• Title/Summary/Keyword: 노선체계 평가

Search Result 66, Processing Time 0.028 seconds

Equity Analysis of Feeder Bus Routes in Seoul using DEA(Data Envelopment Analysis) Model (DEA(Data Envelopment Analysis) 모형을 이용한 서울시 지선버스노선의 형평성 분석)

  • Han, Jin-Seok;Kim, Hye-Ran;Go, Seung-Yeong
    • Journal of Korean Society of Transportation
    • /
    • v.29 no.2
    • /
    • pp.15-24
    • /
    • 2011
  • This study discusses an equity analysis performed to supplement the existing bus service evaluation system. The equity of 179 feeder bus routes in the city of Seoul(Year 2009) is analyzed by employing the modified BCC model along with the desirable inputs such as a number of bus stops and a frequency of operations. In the analysis, each DMU (Decision Making Unit) is assumed to use the desirable inputs, and produces both the index of equity and the index of accessibility. We apply an input-oriented modified BCC model to analyze the equity of the DMUs. The computational result indicates that only 9% of the feeder bus routes are equitable among the total DMUs and the average equity estimate is 0.702. It is also suggested that on average approximately 60% increases of desirable inputs (i.e., a number of bus stops and a frequency of operations) are needed in order to improve equity of DMU in the city of Seoul. The result of the tobit regression analysis on the determinant factors affecting the equity of DMUs shows that all the independent variables (i.e., a number of bus stops and a frequency of operations) are statistically significant at 5% significance level, and the number of bus stops is found to be the most influential factor.

Planning of Alternative Forest Road Network Using GIS (GIS를 이용한 대안별 임도노망의 계획에 관한 연구)

  • Jeon, Kwon-Seok
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.11 no.1 s.24
    • /
    • pp.21-28
    • /
    • 2003
  • This study was aimed at suggest a proper planning method to select a optimal forest road network in mountains forest using GIS(Geographic Information System). To examine the field applicability, the method was applied to the National Forest at Mt. Kumsan in Namhae-gun, Gyungsangnam-do. The main results from altogether six alternative road route plans were derived from these criteria obtained the alternative route plan No.2 has two layout criteria, longitudinal gradient and earth work volume, and it showed similar pattern of existing forest road network which was designed mainly ground slope and longitudinal gradient. The alternative route plan No.6 has four criteria, longitudinal gradient, earth work volume, investment effect and landscape impact. It was different for the lowest forest road density among the alternatives and the pattern of the forest road layout was radial form, which was also quite different to other alternatives. For optimal forest road network planning, GIS provide the efficient and resonable solutions for decision making to provide the support for evaluation about various alternative road networks. If detailed inventory and relevant data are provided and also clear and objective indicators for evaluations are set up, it could be applied to preliminary analysis and detail planning stage to prevent undesirable effect such the land slide and soil erosion due to inadequate planning for forest road network.

  • PDF

A Study on Fare Estimation for Demand Responsive Transport (수요응답형교통체계 이용요금 가치 추정 연구)

  • Kim, Wonchul;Namgung, Moon
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.14 no.1
    • /
    • pp.103-111
    • /
    • 2015
  • The purpose of this study is to estimate the appropriate Demand Responsive Transport (DRT) fare for bus users upon introduction of the system, which is to improve ridership on economically non-profitable routes and to conform to the mobility right of those living in presently non-serviced rural areas. For this, a stated preference (SP) survey was adopted to assess respondents' preferences regarding DRT introduction, while the contingent valuation method (CVM) was used to calculate their willingness to pay (WTP) for DRT services. The analysis results show that, compared to the existing bus services with a 1,000 won bus fare, the value of DRT is considered to be 38.85%, 31.03% and 30.12% higher in terms of overall assessment, usability and convenience, respectively. The results of this study are expected to facilitate the decision making aimed at setting the appropriate DRT fare and implementing a DRT system that meets sustainability requirements.

Development of Route Selecting System based on GIS for Prior Environmental Review using AHP (AHP 기법을 활용한 GIS기반의 사전환경성검토 노선선정시스템 개발)

  • Kim, Sang-Seok;Jang, Yong-Gu;Yang, Seung-Tae;Kang, In-Joon
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.10 no.2
    • /
    • pp.152-163
    • /
    • 2007
  • The on-going pre-environmental investigation at present is performed by separate numerical analysis of each provision which makes integrated pre-environmental investigation is difficult. The application of numerical data is insufficient, which results to the deterioration of environmental investigation result's objectivity. A lot of time and money is required for the investigation. In this study, the spacial analysis function of GIS was applied on the 8 pre-environmental investigation factors. Pre-environmental investigation GIS DMS(Decision Making System) using AHP was constructed to make integrated investigation possible through the use of investigation results for each factor. Through the use of the developed pre-environmental investigation GIS DMS and the pre-constructed GIS data, the objectivity of environmental investigation is sufficient and time and cost are reduced. Therefore, this system can be used for pre-environmental investigation during route selection in the initial stages of road construction. Through the numerical and visual data obtained from the system developed in this paper, it is easier to gain the approval of the public. Furthermore, environmental problems due to road construction can be investigated with less time and money during the initial stages of road construction.

  • PDF

Development and Application of LOS (Level of Service) for Accessibility to Railway Stations (철도역 연계서비스수준(LOS) 평가지표 설정 및 적용방안)

  • Kim, Si Gon;Kim, Dong Hwan
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.1
    • /
    • pp.115-120
    • /
    • 2016
  • This paper presents how LOS (Level of Service) of connectivity at railway stations is developed. Based on interview surveys to railway users at 56 railway stations, the catchment areas for railway is defined and MOE (Measures of Effectiveness) is also developed. The MOE is determined to be the weighted access time (min) and LOS "D" was set up between 45 mins and 60 mins. The 56 railway stations is evaluated based on this MOE and most of them is found to be below LOS "E". Finally some guideline for improving the LOS of accessibility. They are an expansions of accessibility facility, an expansion of bus route, an improvement of congestion roads, and expansions of parking lots for automobile users.

Current status and future direction of constructed-response assessments - Cases of secondary mathematics in Gyeonggi-do and Ohio - (중등 수학과 서술형평가 체계의 실제와 대안적 발전 방향 모색 - 경기도 창의.서술형 평가와 미국 오하이오 주 평가를 중심으로 -)

  • Kim, Rae-Young;Kim, Goo-Yeon;Noh, Sun-Sook;Kim, Min-Kyeong;Jeon, Ji-Hoon;Kim, Ki-Young;Lee, Min-Hee
    • Communications of Mathematical Education
    • /
    • v.26 no.3
    • /
    • pp.273-299
    • /
    • 2012
  • The purpose of this study is to investigate how constructed-response assessments are currently defined and used to find an alternative way of developing well-defined constructed-response questions and an assessment system. Based on our review of the literature, we analyze constructed-response assessments developed and used in Gyeonggi-do, South Korea and Ohio, U.S.A. in terms of their definitions, types of questions, information and guidelines given by the government agencies in each place, and scoring rubrics and their use. The results provide meaningful implications for the development of constructed-response assessments in the future.

A Study on the Change of Monthly Patterns of Bus Passenger Demand According to Bus Route Change (시내버스 노선변경에 따른 승객수요의 월별패턴 변화에 관한 연구)

  • Seo, Young-Woo;Kim, Ki-Hyuk
    • Journal of Korean Society of Transportation
    • /
    • v.26 no.5
    • /
    • pp.81-90
    • /
    • 2008
  • Bus passengers need some time to adapt to the changed bus route or free bus transfer system which is part of the public transportation system restructuring plan. This research is focused on the characteristics of monthly patterns of bus passengers. The period of stabilization of bus passenger demand after the rearrangement of bus route system by a time series were analysed. In order to look into the characteristics of bus passenger demand by month, data on the number of monthly bus passengers of recent five years in metropolitan cities across the nation was collected. Kendall's coefficient of concordance is used to test whether the cities showed concordance with respect to the number of monthly bus passengers during a period of five years. The study collected and performed a time series analysis of data on the number of monthly bus passengers during the past ten years in Daegu metropolitan area which carried out a new bus route plan in February 2006. The number of monthly bus passengers in 2006 was estimated using the time series analysis. The city of Daegu found that after six months the estimated and actual values displayed a similar pattern. This result can be applied to other cities in estimating the passenger demands in the future.

Development of an Technique for Assessing Priority of Alternatives in Railroad Projects Considering Civil Petitions (민원을 고려한 철도대안 우선순위 판단기법 개발)

  • Chung, Sung-Bong;Song, Ki-Han;Hong, Sang-Yeon;Kim, Dong-Jun;Kim, Dong-Sun
    • Journal of Korean Society of Transportation
    • /
    • v.23 no.7 s.85
    • /
    • pp.87-98
    • /
    • 2005
  • Through rail transit has many merits as a safe, environmental harmonic and scheduled transit, there are many problems to construct railroads because of the public resentment. However, there is no reasonable way to settle the conflict properly and it causes enormous social and economic losses. This paper suggests a methodology to evaluate public complaint using the AHP technique, which is generally used as the methodology to evaluate public complaint using the AHP technique, which is generally used as the Multi-Criteria Decision Making (MCDM). However, the result from the AHP has some defects to control conflicts because the interests related to railroad projects are so complex that it is hard to make people persuaded easily. Therefore, this paper suggests 'the improvement ranking method', 'the sensitive analysis', and 'the assessment of independence relationship' which can aid the basic AHP to be robust. And the AHP. modified by fuzzy method, is also suggested to apply this methodology to example rail paths in Korea.

A Study on The Demand Management for Determination of Freeway Toll System (고속도로 통행요금체계 결정을 위한 수요관리방안 연구)

  • 권용석
    • Journal of Korean Society of Transportation
    • /
    • v.21 no.3
    • /
    • pp.7-14
    • /
    • 2003
  • Statistics shows that 80% of freeway users travel less than 50km, and only 8% of them do over 100km. It means that the freeway is used for commuting. As a result, the freeway is not used efficiently and social cost is high. The current toll system aims for the efficient usage of the freeway by restraining short-distance trips and inducing long-distance ones. Thus, policies such as minimum toll system and discount for long-distance trips have been carried out. However. these two policies take no account of demand management between the freeway and alternative roads. They merely consider the compensation for charge on users, so the assessment of discount rate and distinction of distance are not reasonable. Consequently, not only the effective demand management but also the evaluation of those policies has been difficult to be achieved. The objective of this paper is to analyze those problematic policies and to establish a reasonable and improved toll system. In addition, this study presents the methodology to minimize social cost, which can be achieved by reducing short trips and encouraging long ones on the freeway. A new methodology of freeway toll system is applied and the results are presented.

Environment-Friendly Optimum Route Selecting With Geo-spatial Information Analysis (지형공간정보분석에 따른 환경친화적 최적 도로노선 선정)

  • Kim, Sang-Seok;Jang, Yong-Gu;Choi, Su-Geun;Kang, In-Joon
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.13 no.3 s.33
    • /
    • pp.69-77
    • /
    • 2005
  • Most of the evaluations of environmental effect of construction of road do not run parallel with the evaluation of the propriety of the business, but it just reviews how to reduce contamination before the beginning of the construction work. This reveals the limitation of the induction of environment friendly development from the fundamental. In this study, a function of GIS spatial analysis for 9 elements of pre-evaluation of environmental effect has been introduced, and a GIS decision making system for environmental effect of a road has been established for an integrated evaluation by using individual evaluation result. By using GIS decision making system for pre-evaluation of environmental effect that has been developed in this study and the GIS data that has been collected, it would be possible to decrease time and money for evaluation as well as fulfill the requirement of objectivity. Therefore, it would be possible to apply for pre-evaluation of environmental effect when deciding on the route of the road at the beginning stage of the construction work. Also, through the system developed in this study, the construction body could easily induce a mutual agreement with the residents by the visual evaluation material, which might result in an evaluation of environmental effect while decreasing time and money at the beginning stage of the construction.

  • PDF