• Title/Summary/Keyword: 노면

Search Result 669, Processing Time 0.034 seconds

Software Development of the Traffic Noise Prediction Based on the Frictional Interaction between Pavement Surface and Tire (포장노면과 타이어간의 마찰음 분석을 통한 교통소음예측 소프트웨어 개발)

  • Mun, Sung-Ho;Lee, Kwang-Ho;Cho, Dae-Seung
    • International Journal of Highway Engineering
    • /
    • v.13 no.2
    • /
    • pp.67-75
    • /
    • 2011
  • Domestic economic development, industrialization, and urbanization have brought along not only increased highway traffic but also elevated traffic noise levels. Thus, it is necessary to accurately predict the traffic noise levels in order to address the public demand of alleviating the noise levels in urban areas. In this study, the method of evaluating the sound power level of road traffic was investigated in terms of considering the types of road surface and vehicle, based on previous researches. Regarding CPX (Close Proximity Test) and Pass-by test, the measured noise data of Test Road of Korea Highway Corporation were utilized in order to construct the database of sound power levels of various vehicles. Specifically, the 38 noise measurement and analysis in 1/1-octave band frequencies at 12 pre-selected sites were carried out, considering topography and road surface. Finally, the comparison study was conducted between predicted and measured data in terms of traffic noise. The traffic noise prediction was based on the KRON (Korea Road Noise) program, which was developed being equipped wit 3-dimensional GUI. In addition, the traffic noise characteristics were evaluated in terms of vehicle types and pavement surface conditions.

Evaluation of Impact Factor in Composite Cable-Stayed Bridges under Reliability-based Live Load Model (신뢰도 기반 활하중모델에 의한 강합성 사장교의 충격계수 평가)

  • Park, Jae Bong;Park, Yong Myung;Kim, Dong Hyun;Lee, Jong Han
    • Journal of Korean Society of Steel Construction
    • /
    • v.25 no.4
    • /
    • pp.335-346
    • /
    • 2013
  • AASHTO LRFD and Korean Bridge Design Code (Limit State Design) specify to consider Truck and Lane load simultaneously determined from reliability-based live load model, and impact shall be applied to the truck load while it shall not be applied to the lane load. In this paper, vehicle-bridge interaction analysis under moving truck and lane loads were performed to estimate impact factor of the cables and girders for the selected multi-cable-stayed composite bridges with 230m, 400m and 540m main span. A 6-d.o.f. vehicle was used for truck load and a series of single-axle vehicles was applied to simulate equivalent lane load. The effect of damping ratio on the impact factor was estimated and then the essential parameters to impact factor, i.e., road surface roughness and vehicle speed were considered. The road surface roughness was randomly generated based on ISO 8608 and it was applied to the truck load only in the vehicle-bridge interaction analysis. The impact factors evaluated from dynamic interaction analysis were also compared with those by the influence line method that is currently used in design practice to estimate impact factor in cable-stayed bridge.

Evaluation of Impact Factor in Suspension Bridges under A Series of Moving Vehicles (일련의 주행 차량에 의한 현수교의 충격계수 평가)

  • Park, Yong Myung;Kim, Dong Hyun;Kim, Hee Soon;Park, Jae Bong
    • Journal of Korean Society of Steel Construction
    • /
    • v.26 no.5
    • /
    • pp.485-498
    • /
    • 2014
  • In this paper, vehicle-bridge interaction analysis under a series of moving vehicles to simulate a lane load was performed to estimate impact factor of the main cable, hanger and girder for the selected suspension bridges with 404m and 1545m main span. Korea Bridge Design Code(Limit State Design) was selected for the live model in which KL-510 truck was modeled 6-d.o.f. vehicle and a lane load was simulated by a series of single-axle vehicles. For the 404m main span bridge, hinge-type and floating-type girders at the tower were considered to examine the impact factor according to the connection and supporting type of the girders. The parameters considered herein are the types of live load-a truck only and a truck plus lane load, eccentricity of moving vehicles, road surface roughness and vehicle speed. The road surface roughness was randomly generated based on ISO 8608 and it was applied to the truck only. The impact factors were also evaluated by using the influence line method that is commonly used in cable-supported bridges and compared with those from vehicle-bridge interaction analysis.

Status of Damage and Restoration Planning of Forest Trail in Choansan(Mt.) Neighborhood Park, Seoul, South Korea (초안산근린공원 숲길 훼손 실태 및 복원방안 연구)

  • Han, Bong-Ho;Ki, Kyong-Seok;Noh, Tai-Hwan
    • Korean Journal of Environment and Ecology
    • /
    • v.26 no.6
    • /
    • pp.923-933
    • /
    • 2012
  • The purpose of this study targeting Choansan(Mt.) Neighborhood Park in Seoul of South Korea, whose level of visitation and use pressure has been recently increasingly high, was to understand distribution and damage status of forest trail and accordingly, set up direction of how to improve forest trail in urban area. With regards to current damage on forest trail in Choansan(Mt.) Neighborhood Park, the damaged trail with road width of over 2m and with erosion depth of over 30cm amounted to 20.3% and 36.3% respectively. And the trail section with bare land erosion, root exposure or rock exposure and the section whose impact rating class exceeded IV occupied 47.0% and 70.6%, indicating the forest trail was severely damaged. The severely injured trail route mainly included the main forest trail formed along the main ridge, the byroad connected to the main forest trail and the steep forest trail in low-lying area. Based on the study results, five types of restoration of forest trail in Choansan(Mt.) Neighborhood Park were offered, including prevention of forest trail extension, stabilization of forest trail base, maintenance of forest trail surface, vegetation restoration after closing forest trail and maintenance. Ecological restoration was additionally offered. The prevention of forest trail extension was planned to prevent expanded width of forest trail where bare land was exposed. The stabilization of forest trail base was planned to prevent erosion in the forest trail and exposure of roots. The maintenance of forest trail surface was planned in a way to protect the severely damaged forest trail surface by using wood deck and wood stairs and surfacing the road.

Design of Road Surface Drainage Facilities Based on Varied Flow Analysis (부등류 해석을 기반으로 한 노면배수시설 설계)

  • Ku, Hye-Jin;Kim, Jin-Soo;Park, Hyung-Seop;Jun, Kyung-Soo
    • Journal of Korea Water Resources Association
    • /
    • v.41 no.12
    • /
    • pp.1173-1185
    • /
    • 2008
  • The design methods of the road surface drainage facilities were compared for the improvement of design method. We have developed four computational design models classified by the methods to determine the duration of design rainfall and to analyze the flow of a linear drainage channel. The critical duration was determined by assuming the critical duration to be 10 minutes or by finding the duration of design storm being similar to the travel time of flow by trial and error. The flow of a linear drainage channel was analyzed as the uniform flow or the varied flow. The design models were applied to the artificial road surface drainage facilities with various channel slopes and road shoulder slopes. If the rainfall intensity of the 10 minutes duration was applied, the outlet spacing obtained from the design based on the varied flow analysis was larger than the uniform flow analysis only when the channel slope and the road shoulder slope was small. On the other hands, if the duration of design rainfall was determined by calculating the travel time, the varied flow analysis brought about larger outlet spacing than the uniform analysis for all conditions. However, the model of the critical duration concept and the varied flow analysis resulted in smaller outlet spacing than the current design method employing the rainfall of 10 minutes duration and the uniform flow analysis.

Analysis of the Effectiveness of Simplified Slope Stabilization Methods for the Continuous Utilization of Skid Trails (산림작업로의 지속적 활용을 위한 간이 사면안정처리 효과분석)

  • Lee, Kwan-Hee;Hwang, Jin-Seong;Ji, Byoung-Yun
    • Journal of Korean Society of Forest Science
    • /
    • v.108 no.4
    • /
    • pp.582-591
    • /
    • 2019
  • This study was conducted to develop low-cost, simplified slope stabilization methods for the continuous utilization of skid trails, and to analyze the effect of the developed methods. Slope stabilization methods were created on the fill slopes of skid trails in the Forest Technology and Management Research Center of the National Institute of Forest Science.We measured the settlement and bearing capacity of skid trail surfaces, and the displacement of slope stabilization methods with respect to the number of passes (maximum 100 passes) by a logging truck weighing 17 tons. The constancy of slope stabilization methods was determined by measuring displacement of the stabilization structure with respect to the number of logging truck passes. Results showed that the bearing capacity in most cases was insufficient, but that the settlement of skid trails was less than 150 mm, which was considered reasonable. In addition, the stability of root staking wallswas somewhat low, but the average displacements of all slope stabilization methods were generally around 20 mm or less, indicating no issues regarding structural stability. By applying the simplified stabilization methods to skid trail maintenance following timber harvesting, efficient timber harvesting can be achieved. Additionally, these methods can be utilized as permanent forest management infrastructures and complement insufficient forest road facilities.

Evaluation of Side-ditch Erosion Factors and Judgment of Side-ditch Stability in Forest Road (임도(林道) 옆도랑의 침식요인(浸蝕要因) 평가(評價)와 안정성(安定性) 판별(判別)에 관(關)한 연구(硏究))

  • Lee, Hae-Joo;Ji, Byoung-Yun;Jung, Do-Hyun;Kim, Jong-Yoon;Cha, Du-Song
    • Journal of Korean Society of Forest Science
    • /
    • v.89 no.3
    • /
    • pp.397-404
    • /
    • 2000
  • This study was carried out to investigate the influence of the road structure and site conditions on side-ditch stability of forest road. For experimental purposes, the forest road in the Kwangrung Experimental Forest, Korea Forestry Research Institute, was chosen as a study site. A total of 556 plots wes set up as every longitudinal gradient changing points by belt-transect method. Data of 10 road structural characteristics and side-ditch stability were collected from each plot and analysed by Quantification II. The main factors in order of partial correlation coefficient were longitudinal gradient, road position, inclination of cut-slope, constituent material of cut-slopes, distance of surface flow, cross-sectional shape of road, pavement material, vegetation of cut-slopes and length of cut-slope. The erosion of side-ditch of forest road occurred in the following cases; more than 8% of the longitudinal gradient, road position of hill under side and foot hill, more than $50^{\circ}$ of inclination of cut-slope, constituent material of cut-slopes of hard soil and gravel soil, more than 80m of distance of surface flow, pavement material with earth or gravel, more than medium covered of vegetation of cut-slopes, and the straight and convex form of road-bed.

  • PDF

Automatic Extraction of Training Dataset Using Expectation Maximization Algorithm - for Automatic Supervised Classification of Road Networks (기대최대화 알고리즘을 활용한 도로노면 training 자료 자동추출에 관한 연구 - 감독분류를 통한 도로 네트워크의 자동추출을 위하여)

  • Han, You-Kyung;Choi, Jae-Wan;Lee, Jae-Bin;Yu, Ki-Yun;Kim, Yong-Il
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.27 no.2
    • /
    • pp.289-297
    • /
    • 2009
  • In the paper, we propose the methodology to extract training dataset automatically for supervised classification of road networks. For the preprocessing, we co-register the airborne photos, LIDAR data and large-scale digital maps and then, create orthophotos and intensity images. By overlaying the large-scale digital maps onto generated images, we can extract the initial training dataset for the supervised classification of road networks. However, the initial training information is distorted because there are errors propagated from registration process and, also, there are generally various objects in the road networks such as asphalt, road marks, vegetation, cars and so on. As such, to generate the training information only for the road surface, we apply the Expectation Maximization technique and finally, extract the training dataset of the road surface. For the accuracy test, we compare the training dataset with manually extracted ones. Through the statistical tests, we can identify that the developed method is valid.

Comprehensive Evaluation of Freeway Surface Conditions based on User's Satisfaction (이용자 만족도를 고려한 고속도로 노면상태 종합평가에 관한 연구)

  • Son, Young-Tae;Lee, Jin-Kak;Lee, Shin-Ra;Jung, Chul-Gie
    • International Journal of Highway Engineering
    • /
    • v.12 no.3
    • /
    • pp.37-47
    • /
    • 2010
  • This research is aimed at comprehensively evaluating the condition of a road surface of a highway in satisfaction of its users. This research conducted an overall evaluation of a road surface condition by adding qualitative data, or a driver's satisfaction to the existing quantitative elements, whereas the existing research put its focus on a correlation analysis with quantitative factors and qualitative factors through a statistical method. As for an evaluation method, this research conducted an overall evaluation by using Grey System Theory which makes possible an integrated evaluation. The analyzed results make it possible to diagnose the current conditions of each section of object roads and to predict the potentially changeable conditions for the time to come. In addition, these analyzed results could hopefully be applied to the maintenance of freeways through diverse methods. It is hoped that the evaluation of a road surface condition of a highway in satisfaction of its user could be helpful to keeping up the satisfaction of a driver and passenger on the highway by more than a certain level. In addition, the analyzed data on the influence of data value observed by comprehensively evaluating a variety of elements could be used as a secondary means of the decision-making process in relation to road maintenance. On top of that, it could be used as a means of improving road maintenance system and offering the improved driving environment of the highway.

Detection Algorithm of Road Damage and Obstacle Based on Joint Deep Learning for Driving Safety (주행 안전을 위한 joint deep learning 기반의 도로 노면 파손 및 장애물 탐지 알고리즘)

  • Shim, Seungbo;Jeong, Jae-Jin
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.20 no.2
    • /
    • pp.95-111
    • /
    • 2021
  • As the population decreases in an aging society, the average age of drivers increases. Accordingly, the elderly at high risk of being in an accident need autonomous-driving vehicles. In order to secure driving safety on the road, several technologies to respond to various obstacles are required in those vehicles. Among them, technology is required to recognize static obstacles, such as poor road conditions, as well as dynamic obstacles, such as vehicles, bicycles, and people, that may be encountered while driving. In this study, we propose a deep neural network algorithm capable of simultaneously detecting these two types of obstacle. For this algorithm, we used 1,418 road images and produced annotation data that marks seven categories of dynamic obstacles and labels images to indicate road damage. As a result of training, dynamic obstacles were detected with an average accuracy of 46.22%, and road surface damage was detected with a mean intersection over union of 74.71%. In addition, the average elapsed time required to process a single image is 89ms, and this algorithm is suitable for personal mobility vehicles that are slower than ordinary vehicles. In the future, it is expected that driving safety with personal mobility vehicles will be improved by utilizing technology that detects road obstacles.