MaTSAS) was competed that can be analyzed automatically to collect and assess the marine traffic data. It could be possible to minimize inaccurate estimation due to human errors such as data omission or misprints through automated and systematic collection, analysis and retrieval of marine traffic data. This study could provides reliable assessment results, reflecting the line and area concept, according to sea area usage.