• Title/Summary/Keyword: 다기준

Search Result 320, Processing Time 0.023 seconds

Nitrate Risk Management by Multiobjective Decision-making Technique Using Fuzzy Sets (퍼지이론을 사용한 다기준의사결정기법에 의한 질산의 위해성 관리)

  • Lee, Yong-Woon
    • Journal of Environmental Impact Assessment
    • /
    • v.5 no.1
    • /
    • pp.47-60
    • /
    • 1996
  • Nitrate contamination problems from groundwater supplies have been reported throughout many countries in the world, including Korea. Nitrate salts can induce methemoglobinemia and possibly human gastric cancer. To reduce human health risk from nitrate in groundwater supplies, several nitrate risk-management strategies can be developed based on the acceptable level of human health risk, the reasonableness of nitrate-control cost, and the technical feasibility of nitrate-control methods. However, due to a lack of available information, assessing risk, cost and technical feasibility contains elements of uncertainty. In the present paper, a nitrate risk-management methodology using fuzzy sets in combination with a multiobjective decision-making (MODM) technique is developed to assist decision makers in evaluating, with uncertain information, various nitrate risk-management strategies in order to decide a proper strategy.

  • PDF

Application of Multi Criiteria Decision Making for Vulnerability Analysis of Nakdong River Basin (낙동강 유역의 취약도 분석을 위한 다기준의사결정법의 적용)

  • Kim, Tae-Hyung;Kwak, Yung-Min;Park, Se-Jin;Han, Ku- Yeun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2011.05a
    • /
    • pp.453-453
    • /
    • 2011
  • 21세기에 들어 홍수의 규모가 대형화 되었고, 그 발생빈도 및 강도도 증가하고 있다. 최근에는 지구온난화가 지속화되면서 전 세계적으로 높은 강도의 기상이변들이 속출하고 있고, 이러한 이상기후에 따른 태풍, 집중호우 등의 대규모 호우로 인해 댐 및 제방 등의 수공구조물 붕괴와 같은 비상상황이 초래 될 수 있다. 이와 같은 피해들을 통해 홍수 침수 범위의 예측, 분석을 통한 홍수위험 및 다양한 홍수위험지도 작성의 필요성이 대두되었고, 실제로 국가 차원의 홍수위 험지도가 제작되고 있다. 특히, 홍수 위험도 분석에 있어서 홍수에 노출된 지역의 인구수, 홍수에 노출된 지역에서의 경제적 활동의 형태, 홍수가 발생했을 때 2차적 피해를 불러올 수 있는 설비 등을 나타내는 홍수 취약도(Flood Vulnerability)에 대한 정량적 평가는 홍수위험지표 및 홍수위험강도 등에 의한 Flood Risk 개념을 기반으로 한 홍수위험지도 제작을 위해 매우 중요한 사항이라 할 수 있다. 그러나 현재까지의 홍수취약도 산정방법은 방법론적인 면에 있어 다소 단순하고, 직관에 의한 위험도의 분류가 이루어지고 있는 실정이다. 또한 취약도 지표의 산정과정이 전문가의 의견에 의존하는 경우가 많아 홍수 취약도 선정과정과 가중치 결정과정에 전문가들의 주관이 개입되는 등 홍수위험지표의 정량화에 어려움을 겪는 경우가 많다. 본 연구에서는 위와 같은 문제를 극복하기 위해 Flood Risk Mapping 기술의 적용에 있어 중요한 요소인 홍수취약도를 다기준의사결정법에 의해 산정하고, 국내 낙동강 유역에 대해 행정구역별로 세분화된 홍수위험지도 제작을 위한 취약도 지표를 산정하고자 하였다. 이를 위해 다기준의사결정법중의 하나 인 PROMEETEE와 ELECTRE를 이용하여 민감도, 노출도, 저감성 지표를 낙동강 유역에 대해 정량화하여 도시하였다. 본 연구결과를 통해 홍수위험지표 및 지수들의 결합에 대한새로운 방법론을 제시하고, 그에 따른 지도화 기법을 확립할 수 있을 것으로 기대된다.

  • PDF

A Spatial Multicriteria Analysis Approach to Urban Quality of Life Assessment (공간적 다기준평가 기법을 이용한 도시의 삶의 질 분석)

  • Jun, Byong-Woon
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.11 no.4
    • /
    • pp.122-138
    • /
    • 2008
  • A pixel-based approach to urban quality of life assessment can be regarded as a spatial decision problem under the condition of complexity because it searches the urban space for evidence of hot spots of quality of life based on multiple and differentially weighted evaluation criteria. Such an assessment involves inappropriate scaling of several incommensurate criteria, much unstructured subjectivity in the decision maker's judgment, and the large data handling in a raster GIS environment. There is a need for identifying alternative approaches to tackle the ill-structured problem in urban quality of life assessment. In this context, this research proposes and implements a spatial multicriteria analysis approach to evaluate urban quality of life in a raster GIS environment. The implementation of this methodology is illustrated with a case study of the Atlanta metropolitan area. Results indicate that the proposed methodology may provide an alternative approach for evaluating the quality of life in an urban environment.

  • PDF

Analysis of Waterfront Utilization Index Using Multi Criteria Decision Making (다기준의사결정을 이용한 친수공간 이용지수 분석)

  • Kim, Byeong-Chan;Kim, Man-Sik;Maeng, Bong-Jae
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2011.05a
    • /
    • pp.195-195
    • /
    • 2011
  • 국가하천의 주변지역을 체계적이고 계획적으로 조성 이용하여 난개발을 방지하고 지속가능한 발전을 도모하며, 그에 따른 이익을 하천의 정비 및 관리 등에 활용함으로써 공공복리의 증진에 기여함을 목적으로 하는 친수구역활용에 관한 특별법이 곧 시행될 예정이다. 친수는 단순히 하천 보전과 상대되는 수변이용의 측면이 아니라 하천의 경관, 생태계, 물 등 전체적인 하천공간에서 이루어지는 인간의 활동과 심리적 만족감으로 해석할 수 있다. 이러한 친수활동 유형을 정립하기 위하여 전문가 및 실무자들의 도움으로 설문지를 작성하고, 조사하였다. 또한 평가 항목간의 중요도를 합리적으로 부여하고자 전문가 집단 활용을 통한 다기준의사결정 기법 중 계층분석과정 AHP(Analytic Hierarchy Process)와 이의 일반적인 형태인 ANP(Analytic Network Process) 기법을 이용하여 비교 분석하여 보았다. AHP는 의사결정의 목표 또는 평가기준이 다수이며 복합적인 경우, 다수의 속성들을 계층적으로 분류하여 각 속성의 중요도를 파악함으로써 최적 대안을 선정하는 기법으로 다수의 목표, 다수의 평가기준, 다수의 의사결정주체가 포함되어 있는 의사결정 문제를 계층화하여 해결한다. 그러나 의사결정 문제는 대부분 요소들 간의 수평적 상호작용과 수직종속성이 존재하기 때문에 단순히 계층적 구조만으로는 설명할 수 없는 경우가 있다. ANP는 AHP 분석을 확장한 개념으로 평가 요소가 계층구조를 가지고 있으면서 각 평가 요소간 네트워크 구조를 가지는 경우에 해당한다. 즉, 시스템 분석, 통합 및 조정을 위한 방법으로 요소들 간의 비선형 관계를 모델화하는 복잡한 의사결정에 적용이 가능하다. ANP는 AHP의 기본 공리인 독립성이 유지되지 않을 때도 적용할 수 있는 의사결정 방법이기 때문이다. AHP와 ANP 분석을 위해 평가기준은 하천특성, 생태환경특성, 인문환경특성, 경관, 유지관리 등으로 분류하였으며, 세부평가항목은 하천의 물리 생태학적 특성, 개발여건과 관련된 특성, 경관의 이용가치, 유지관리 용이성 등 20여 개로 나누었다. AHP와 ANP를 이용하여 친수공간 이용지수 가중치를 산정한 결과, 두 기법은 큰 차이를 보이지 않았다. 그러나 ANP를 이용하여 가중치를 결정하는 방법은 최종 결정의 공정성이나 신뢰성을 확보하는데 기여를 하는 것으로 나타났다.

  • PDF

A Evaluation Model of AHP Results Using Monte Carlo Simulation (Depending on the Case Studies of Road and Rail) (몬테카를로 시뮬레이션을 통한 AHP결과 해석모형개발 (도로 및 철도부문 사례를 중심으로))

  • Sul, You-Jin;Chung, Sung-Bong;Song, Ki-Han;Chon, Kyung-Soo;Rhee, Sung-Mo
    • Journal of Korean Society of Transportation
    • /
    • v.26 no.4
    • /
    • pp.195-204
    • /
    • 2008
  • Multi-Criteria Analysis is one method for optimizing decisions that include numerous characteristics and objective functions. The Analytic Hierarchy Process (AHP) is used as a general Multi-Criteria Analysis considering many critical issues. However, since validation procedures for the decision reliability of AHP valuers had been left off existing methodologies, a new methodology including such validation procedures is required to make more reliable decisions. In this research, idea decision results are derived using Monte Carlo Simulation in cases where AHP valuers do not have expertise in the specific project, and these results are compared with the results derived from experts to develop a new analysis model to make more reliable decisions. Finally, this new analysis is applied to various field case studies of road and rail carried out by the Korea Development Institute (KDI) between 2003 and 2006 to validate the new analysis model. The study found that approximately 20% of decisions resulting from the existing methodology are considered prudent. In future studies, the authors suggest analyzing the correlation between initial weights and final results since final results are enormously influenced by the initial weight.

The Risk Evaluation on Water Supply Networks using PROMETHEE (PROMETHEE를 이용한 상수도관망시스템의 위험도 평가)

  • Hong Sungjun;Kim Sheung-Kown;Kim Jooghun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2005.05b
    • /
    • pp.1307-1311
    • /
    • 2005
  • 최근들어 Water Security에 대한 관심이 고조되고 있지만 국내의 경우 이에 대한 체계적인 연구가 아직 진행되지 않았고 상수도관망시스템의 오염예방 및 위험관리에 대한 연구는 매우 미비한 실정이며 특히 상수도관망시스템의 위험성 및 취약성에 대한 연구는 전무한 상태이다. 이러한 상수도관망시스템의 위험도와 관련된 여러 위험요소들은 인명의 피해, 재산상의 피해, 환경적 피해, 시스템의 피해 그리고 사회적 불안등 여러 기준을 고려하여 평가되어야 한다. 이 문제는 다기준의사결정(multi-criteria decision making)문제로서 평가기준들(criteria) 간의 상충관계(trade-off)로 인하여 판단이 모호한 대안들을 PROMETHEE(Preference Ranking Organization METHod Enrichment Evaluations) 기법을 이용하여 평가하였다. PROMETHEE는 선호의 유출량(leaving flow)과 유입량(entering flow)의 개념을 이용하여 여러 대안들의 순위선호(outranking)를 산정하는 기법으로, 의사결정자(decision matter)가 비교적 쉽게 이해할 수 있으며 기존의 AHP$\cdot$ANP와는 달리 명확한 판단이 어려운 대안들에 대해서는 비교불가능한(incomparable) 대안으로 분류한다. 이와 같은 위험도 평가결과는 위기상황에 대한 대처방안을 제시할 의사결정시스템 구축의 기초 자료가 될 수 있을 것이다.

  • PDF

Study on the Thermal Radiation Performance of the Multi-functional Structure Made of the Carbon Fiber Composite Material (탄소섬유 복합재를 이용한 위성용 다기능 구조체의 방열성능 분석)

  • Kim, Taig-Young;Hyun, Bum-Seok;Seo, Young-Bae;Jang, Tae-Seong;Seo, Hyun-Suk;Lee, Jang-Joon;Kim, Won-Seock;Rhee, Ju-Hun
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.40 no.2
    • /
    • pp.157-164
    • /
    • 2012
  • The design strategy of the multi-functional structure is that the electrical components and the circuits are directly put on their supporting structural panel in which the radiation shields and the thermal control functions are integrated. Applying the multi-functional structure reduces the total mass and size of the space system and makes it possible to lower launch cost. In present study the performance of thermal radiation for six types of multi-functional structure are investigated by the numerical method. The effect of the rib configuration on heat transfer for the multi-functional-structure is not important alone but is meaningful considering with the structural stiffness, difficulty of manufacturing and mass increase. In heat spreading point of view, the thickness of the outer conductive layer is important rather than the rib configuration and the trade-off study with the mass and thickness is required for optimum design.

Evaluation of Supply Alternatives of Water Shortage based on Multi-criteria Decision Analysis (다기준의사결정을 통한 물부족 해소방안 제시)

  • Choi, Si-Jung;Kim, Joong-Hoon;Lee, Dong-Ryul
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2008.05a
    • /
    • pp.1510-1514
    • /
    • 2008
  • 많은 지역이 수자원 관리와 계획에 있어 많은 문제점을 가지고 있으며 우리나라의 경우 장래에 물 부족이 전망되고, 하천 수질과 생태환경의 개선은 국민이 바라는 만큼 기대 수준에 미치고 있지 못하고 있어 우리 삶의 질을 저해하고 있다. 따라서 수자원 계획이나 개발에 있어서 기존의 공급 차원만을 고려하기보다는 수질과 생태환경, 수요적 측면을 함께 고려하는 통합적인 접근 방법들이 시도되고 있다. 점점 증가하는 물수요 때문에 장래에 물 부족이 발생할 것으로 예상되며 이를 해소시킬 수 있는 대안들이 제시되어야 할 것으로 판단된다. 하지만 미래에 발생할 수 있는 다양한 상황들을 예측하고 분석하기는 쉽지 않으며, 물 부족을 해소시킬 수 있는 다양한 대안 중에 최적대안을 찾는 것 또한 쉬운 일이 아니다. 본 연구에서는 한국건설기술연구원과 SEI-US(Stockholm Environment Institute-US Center)가 공동으로 개발한 통합수자원평가계획모형인 K-WEAPq(Korea-Water Evaluation And Planning System Linked QUAL2K) 모형을 이용하여 미래에 발생할 수 있는 다양한 물 수급 전망을 분석하였으며, 물 부족을 해소시킬 수 있는 여러 대안에 따른 물 수급 변화를 분석하였다. 또한 수자원 계획 및 개발 분야에서 여러 상반된 기준들에 대해 최적의 대안들을 찾고 이를 결정하기 위해 다기준의사결정 분석(MCDA: Multicriteria Decision Analysis)을 이용하였다. 낙동강 권역에 대해 2011년 물 수급 전망을 분석한 후 물 부족이 예상되는 지역에 대한 물 부족 해소 정책으로 7가지 대안을 제시하였으며, 사회 경제 환경적 기준에 대해 각각의 대안을 분석하여 최적의 대안을 제시하였다.

  • PDF

An Evaluation of the Weights and Investigation of the Impact Factors for Supplying LNG (천연가스 공급타당성 검토를 위한 영향요인 발굴 및 중요도 평가)

  • Hong, Sung-Jun;Choi, Bong-Ha;Lee, Deok-Ki;Lee, Jeong-Tae;Park, Soo-Uk
    • Transactions of the Korean hydrogen and new energy society
    • /
    • v.20 no.1
    • /
    • pp.79-85
    • /
    • 2009
  • In this paper, we investigated impact factors by brainstorming and survey research and calculated the weights of them using the Analytic Hierarchy Process(AHP) method in order to evaluate alternatives for supplying Liquefied Natural Gas(LNG). AHP is a useful method for evaluating multi-criteria decision making problems. We selected 3 criteria and 9 sub-criteria. According to the result in this study, the most important sub-criterion is the Government's Policy, and the second is the Province's Policy. The other side, the lowest important sub-criterion is the Investment Cost. This study may provide basic data to select the optimal alternative for supplying LNG.

Determination of Forest Road Construction Priority Order Using Multiple Criteria Decision Making Methods (다기준의사결정법(多基準意思決定法)에 의한 임도개설순위(林道開設順位)의 결정(決定))

  • Cha, Du Song;Cho, Koo Hyun;Kim, Jong Yoon
    • Journal of Korean Society of Forest Science
    • /
    • v.85 no.2
    • /
    • pp.149-157
    • /
    • 1996
  • The applications of multiple criteria decision making(MCDM) methods were investigated to determine the priority order in forest road construction for timber harvesting and silvicultrual activities in 22 regions. In this paper, MCDM methods have five methods from two kinds of models. The one is non-compensatory preference model including maximin and maximax method; the other is compensatory preference model including simple additive weighting method(SAW), hierarchical additive weighting method(HAW) and technique for order preference by similarity to ideal solution(TOPSIS), SAW and TOPSIS methods turned out to be the most adequate for forest road construction priority order among the five methods tested in this study.

  • PDF