• Title/Summary/Keyword: 노무비용

Search Result 42, Processing Time 0.02 seconds

A Study on the Development of Construction Production Rates System for Estimating Proper Construction Expenses of Off-Site Construction (OSC) Based PC Structure Factory-Built Assembly (OSC기반 PC구조 공장제작 적정 공사비 산정을 위한 품셈체계 개발 연구)

  • Lee, Jeongwook;Lee, Hansoo;Lee, Chiho;Noh, Hyunseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.6
    • /
    • pp.89-100
    • /
    • 2022
  • The development of the Construction Production Rates System for appropriate construction cost calculation has recently come to the fore as a means of invigorating OSC based PC structure which currently needs institutional frameworks. PC structure based construction expenses consist of the factory-built assembly, transportation and on-site installation. Recently, in the field of transportation and site installation, research on product structure development is being conducted, such as presenting the standard product calculation system reflecting the results of field survey for each subsidiary materials (Lee et al., 2021). On the other hand, there is no ongoing research on estimating construction expenses of Factory-built assembly. This study suggests Construction Production Rates System which can be used for PC subsidiary materials based Factory-built assembly cost estimations. For the research, work types for the construction procedures have been categorized, and the standard input manpower suitable for the corresponding work characteristics has been derived from analyzing the associated Construction Standard Production Rates for each work type. Also, as the research referred PC subsidiary materials (such as columns, beams, walls, and slab, as well as on-site installation) and the standard number of workforce based on work types, one can calculate direct labor cost, using what the research shows. In addition, it suggests that the size of individual subsidiary materials be the extra cost factor, by using the characteristics that productivity changes depending on the size(m3) of subsidiary materials. It is expected that the research can contribute to objectively verifying factory-built assembly cost through of PC structure, which currently relies on estimates.

A Study on Analysis of Facility Design in Recreation Forest - With a Special Reference to Chonbuk Province - (자연휴양림(自然休養林)의 시설설계(施設設計)의 분석(分析) - 전북지역(全北地域)을 중심(中心)으로 -)

  • Lee, Chang-Heon;Park, Chong-Min
    • Journal of Korean Society of Forest Science
    • /
    • v.85 no.2
    • /
    • pp.158-171
    • /
    • 1996
  • In Korea, 80,616 ha in 139 places have been designated as recreation forests by the end of 1994. Among these places, 64,547 ha in 76 places were designated in the national forest, 9,937 ha in 25 places were designated in the public forest, and 6,132 ha in 38 places were designated in private forest. Designs of 10 places and plans of 6 places in 14 places of recreation forest in Chonbuk province were compared and analyzed. The results are as follows: 1. Sixty four types of convenient facilities, 15 types of athletic facilities, 13 types of sanitation facilities, 22 types of education facilities were designed in 10 places of the recreation forest. 2. The material cost was the highest in construction costs in Waryong recreation forest. However, the labor cost was the highest one in construction costs in 5 places of recreation forest ; Dokyu-san, Hoimoon-san, Saesim, Seongsu, and Sokgeum-san And the total construction cost was much higher in private recreation forest than in both of national and public recreation forest. 3. Hoimoon-san was the only recreation forest which makes profit among 14 recreation forests in Chonbuk province. The uses of this recreation forest are increasing, and seasonal uses significantly fluctuate. 4. There are several problems for the public in enjoying these recreation forest places. The access to these places by public transportations is inconvenient. The time required for construction of many places are too long after they are designated as recreation forest, and the management of the established recreation forest is poor. 5. To improve the method of facility design in recreation forest, easy access to nature should be promoted such as recreation forest places and understanding of public concerning nature are needed. Recreation forest places themselves need to offer good facilities, and convenient access. And to make frequent use of recreation forest places, a system of information and excellent service to the public are strongly recommended.

  • PDF