• Title/Summary/Keyword: 기대생애주기비용

Search Result 38, Processing Time 0.026 seconds

BIM-based Repair&Replacement (R&R) Cost Estimating Process (BIM기반 건축물 수선교체비 산정 프로세스)

  • Park, Jieun;Yu, Jungho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.31-38
    • /
    • 2016
  • In a construction project, the portion for maintenance costs for a building is considerable compared to the initial construction cost. As such, Life Cycle Cost (LCC) analysis is being increasingly utilized to assess the design value of engineering work in Korea. Additionally, the Public Procurement Service in Korea announced that it will be mandatory for all domestic construction projects to adopt BIM. Furthermore, the paradigm for architectural design has shifted from 2D to 3D, and to BIM, which includes a data management system. Within this background, however, there is currently no adequate BIM-based LCC analysis software and the requirements of cost estimation for repair and replacement cost for a building is not completely adequate in BIM tools such as Revit and Archicad. Therefore, this study suggests a process of cost estimation for repair and replacement (R&R) cost based on IFC data. First, we analyzed existing R&R criteria and defined BIM-based requirements when calculating R&R costs. These requirements were extracted from relevant IFC data. Subsequently, this was saved to a database and a BIM-based database was built for R&R cost estimation. Finally, this database was connected with external databases such as R&R Criteria DB and Cost Information DB to calculate R&R costs. This process is expected to improve upon the traditional process of cost estimation of R&R cost by applying a BIM model. The proposed process can contribute to a further standardizing of BIM-based LCC analysis thru application to initial construction costs, energy costs, and other maintenance costs.

Design Study of 3D printing Form Liner for Aesthetic and Protective Concrete Surfacing (콘크리트 미관창출과 열화저감을 위한 3D프린팅 폼라이너 디자인 연구)

  • Jang, Jungsik;Hwang, Ga Yeong;Youn, Mun Ku;Jang, Jin Wha;Cheon, Soo Gyeong
    • Design Convergence Study
    • /
    • v.16 no.1
    • /
    • pp.97-109
    • /
    • 2017
  • Interest in the exterior design of buildings has increased in recent years. Demand for various architectural structures is increasing. However, domestic form liner and design are still limited. Thus, this research uses 3D printers to omit the existing mold production process. Use digital data to produce products economically using various materials. It can be hoped that extending the lifespan of the concrete structure will reduce the cost of saving costs. The purpose of this study is to utilize the 3D printers to develop the design of a suitable formative shape for the purposes of the concrete. In this study, 3D printed form enables the possibility that the actual application is practical. Consideration for the artistic design of the art line was proposed for the purpose of considering the use of concrete structures for concrete structures.

asset management framework for low-carbon water distribution system (저탄소 상수도 관망을 위한 자산관리 체계 구축)

  • Kim, Beomjin;Lee, Jaeyeon;Lee, Seungyub
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.183-183
    • /
    • 2022
  • 최근 몇 년 동안 기후변화에 대응하기 위한 탄소중립 혹은 저탄소 운영의 중요성이 강조되어왔다. 상수도 관망은 직접적인 탄소 배출 시설물은 아니지만, 상수도 관망의 운영 그리고 구성요소의 제조부터 폐기까지의 전 생애주기 동안 막대한 양의 에너지를 사용하는데, 이러한 에너지의사용이 탄소 배출에 간접적인 영향을 주는 것으로 알려져 있다. 특히 수자원공사에 따르면, '17년 기준 수도사업 관련 전기 사용에 따른 간접 배출이 70만tCO2eq에 이르는 것으로 보고되고 있어, 에너지의 효율적인 운영 및 자산관리 체계의 필요성이 커지고 있는 실정이다. 상수도 관망의 에너지 효율에 영향을 주는 요인은 크게 구성요소의 노후와 누수로 구분할 수 있다. 본 연구에서는 상수도 관망 관로 별 노후와 누수 여부를 판단하여 교체 전략을 수립할 수 있는 자산관리 모형을 제안하고 관로별 에너지 효율을 시각화하여 전반적인 자산관리에 근거를 제시하고자 한다. 모형은 최적화 기법을 통한 관로별 기능적 노후도 산정 및 누수 탐지, 관만 내 누수 지역화, 에너지 효율 시각화 등 총 3개의 모듈로 구성되어 있다. 제안한 모형은 고도의 차이가 큰 국내 D시 가상 관망에 적용하였다. 해당 관망에 다양한 관로의 노후 및 누수 상황을 가정하여 가상의 데이터를 생성하고 이를 토대로 관로별 기능적 노후와 누수 조건을 고려하여 해당 모형을 검증한다. 또한, 노후와 누수에 따른 가상 상황별 관로의 자산관리 의사결정 예시를 제공하여 향후 모형의 활용에 대한 가이드 라인을 제시한다. 마지막으로 관망 내 설치된 감압밸브를 터빈으로 전환하여 관망 운영 단계에서 무의미하게 소산되는 열에너지를 회수하는 방안을 검증하였다. 최적화 기법을 통해 비용 대비 최적 터빈 설치 지역을 선정하였고 향후 터빈 설치에 고려해야 할 사항을 정리한다. 본 연구에서의 결과는 향후 종합적인 저탄소형 상수도 관망을 위한 초석을 제공할 것으로 기대한다.

  • PDF

A study on the feasibility assessment model of urban utility tunnel by analytic hierarchy process (계층의사분석 기법을 적용한 도심지 공동구 타당성 평가모델 연구)

  • Chung, Jee-Seung;Na, Gwi-Tae
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.1
    • /
    • pp.131-144
    • /
    • 2018
  • The urban center of a large city has a high concentration ratio of population, commerce, and traffic. Therefore, the expected effect is high from the introduction of the urban utility tunnel and it also has sufficient economic feasibility considering life cycle cost. Moreover, the construction cost can be greatly reduced if it is included in a large underground development such as a subway or a complex transfer center construction. However, it is not reflected in actual underground development plan. When planning a urban utility tunnel in Korea, it is expected to have difficulties such as the cost of relocation of the existing Life-Line, conflicts among the individual facility institutions, procurement of construction resources and sharing. Furthermore, it is possible to promote the project only if a consensus is drawn up by a collective council composed of all facilities and project developers. Therefore, an optimal alternative should be proposed using economic analysis and feasibility assessment system. In this study, the analytic hierarchy process (AHP) is performed considering the characteristics of urban areas and the importance of each indicator is quantified. As a result, we can support reasonable design capacity optimization using the feasibility assessment system.

Decision Support Process Model for Energy Efficient Remodeling Projects focused on Building Envelope and Renewable-energy Systems (에너지절감형 리모델링을 위한 적정 대안 선정 프로세스 모델 - 건축물 외피 및 신재생에너지 시스템을 중심으로 -)

  • Shin, Young-su;Cho, Kyuman;Kim, Jae-youn
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.3
    • /
    • pp.91-100
    • /
    • 2015
  • An increase in energy such as natural gas, coal, oil, has occurred to a large amounts of environment impact emissions, it is necessary to reduce in the construction industry for the energy consumption. To encourage remodeling project in developed countries of the majority, on the basis of this, remodeling project in the construction industry has grown to a large amount. Results of analysis of the research related to the advanced remodeling, analysis of the economic validity in accordance with the production and process and building elapsed years of selection alternative of remodeling there has been a problem that has not been properly reflected. In this study, a decision support model that can simultaneously choose the most cost-effective and energy-efficiency alternative. Developed process model, generates a "Remodeling Solution" that combines the renewable energy equipment and envelope system, energy performance evaluation of the application of international standards(ISO-13790, DIN V 18599), perform the economic evaluation through LCCA(Life Cycle Cost Analysis) technique, circulated evaluation and configured to output the optimal Remodeling Solution. The results of applying the model developed in the case, it was confirmed that it is possible to select a choice of cost-effective energy-saving alternative. Then, developed model through this study, it is expected to be able to help highly effective remodeling alternative to selecting by decision-makers.

Identification of Breakdown Structure for Infrastructure Maintenance, Repair, and Rehabilitation Technologies using Comparative Case Study (비교사례 연구를 통한 인프라 유지관리 기술 분류체계 도출)

  • Kim, Du Yon;Cha, Yongwoon;Park, Wonyoung;Park, Taeil
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.10
    • /
    • pp.248-258
    • /
    • 2020
  • This study proposed a breakdown structure for maintenance and management technologies under the concept of comprehensive asset management at the life cycle level of infrastructure based on benchmarking with other developed countries. For this purpose, a comparative case study was performed to review and analyze the existing definitions and hierarchies for infrastructure maintenance, repair, and rehabilitation (MR&R) systems under major industrialized countries and South Korea. In accordance with the ratio of maintenance costs to GDP, the U.S., U.K, and Japan were selected to review their systems. The classifications and definitions of MR&R technologies under the laws were analyzed. The result showed that most developed countries differentiate maintenance and repair from improvement and constitute a system centered on preventive maintenance activities. On the other hand, Korea's system for facility management is not definitely classified and still focused on reactive structures, which need to be improved. In this study, as proposed, a breakdown structure established the concept of Maintenance and Management, Maintenance & Repair, and Performance Improvement. Consequently, this study could be used as the basis for the implementation of preventive MR&R activities and reasonable resource allocations from an asset management point of view.

Development of Evaluation Factors for Breakwater Rehabilitation (방파제 성능개선을 위한 평가항목 개발)

  • Park, Su-Yeul;Yun, Won-Gun;Kang, Go-Une;Kim, Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.4
    • /
    • pp.67-74
    • /
    • 2021
  • Domestically, technical condition evaluation for breakwaters has been conducted through safety checks and safety diagnosis. If necessary, maintenance for the facility is conducted. However, in recent years, the need for infrastructure management has been increasing from a life-cycle-cost perspective. For these reasons, the "Sustainable Infrastructure Management Basic Act" was enacted. Previously, only the technical part of the breakwaters was evaluated. However, based on the act, comprehensive management of breakwaters will be possible through performance improvement by adding economic and political evaluations. In this study, evaluation factors and evaluation methods were developed for a breakwater rehabilitation project. The purpose of this study is to present a development direction, items, and methods for the evaluation of breakwater performance improvement to be applied in future practice. This study reviews the concept of maintenance and performance improvement, the literature related to performance improvement, and the project type for the common standard of performance improvement. Evaluation items and evaluation methods for breakwater rehabilitation are suggested to be reviewed by experts. The methodology suggested in this study could be used for preventive maintenance and to reduce accidents.

A Product Model Centered Integration Methodology for Design and Construction Information (프로덕트 모델 중심의 설계, 시공 정보 통합 방법론)

  • Lee Keun-Hyoung;Kim Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.99-106
    • /
    • 2002
  • Researches on integration of design and construction information from earlier era focused on the conceptual data models. Development and prevalent use of commercial database management system led many researchers to design database schemas for enlightening of relationship between non-graphic data items. Although these researches became the foundation fur the proceeding researches. they did not utilize the graphic data providable from CAD system which is already widely used. 4D CAD concept suggests a way of integrating graphic data with schedule data. Although this integration provided a new possibility for integration, there exists a limitation in data dependency on a specific application. This research suggests a new approach on integration for design and construction information, 'Product Model Centered Integration Methodology'. This methodology achieves integration by preliminary research on existing methodology using 4D CAD concept. and by development and application of new integration methodology, 'Product Model Centered Integration Methodology'. 'Design Component' can be converted into digital format by object based CAD system. 'Unified Object-based Graphic Modeling' shows how to model graphic product model using CAD system. Possibility of reusing design information in latter stage depends on the ways of creating CAD model, so modeling guidelines and specifications are suggested. Then prototype system for integration management, and exchange are presented, using 'Product Frameworker', and 'Product Database' which also supports multiple-viewpoints. 'Product Data Model' is designed, and main data workflows are represented using 'Activity Diagram', one of UML diagrams. These can be used for writing programming codes and developing prototype in order to automatically create activity items in actual schedule management system. Through validation processes, 'Product Model Centered Integration Methodology' is suggested as the new approach for integration of design and construction information.

  • PDF