• Title/Summary/Keyword: 내역항목

Search Result 52, Processing Time 0.023 seconds

Conceptual Cost Estimate Method of Public Office Building Structural Frame Work by Regression Analysis (회귀분석을 통한 공공청사 골조 공사의 개산견적 방안)

  • Jo, Yeong-Ho;Choi, Hyun-Jun;Kim, Jung-Won;Yun, Seok-Heon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.2
    • /
    • pp.147-153
    • /
    • 2020
  • It is important to estimate the optimal construction cost at the early stage of the project. In this regard, conceptual cost estimate is an important factor for estimate optimal construction cost. However, domestic conceptual cost estimate are only used as cost per unit area according to the building type, and it's accuracy is not high. Hence, the purpose of this study is to calculate the approximate quantity and cost for reinforcing bars, concrete, and formwork by presenting a regression formula based on the total floor area of the common work items in the frame work. In order to verify the accuracy and validity of the regression formula presented in this study, a comparative analysis was performed by applying the regression formula and the traditional approximate quantity take-off method to real cases. As a result, the estimated error rate of the traditional method was -102~+55%, and exceeded the estimated conceptual cost estimate accuracy range of -50~+100% suggested by AACE(American Association of Cost Engineering). On the other hand, the error rate of the regression formula method presented in this study was -6.4~+11.62%. This can be used not only for conceptual cost estimate range of accuracy, but also for detailed estimates. However, it is necessary to analyze the factors that affect the unit price as well as quantity in order to calculate the appropriate cost.

치면열구전색술(치아홈메우기) 건강보험 급여기준 개발

  • Lee, Sang-Ho;Lee, Gwang-Hui;Jang, Gi-Taek
    • Journal of the korean academy of Pediatric Dentistry
    • /
    • v.36 no.4
    • /
    • pp.654-666
    • /
    • 2009
  • 우식활성이 높은 어린이와 청소년 전체를 수용할 수 있는 치면열구전색(치아홈메우기) 사업의 확대 재생산을 위한 방안으로 건강보험 급여에 포함하는 정책이 2009년 12월부터 실시됨에 따라 본 연구는 급여화 기준 설정, 상대가치지수 개발 및 수가산정, 소요 재정추계 등, 급여화 운용을 위한 제반사항을 연구, 개발하는데 그 목적이 있다. 본 연구에서는 치면열구전색술의 적응증, 실시연령, 대상치아등에 대해 문헌고찰과 함께 상기 항목에 대한 정책적인 면에서의 검토를 시행하였으며, 치과의사를 대상으로 전국규모의 설문조사를 실시하여 치면열구전색술의 상대가치지수(RBRVS)와 연계한 의사업무량을 산출하고, 행위 기술서를 작성하였으며, 직접 및 간접비용의 세부내역 산출하였다. 도출된 상대가치지수를 바탕으로 예상수가를 산정하였으며 이를 근거로 대상 연령 및 대상치아, 의료 이용율 대비 재정추계 시행하였다. 이와함께 치면열구전색술의 급여화 순조로운 정착을 위한 외국사례 연구, 보험적용추진을 위해 치면열구전색의 유지율 및 비용효과, 예방적 레진수복과의 차등화문제, 재료적 고찰, 대국민 및 시술기관 대상 홍보 사항 등 급여화에 관련된 제반 사항을 검토, 제안하였다.

  • PDF

A Study on the Cost Estimating Method based on Spatial Unit Focused on Improving Limitation Caused by Lack of Spatial Information of the Cost Based on Work Type (공간단위 공사비 산정방법에 관한 연구 - 공종별 공사비의 공간정보 부재로 인한 한계점 개선을 중심으로 -)

  • Lee, Ki-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.3
    • /
    • pp.131-139
    • /
    • 2011
  • In this Study, the Cost of Public Facility Construction in the VE Cost Model, and the Progress of the Construction Site Management, and Cost due to the Lack of Cpatial Information in Dispute Cost Work Type Recognize the limits of Historical Information, and to Overcome the Perception of Cost and Space Systems Unit In the Process of Transition that Began Seeking Ways to Improve Through this Study, Different Parts of the Proposed Area of Construction Work Unit System, the Core of Calculating Hourly and Detailed Engineering Information and Cost Information Generated Extension to Configure the Construction Unit in Every Space, Every Work Unit System, All Materials That Make Up Work Unit System, Unit Labor Costs, And All of the Configuration Items Enables Precise And Multidimensional Understanding is That.

건설정책 - 하도급계약 '구두발주' 관행 없앤다!

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.258
    • /
    • pp.61-64
    • /
    • 2012
  • 공정거래위원회(위원장 김동수)가 하도급거래에서 서면발급 및 보존관행을 정착시키기 위해 "바람직한 서면발급 및 보존에 관한 가이드라인"을 제정해 1월 1일부터 시행에 들어갔다. 가이드라인에는 ${\bigtriangleup}$하도급계약서(추가 변경계약서 포함) ${\bigtriangleup}$하도급계약 확인서면 ${\bigtriangleup}$목적물 등 수령증명서 ${\bigtriangleup}$검사결과 통지서 ${\bigtriangleup}$감액서면 ${\bigtriangleup}$기술자료 제공 요구서 ${\bigtriangleup}$계약변경 내역 통지서 등 7건은 의무발급을, ${\bigtriangleup}$목적물 등의 검사결과 및 검사 종료일 ${\bigtriangleup}$하도급대금의 지급일 지급금액 및 지급수단 ${\bigtriangleup}$설계 변경 등에 따라 하도급대금을 조정했을 때 사유 ${\bigtriangleup}$원재료 등의 가격변동 등에 따라 수급사업자가 하도급 대금 조정을 신청한 경우 협의내용 및 조정사유 등 7건은 보존 서면으로 명시했다. 이번 가이드라인은 동반성장협약 평가 항목에도 반영될 예정이다. 또한 공정거래위원회는 하도급법상 서면발급 또는 보존의무를 위반해 경고조치를 받을 때에는 교육이수를 권고하는 한편, 서면 미발급 등 혐의가 반복될 때에는 최고경영자(CEO)가 교육(3개월에 3시간)을 이수토록 규정했다. 특히 서면실태조사에서 서면 미발급 미보존 혐의가 장기간 상습적으로 이뤄졌다는 사실이 확인되면 직권조사를 거쳐 엄중할 방침이다.

  • PDF

Comparison of Expectation and Satisfaction of Implant Patients in Pre-post Implant Therapy (임플란트 시술환자 시술 전·후의 기대와 만족도 비교)

  • Han, Ji-Hyoung;Kim, Ki-Eun
    • Journal of dental hygiene science
    • /
    • v.11 no.2
    • /
    • pp.121-127
    • /
    • 2011
  • This study was conducted to improve patients satisfaction by comparing patients expectation prior to the implant therapy to patient satisfaction after the implant therapy. The data of 158 patients with dental implant in Seoul, Gyeonggi-Do and Cheonan city was obtained. The results are as follows : 1. 40.5% of patients placed one implant and 36.1 % of patients answered that the average cost for each implant is from 1,500,000 to 2,000,000won. 23.4% of them answered they decided to have implant because no tooth preparation is required. 2. Overall, the expectation level for implant therapy in general properties, women showed higher level of expectation than men. Especially, 'Implant has a longer life than other denture' showed significant difference between women(4.29) and men(3.87). Expectation by age, 'Implant has similar color and shape' was found the highest in age 20(4.38). Satisfaction by general properties, 'No tooth preparation required' was found the highest in age 20(4.57) and was statistically significant(p<.002). 3. Comparing patients' expectation prior to implant therapy to satisfaction afterward, 'Implant prevents jawbone resorption and keeps facial appearance' showed 3.7 of expectation but satisfaction was found increased to 3.87(p=.020). No tooth preparation required' was found 3.95 in expectation prior to implant therapy but after therapy it was found 4.23 in satisfaction (p<.001). 4. Overall satisfaction in implant therapy was found 4.25, recommendation to other patients was found 4.18 and repurchase was found 4.17.

A Study on the Evaluation of Environmental Load Based on LCA Using BIM - Focused on the Case of NATM Tunnel - (BIM을 활용한 LCA기반 환경부하평가에 관한 연구 - NATM 터널 사례 중심으로 -)

  • Lee, Yang-Kyoo;Han, Jung-Geun;Kwon, Suk-Hyun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.3
    • /
    • pp.477-485
    • /
    • 2018
  • To control manage environmental load during construction work, it is required to ascertain an accurate quantity for materials those are using during the construction. In construction industrial nowadays, especially on design part, there are lots of mistakes occurred on quantity take-off between plan documents and actual work. That mistakes are caused by omission of design items, overcount because of interference each materials or simple calculate error. Besides, in case of a construction project, engineers are impossible to design perfectly due to a lot of invalid variable in a construction site. Thus, design errors and changes occur frequently in the process of construction work or design due to such unclear elements. And in case of LCA assessment based on 2D design, there is difficult for an engineer who is in charge to calculate the volume of materials manually using drawings and relevant specifications. This study is aimed for examining and verifying a high reliable method of evaluating environmental load which is useful in construction process through comparing LCA analysis. In addition, this study provides the method of calculating the volume of materials and LCA assessment in working on the basis of 2D design, using the specifications which is used for LCA evaluation, and possibility of utilizing the LCA assessment by introducing BIM design technic to improve the former problem through comparing and analyzing the previous method with 3D-based evaluation process.

Development of a Computer System and Suggestion of Man-Hours for Demolition Cost Estimation (해체공사비 산정을 위한 품산정 기준과 전산시스템의 개발)

  • Kim, Hyo Jin;Kang, Leen Seok;Lee, Dong Wook;Kim, Chang Hak
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.3
    • /
    • pp.1007-1015
    • /
    • 2014
  • The importance of construction waste reusing and recycling is becoming increasingly large because the demolition industry is in current trend to pursue for sustainable growth. As the considering situation of the domestic housing construction and existing house, a scale of demolition industry is expected to be increased continuously. But the related cost regulations that are used in tendering in the demolition industry are insufficient, also the computer system for estimating the demolition costs have not been developed yet. Therefore, in this study suggests man-hours of 21EA items which are utilized to estimate demolition cost and work rate of $1.0m^3$ breaker which is used mostly in domestic demolition industry after analyzing a case study for deconstruction works. The computer system is developed for the estimating demolition cost easily, which are including five modules such as a project information, a unit cost management, a standard unit cost table, a bill of quantity, and a reporting system. This computer system is possible to apply for estimating cost of both mechanical demolition and blasting demolition. The biggest advantage of this system is to estimate cost to utilize standard WBS which is linked with standard unit table and each DB. This can help unskilled users use easily for it.

A Study of Economic Aspects on 3-D Scanning Measurement during Tunnel Construction (3차원 스캔을 이용한 터널계측의 경제성에 관한 연구)

  • Choi, Won-Il;Park, Geun-Young;Cho, Kook-Hwan
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.10 no.2
    • /
    • pp.77-81
    • /
    • 2010
  • D&B(Drill & Blast) method in tunnel construction requires accurate and rapid measurement of the ground movement, which is essential for feedback analysis. Case study and adaptability of IT technique for tunnel survey are discussed in this paper. The application of laserscannig and existing light wave instrument method in the field of tunnel construction were reported in several advanced country including Austria and Japan. Survey for the shoulder movements by IT survey method was conducted at a subway construction site and the results were compared to the conventional method. Also, the economic aspects of laserscannig method were analyzed using measured data which were categorized by expenses, frequency, interval and period in the field of construction. Therefore IT survey solution may contribute to execute more economic and safe construction

Analysis on Characteristics of Defects before Inspection for Apartment Use (공동주택 사용검사 전 하자 특성 분석)

  • Lee, Sang-Hyo;Han, Man-Cheon;Kim, Jae-Jun;Lee, Jeong-Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.5
    • /
    • pp.167-178
    • /
    • 2020
  • The purpose of this paper is to establish a defect classification system for defects before inspection and to derive the pattern and characteristics of defects before inspection by examining about 3,110 defect items for 133 apartment buildings. The study analysis revealed a relatively high rate of defects before inspection that occurred in finishing work. Second, defects occurred such as cracking of external wall, which is a very important defect. However, defects before inspection were relatively rare on the external wall. Finally, defects before inspection occurred during waterproofing in the common area or garage. It is necessary to establish a reasonable basis or countermeasure to resolve differences between stakeholders as various issues may arise in the course of a dispute, as a result of identifying the details of defects within the top 20 of the defectives.

A Study on Simplified Payment Method by Progress Measurement for Specified Activity - Focusing on Construction of Eco-River (대표공종의 선정을 통한 약식 기성 산정 방법에 관한 연구 - 자연형 하천공사를 중심으로)

  • Lee, Jeong-Yoon;Woo, Sung-Kwon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.1
    • /
    • pp.160-169
    • /
    • 2010
  • In domestic public works, there are several problems in the measurement of payments based on the bill of quantity, which doesn't match with the activity progress rate, heavy paper works and complicated procedures. It can be classified formal and simplified method. By using the simplified method, it can be solved many problems by summarizing the procedure, but is not generally used. This paper proposes a payment method by progress measurement for specified activity based on WBS(Work Breakdown Structure) verifying efficiency which reduced cost account and advanced work on payment compare to method of domestic public works using the data about construction of eco-river. This method will be an important contribution on being a base for cost-schedule integrated management which were verified and also improving efficiency on measuring payment.