There are 17,000 reservoir dams in Korea, of which more than 85% were built over 50 years ago. Old embankment dams are weakened by internal erosion and suffusion phenomena due to preferential leakage paths and this ongoing weakening can cause their failure. Therefore, early warning associated with leakage in an embankment dam is crucial to prevent its failure. An electrical resistivity survey is a non-destructive, real-time and in-situ technique for detecting the development of leakage zones and general conditions of embankment dams. Because of its advantages, the electrical resistivity survey is widely used for reservoir safety inspections. However, the electrical resistivity survey is still not officially included in the precise safety inspection of reservoir dams because it cannot present a quantitative index of dam safety. In this study, we propose a method for calculating the leak index according to the water content evaluated from the electrical resistivity survey and/or induced polarization survey. Particularly, by proposing a quantitative leak index calculation method from monitoring surveys and independent surveys, we provide a theoretical basis for including electrical resistivity and induced polarization surveys as components of the precise safety inspection of reservoirs dams.
Resistivity method is a practical and effective geophysical technique to detect leakage zones in embankment dams. Generally, resistivity survey conducted along the crest assumes that the embankment dam has a 2D structure. However, the 3D topography of the embankment distorts significantly resistivity data measured on anywhere of the dam. This study evaluates the influence from 3D effects created by specific dam geometry and effects of water level fluctuations through the 3D finite element modeling technique. Also, a comparison between different locations of survey line are carried out, and topographic correction technique is developed for the resistivity data obtained along the embankment dam. Furthermore, using synthetic resistivity data for an embankment dam model with leakage zone, detectability of leakage zones is estimated through 2.5D inversion.
KSCE Journal of Civil and Environmental Engineering Research
/
v.37
no.5
/
pp.787-799
/
2017
Although the long-term leakage between the box culvert and the soil contact surface is one of the main causes of the failure in the embankment of the reservoir, there is a little studies on this matter. If a leakage occurs by the structure such as the buried box culvert of reservoir embankment is partially damaged, it is difficult to observe and there is a possibility of damage caused by piping. For these reasons, more research is necessary. In this study, the embankment type of the reservoir is divided into the core type and the homogeneous type when the damaged box culvert passing through the embankment of the reservoir is leaked due to the differential behavior of materials like differential settlement. In view of the condition, the seepage analysis of 2D was performed according to the water level change. The result of the study shows that the possibility of piping increases at the upper part rather than the bottom part of the box culvert when the leakage occurs to the box culvert passing through the embankment of the reservoir. Particularly, it is considered that the presence of the core helps to maintain the seepage stability of the embankment in case where the leakage occurs at the downstream side of the embankment. Also, if there is a drastic decrease on the internal pore water pressure in the embankment of reservoir, it is necessary to consider the possibility of piping.
More than 16 percent of the total 18,032 reservoirs over the country were reported to have leakage problems and need to be improved. Recently, a great deal of progress was made in geophysical survey techniques, particularly in electrical resistivity, and the techniques are used for variety of Purposes in groundwater and dam management due to its economical advantages. This document describes the re-evaluation of existing resistivity data including newly surveyed data, mapping of modeled value in 2-D analysis to locate seepage pathways, This contains also discussion results of more than eighteen years of professional experiences in the field of dam efficiency improvement. In comparison of surface resistivity data with several soil analysis data in laboratory, it is evident that the surface resistivity value shows a qualitative proportionality with the sand contents of the filling materials in earth dam. The result from the study also indicates that the SP method in subsurface investigation is effective to detect seepage in earth filled dam as well as piping through rock/earthfill dike.
Comprehensive field surveys, including various hydrogeological and geophysical methods, were carried out to appraise the applicability of those methods to a leakage problem at the Sandong earth fill dam in southwestern Korea. The methods applied in the fold site were tracer tests, monitoring of drawdown and leakage with discharge of reservoir water, electrical resistivity surveys using the dipole-dipole array, self-potential (SP), and temperature logging methods. The leakage pattern in the reservoir wall was demonstrated by hydrogeological methods and was further clarified by the geophysical surveys. Leakage turned out to be through the right abutment of the reservoir wall. In this study, we conformed that the electrical resistivity method is effective in detecting the zones favorable to leakage, and SP methods are useful for delineating the leakage pathways themselves, because leaks generate strong streaming-potential anomalies.
Resistivity method is a practical and effective geophysical technique to detect leakage zones in embankment dams. Generally, resistivity survey conducted along the crest assumes that the embankment dam has a 2D structure. However, the 3D topography of embankments distorts significantly resistivity data measured on anywhere of the dam. In this study, we analyse the influence from 3D effects created by specific dam geometry through the 3D finite element modeling technique. We compared 3D effects when resistivity surveys are carried out on the upstream slope, left edge of the crest, center of the crest, right edge of the crest and downstream slope. We ensure that 3D effect is greatly different according to the location of the survey line and data obtained on the downstream slope are most greatly influenced by 3D dam geometry. Also, resistivity data are more influenced by the electrical resistivity of materials constituting reservoir than 3D effects due to specific dam geometry. Furthermore, using resistivity data synthesized with 3D modeling program for an embankment dam model with leakage zone, we analyse the possibility of leakages detection from 2D resistivity surveys performed along the embankment dam.
The subject of this paper is research into the application of electrical resistivity monitoring to detecting the water leakage of water utilization facilities. For this purpose, we installed a comprehensive monitoring system consisting of resistivity measurement, inclinometer, piezometer, and water gauge at an embankment. Using this monitoring system, we monitored the various kinds of measurement data and compared the resistivity structures and that of hydrological and engineering data in order to investigate the water leakage and stability of the embankment. The variant images of electrical resistivity at the embankment were provided from the monitoring data and we could accurately locate the portion of which resistivities have sharply changed. Furthermore, we could estimate the stability of the embankment more effectively and quantitatively by jointly interpreting the monitoring data of resistivity, water level, pore water pressure, and subsurface displacement. The monitoring experiments in this study led us to the conclusion that for the efficient maintenance of the water utilization facilities, monitoring the resistivity data and hydrological data would be much more preferable to performing the just one-time measurements.
The water leakage of reservoir embankment usually occurs around channelling pipes, which gives little influence on the embankment in a normal state. However, the embankment can be destroyed when the water level of reservoir increases with heavy rain and the rainy season in summer. Investigating the water vein and its path is therefore very important from the viewpoint of disaster prevention and embankment maintenance. The water leakage in dams and levees where the channelling pipes are working as weak zone was analyzed by using both numerical simulation and experimental method in this study. To detect the water leakage, an electrical resistivity survey was used and investigated for its' usability. The numerical results show the size and location of weak zone increases the importance of selection of electrode spacing. The leakage experiments of model embankment present the best result is obtained under the conditions of electrode spacing of 0.3m and dipole-dipole array. By studying the water leakage in dams and levees, the electrical resistivity survey is observed it is a very useful method to predict the leakage.
Resistivity method has been used for the dam safety inspection and, for the convenience of fieldwork, two-dimensional (2D) resistivity data has been usually measured along the dam crest. However, since the dam has three-dimensional (3D) structure, 2D resistivity survey along the dam crest violates 2D assumption and 3D effects caused by 3D topography and material properties in the dam distort the inversion result of 2D resistivity data acquired along the dam crest. Furthermore, it is really hard to evaluate the 3D structure of the dam and 3D leakage pathway using 2D resistivity survey because 2D resistivity survey can provide only 2D resistivity section beneath the survey line. In this study, 3D resistivity survey was conducted at a dam in Korea. By comparing the results from 3D and 2D resistivity surveys, merit and demerits of 3D survey were investigated. Finally, it was confirmed that 3D survey can provide more accurate information about the dam status and 3D leakage pathway compared to the 2D survey. Therefore the 3D resistivity survey should be actively expanded for more accurate dam safety inspection even though more time and expense are required.
Song Sung-Ho;Kwon Byung-Doo;Yang Jun-Mo;Chung Seung-Hwan
Geophysics and Geophysical Exploration
/
v.5
no.4
/
pp.257-261
/
2002
We have carried out integrated research including field survey and numerical modeling to appraise the applicability of SP method to the leakage problems of irrigation facilities. The leakage pattern of the dike studied here can be classified into the three categories: leakage through the abutment, leakage by piping through dike, and leakage due to the composite effects of landslide and distortion of the dike structure. for the numerical modeling to interpret quantitatively SP survey results acquired at dike, we have modified the computer code proposed by Sill (1983) to apply to the leakage problems. The numerical studies match the characteristic patterns of SP anomalies according to the leakage types and appear to be very useful to interpret the leakage zone and path. The SP monitoring results were also well coincided with tidal variations observed at every embankment so we found the SP method is quite effective not only to detect the leakage zone but also to determine the leakage trend. The numerical modeling results also reproduced the SP anomalies due to seawater leakage in the embankment.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.