• Title/Summary/Keyword: 누수관리

Search Result 242, Processing Time 0.028 seconds

A Study on the Quality Control Plan for Waterproof Construction in Apartment Houses (공동주택 방수공사 품질관리 방안 마련에 관한 연구)

  • Kim, Kwang-Ki;Kim, Byoungil
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.1
    • /
    • pp.109-120
    • /
    • 2024
  • For successful waterproofing construction, it is very important to secure construction quality as well as material performance of waterproofing materials used in construction. Due to the long-term cost reduction policy following the economic downturn in the construction market, most construction companies are using general low-priced waterproof materials rather than high-quality waterproof materials without clear quality control standards. Without clear education on construction, construction is being carried out with meaning only on construction activities. In addition, the waterproofing method applied in combination is a situation where water leakage occurs due to waterproofing failure due to insufficient construction quality because the construction method is complicated. Therefore, it is necessary to review the quality control measures(design, materials, construction) for successful waterproofing work and improve problems that are derived so that stable waterproofing work can be done. In order to expect the leakage prevention effect of a building, first, it is required to select appropriate materials for each part of the building and environment in the design stage, and the selected materials must satisfy all items of the Korean Industrial Standard(KS). Second, to secure the quality of waterproofing construction, sincere construction by workers is required. In this paper, we tried to describe "review of waterproof design", "constructor education", "site inspection", and "criticism(correction/supplementation)" as quality control measures after material selection.

Safety Evaluation and Behavior Analysis on Concrete Dam by Mornitoring - in case of Chungju dam - (계측분석에 의한 콘크리트댐의 거동분석 및 안전관리 적합성 평가 - 충주댐을 중심으로 -)

  • Kim, Wan-Young
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.11a
    • /
    • pp.161-164
    • /
    • 2008
  • It is played an important part in dam safety that KWATER is taken the responsibility of design, construction and maintenance about dam. It is considered that safety inspection of accumulated technology and knowledge of new evaluation method have developed. Thus this study is that instrumentation data is analyzed continually and dam's safety is evaluated about behavior property, in Chungju concrete dam. New evaluation method is that instrumentation data is analyzed reliability. It is suggested that suitability of management period and maintenance of instrument in dams.

  • PDF

Risk Analysis Method for Deriving Priorities for Detailed Inspection of Small and Medium-sized Fill Dam (중소형 필댐의 정밀점검 우선순위 도출을 위한 간이 위험도 분석 방법)

  • Kim, Jinyoung;Kang, Jaemo
    • Journal of the Korean GEO-environmental Society
    • /
    • v.21 no.10
    • /
    • pp.11-16
    • /
    • 2020
  • Korea's agricultural reservoir is one of the country's major infrastructures and plays an important role in people's lives. However, aging reservoirs are a risk for life and property. Currently, large and small dams and reservoirs have been constructed nationwide for more than 40 years of aging. Dams and reservoirs built nationwide are managed by various institutions. Therefore, it is difficult to manage all dams and reservoirs due to cost and time. Managers in the field with less management personnel and lack of expertise should be able to quickly identify risk factors for multiple reservoirs. In this study, risk factors such as seepage, leakage, settlement slide, crack and erosion were selected. To assess the risk of the items, we used the analytical hierarchical process (AHP), one of the Multi-Criteria Decision Making (MCDM) methods. The analysis showed that seepage has the greatest impact on reservoir collapse. It is judged that the priority of detailed diagnosis can be determined by evaluating the risk of dam reservoir collapse in a convenient way in advance using the calculated weight.

The Development of sub-event Information interface for Integrated management of underground pipelines (통합 서비스를 위한 지하매설관 하부 이벤트 정보전달 인터페이스 개발)

  • Chae, Sookwon;Seo, Jaesoon;Kim, Joonseok
    • Journal of the Society of Disaster Information
    • /
    • v.13 no.1
    • /
    • pp.26-34
    • /
    • 2017
  • In this study, for the integrated information management of underground pipelines, each information management server software must have it's inter-operability. So Many kinds of smart-city integrated platform softwares were surveyed and the best platform software was selected. The interface software modules developed in this study was installed at the test system. Through this test system, when a sub system transfers an event message to the upper integrated server system, the inter-operability test between the upper system and a sub operating system was performed and its operability was resolved.

Application of 3D Scanner for Tunnel Construction Using IT (터널 정보화 시공을 위한 3차원 스캐너의 활용 방안)

  • Son, Jae-Won;Min, Won;Ahn, Jae-Gyu;Heo, In-Wook
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2010.05a
    • /
    • pp.162-165
    • /
    • 2010
  • 우리나라 대형 건설시장의 하나인 터널 시공은 계획 대비 많은 물량과 자재의 소모로 인해 이들 정보의 지속적 관리를 통한 정확한 물량 및 자재 산출 정보 예측에 대한 관심이 꾸준히 요구되고 있는 실정이다. 대부분의 시공현장에서는 굴진의 정확도 검측을 위해 광파기를 사용하고 있다. 광파기는 공사 초기 시부터 유지된 원점으로부터의 정확한 좌표를 사용하고 있어 취득된 정보는 신뢰할 수 있으나, 몇 개의 기준점을 측량하여 굴진방향 및 공사의 진척도를 평가하는 방식이므로, 전체적인 면을 측정하지 못한다는 단점이 있다. 이에 반하여 3차원 스캐너는 제원에 따른 반경 내의 모든 점들을 계측하여 그 정보를 선이 아닌 면으로써 파악하지만 위치에 대한 정확도를 포함할 수 없다. 이러한 문제점을 보완하기 위하여, 광파기와 3차원 스캐너를 동시 활용하는 본 시스템은 현장에서 소모된 자원의 정확한 양을 체크하여 굴진정도를 파악하여 공사의 전반적인 진도를 관리할 수 있다. 또한 여굴의 발생 여부를 직접 확인하고 계획대비 소모된 물량정보를 통해 자재관리를 할 수 있게 된다. 마지막으로 추후 발생할 수 있는 하자에 대한 정확한 근거를 제시하여 균열 및 누수 등에 대한 정확한 원인 파악을 제공할 수 있다는 장점들을 제공한다.

  • PDF

Implementation of RTD-2000 Based Waterworks Pipe Network Monitoring System using Internet Map Service (범용지도를 이용한 RTD-2000 기반의 상수도 관망 모니터링 시스템의 구현)

  • Park, Jun-Tae;Hong, In-Sik
    • Journal of Korea Multimedia Society
    • /
    • v.14 no.11
    • /
    • pp.1450-1457
    • /
    • 2011
  • Currently most of leak detection monitoring systems use digital maps with paying royalties, and this increases the cost of system construction and financial burdens on local self-governing bodies that manage such systems. Moreover, they have inefficiencies in repair and maintenance, functional expansion, and compatibility with other systems. Thus, this study developed a waterworks pipe network monitoring system that pursues low cost and high efficiency using general-purpose maps on the Internet such as google maps. As this system uses highly compatible free maps, it costs less in construction and its hardware requirements are lower than existing systems, and consequently, overall monitoring performance is enhanced and the cost of construction goes down sharply. This study also proposed a method for pipeline DB construction, which can be started together with the construction of the monitoring system, in order to improve the field applicability of the system.

A Study on the Selection System of Waterproof Method by Using Database (데이터베이스화에 의한 지수공법 선정시스템에 관한 연구)

  • 천병식;최춘식;하광현
    • Journal of the Korean Geotechnical Society
    • /
    • v.18 no.6
    • /
    • pp.43-59
    • /
    • 2002
  • In this study, database systems which were used to select the waterproof method according to leakage patterns of underground structures were built by performing pilot tests, reviewing literatures, and analysing the gathered data statistically. The database was built by using check lists which consisted of 5 major items and 73 subdivided items, and 26 major parameters according to 4 classified grades were determined on the base of survey which considered various in-situ conditions. The database of waterproof methods was comprised of 10 methods which were applied in Korea. From the database of waterproof methods, application ranges and design conditions of waterproof methods were suggested. From the results of study, database system consists of parameters selection database, waterproof method database, and design condition database. From the results of pilot tests, when the database of waterproof methods was applied to design stage, saving time and reducing mistakes for selecting waterproof method were gained. In addition, when the database of waterproof methods was applied to construction stage, effects such as evaluation of applicability of waterproof method, improvement of constructability and post management were expected.

A Study on Cost Benefit Analysis Optimization Model for Water Distribution Network Rehabilitation Project of Taebaek Region (태백권 배수관망 개량사업의 비용효과분석 최적화 모델 연구)

  • Kim, Taegon;Choi, Taeho;Kim, Kyoungpil;Koo, Jayong
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.29 no.3
    • /
    • pp.395-406
    • /
    • 2015
  • This research carried out an analysis on input cost and leakage reduction effect by leakage reduction method, focusing on the project for establishing an optimal water pipe network management system in the Taebaek region, which has been executed annually since 2009. Based on the result, optimal cost-benefit analysis models for water distribution network rehabilitation project were developed using DEA(data envelopment analysis) and multiple regression analysis, which have been widely utilized for efficiency analysis in public and other projects. DEA and multiple regression analysis were carried out by applying 4 analytical methods involving different ratios and costs. The result showed that the models involving the analytical methods 2 and 4 were of low significance (which therefore were excluded), and only the models involving the analytical methods 1 and 3 were suitable. From the result it was judged that the leakage management method to be executed with the highest priority for the improvement of revenue water ratio was installation of pressure reduction valve, followed by replacement of water distribution pipe, replacement of water supply pipe, and then leakage detection and repair; and that the execution of leakage management methods in this order would be most economical. In addition, replacement of water meter was also shown to be necessary in case there were a large number of defective water meters.

A Numerical Study on Safety Evaluation of Prefabricated Sewage-Pipe Plastic Foundation Based on Pipe Diameters and Buried Soil Depths (하수관거 직경과 심도를 고려한 하수관거 플라스틱 받침기초의 안전성 평가를 위한 해석연구)

  • Park, Rae-Jin;Park, Jong-Sup
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.6
    • /
    • pp.4322-4327
    • /
    • 2015
  • Improper backfill materials and compaction controls under pipelines have become one of the major causes of failure in many sewage pipeline systems. A study on backfill materials and compaction controls has been considered for a long time. However, structural supporters under the pipe were recently concerned because of pipeline repair and maintenance. This paper presents a prefabricated plastic foundation for supporting a sewage pipe system and increasing the performance function of the pipes. Several analytical models for the plastic foundations were investigated using finite-element program, ABAQUS, for checking safety. Comparing with the results of analyses, some of economic design sections based on the sizes of pipe diameters, 600mm, 700 and 600mm, were evaluated. These results could be applied to a pipeline system with a prefabricated plastic foundation with respect to pipe diameters and buried depths.

Calculation of the target revenue water ratio of local waterworks considering economic feasibility (경제성을 고려한 지방상수도 목표 유수율 산정)

  • Donghong Kim;Jaebum Lee;Jungkwan Song;Taeho Choi
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.37 no.6
    • /
    • pp.311-324
    • /
    • 2023
  • As an advanced study on the method of calculating the target revenue water ratio of local waterworks through the leakage component analysis method proposed by Kim et al. (2022), this study developed a model to calculate the achievable revenue water ratio within the specified project cost, the required project cost to achieve the specified target revenue water ratio, and the economically appropriate target revenue water ratio level by considering the leakage reduction cost and leakage reduction benefit for each revenue water ratio improvement strategy, and conducted an applicability evaluation of the developed model using actual field data. The procedure for calculating the target revenue water ratio of local waterworks considering economics proposed in this study consists of three stages: physical data linkage model construction, leakage component analysis, and economic analysis, and the applicability was evaluated for Zone H with branch type and the Zone M network type. As a result of the application, it was calculated that approximately 32.5 billion won would be required to achieve the target revenue water ratio of 70% in the Zone H, and approximately KRW 10.5 billion would be required to achieve the target revenue water ratio of 75% in the Zone M. If the business scale of Zones H and M was corrected to 10,000 m3/day of water usage, the required project cost for a 1% improvement in the revenue water ratio of Zone H was calculated to be 0.7642 billion won and 0.4715 billion won for Zone M.