• Title/Summary/Keyword: 기능 점수 모델

Search Result 73, Processing Time 0.02 seconds

Real Time SW Sizing Model for FP-Based Fintech Software Development Project (FP 기반의 핀테크 소프트웨어 개발 프로젝트 실시간 규모 산정 모델)

  • Koo, Kyung-Mo;Yoon, Byung-Un;Kim, Dong-Hyun
    • Journal of Convergence for Information Technology
    • /
    • v.11 no.10
    • /
    • pp.36-44
    • /
    • 2021
  • Estimation on SW Sizing applied to fintech is very difficult, a task requiring long time, it is difficult for client companies and developer companies to accurately calculate the size of software development. The size is generally estimated based on the experience of project managers and the general functional scoring method. In this paper, propose a model that can be applied to fintech development projects by quantitatively calculating the required functions from the user's point of view, measuring the scale, and calculating the scale in real time. Through the proposed model, the amount of work can be estimated prior to development and the size can be measured, and the M/M and the estimated quotation amount can be calculated based on the program list by each layer. In future studies, by securing size computation data on existing the Fintech Project in mass, research on accurate size computation would be required.

컴포넌트 기반의 개발 노력도 산정 모델

  • 김승렬;서정석
    • Proceedings of the Korea Database Society Conference
    • /
    • 2000.11a
    • /
    • pp.309-322
    • /
    • 2000
  • 컴포넌트 개발에 보편화 추세에 있어서 이에 따른 노력도 산정 모델의 개발이 시급하지만 아직까지 간편하게 사용할 수 있는 모델이 없는 것이 현실이다. 따라서 본 연구는 그에 대한 기반을 마련하기 위하여 컴포넌트 기반에 관련된 개발 노력도 산정 모델을 살펴보고자 한다 기존의 개발의 노력도 산정 모델로 주로 사용하고 있는 모델로는 COCOMO중심의 모델, 기능점수 중심의 모델, 그리고 상용 컴포넌트(COTS) 중심의 모델로 나누어 볼 수 있으며, 각각의 중심 모델을 비교하여 컴포넌트기반(CBD)에서 활용 가능한 모델들을 살펴보기로 한다.

  • PDF

An Improvement of Function Point Models for Software Cost Estimation (소프트웨어 비용산정을 위한 기능점수 모형 개선 연구)

  • Kim, Hyeon-Su
    • The Transactions of the Korea Information Processing Society
    • /
    • v.6 no.9
    • /
    • pp.2403-2413
    • /
    • 1999
  • There is a strong need to develop a software cost estimation model on economic value perspective. The objective of this research is to improve current software cost estimation method on economic value perspective. We reviewed domestic and foreign researches and practices on software cost estimation with function point method, and derived promising alternative models. Pilot simulation was performed with real project data, and the probable best model was chosen. We collected data from 39 Korean companies, and assesed statistical significance of the model with those data. Empirical data shows that more practical model has better prediction accuracy. That is, the number of input and output modules, the number of tables, and the number of algorithms are chosen to be best set of functions. There exists strong correlation between the calculated function points and project effort. And, the revised set of technical complexity factors and evaluation guidelines show practical usefulness. We suggest that the above result be incorporated in a new improved guideline for software cost estimation. By adopting the results of this research to the guideline, we expect that technology innovation will be expedited, and that overall productivity of software industry will be increased.

  • PDF

FP measurement using Evolutionary Search (진화탐색을 사용한 기능점수 예측)

  • 김미숙;권기태;강태원
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2003.04c
    • /
    • pp.49-51
    • /
    • 2003
  • 성공적인 소프트웨어 개발을 위해서는 프로젝트 계획 수립단계에서 정확한 예측 모델을 연구하는 것이 중요하다. 소프트웨어 개발의 중요성이 대두됨에 따라 현재에는 많은 기존의 프로젝트 데이터를 보관하게 되었다. 기존의 예측모델에서는 개발환경에 따라 서로 다른 형태의 모델을 만들어 개발비용을 예측하였다. 모델의 형태에 따른 신뢰도 또한 주요 이슈로 작용하였다. 이 논문에서는 이러한 많은 프로젝트 데이터와 현재 개발하고자 하는 프로젝트에 대하여 과거의 데이터 중 가장 유사한 최적의 프로젝트를 찾아내기 위해 FP(Function Point)를 이용하는 많은 프로젝트 데이터에 유전자 알고리즘을 적용하여 최적의 유사 모델을 찾아내는 방법에 대하여 제안하고자 한다.

  • PDF

무기체계의 체계적인 S/W 개발비용 산정 발전방안(3)

  • Kim, Hwa-Su
    • Defense and Technology
    • /
    • no.7 s.281
    • /
    • pp.38-49
    • /
    • 2002
  • 이번 호에서는 COCOMO 모델, 기능점수모델, PRICE-S 모델, 일반 COSDES 모델 등의 무기체계 S/W 개발비용 산정모델들을 조사 및 분석하여 제시 하였다. 다음에 계속되는 7, 8월호에서는 무기체계 S/W 개발 비용 산정에 영향을 미치는 요소인 스텝수 산정, 환경요인 보정계수, 제경비 및 기술료를 산정하는데 있어서 각각의 영향요소들을 식별하여 제시하고, 무기체계 S/W 개발비용 산정 개선방안 및 이에 대한 정책적인 발전방향을 제시하고자 한다.

  • PDF

A Software Estimating Model for Development Period (소프트웨어 개발기간 추정 모델)

  • 이상운
    • Journal of KIISE:Software and Applications
    • /
    • v.31 no.1
    • /
    • pp.20-28
    • /
    • 2004
  • Estimation of software project cost, effort, and duration in the early stage of software development cycle is a difficult and key problem in software engineering. Most of development effort and duration estimation models presented by regression model of simple relation function point vs. effort and effort vs. duration instead of considering developer's productivity. But different project have need for different effort according to developer's productivity if the projects are same software size. Also, different duration takes according to developer's productivity if the projects require the same effort. Therefore, models that take into account of productivity have a limited application in actual development project. This paper presents models that can be estimate the duration according to productivity in order to compensate a shortcoming of the previous models. Propose model that could presume development period by various methods based on productivity and compared models' performance. As a result of performance comparison, an estimating model of development period from software size got simple and most good result. The model gives decision-making information of development duration to project management in the early stage of software life cycle.

An Adjustment Method for the Group Difference in the National Enterance Examination (수능시험 집단간 실력차이 보정방법에 관한 연구)

  • 남보우
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2002.05a
    • /
    • pp.1085-1092
    • /
    • 2002
  • 수십만명의 대입응시자와 대학입학을 준비하는 수백만명의 초중고등학교 학생들에게 공정한 경쟁의 규칙과 측정방법을 마련하여 적응하는 것은 매우 중요하다. 현행 대학입학 수학능력 시험에서 각 영역별 표준점수는 응시계열인 인문계열, 자연계열, 예체능계열로 나누어 각 계열의 평균과 표준편차를 사용하여 계산한다. 따라서 동일한 점수도 어느 응시계열에 속하는가에 따라 표준점수가 달라지게 되며, 상이한 표준점수를 사용하여 대등한 경쟁을 하는 경우가 있어 불공정성이 제기된다. 비록 변환표준점수로 조정하여 계열간 불공정이 어느 정도 조정되지만, 자신의 점수에 비하여 집단의 평균점수가 낮을수록 변환표준점수가 증가하게 되므로 계열선택의 영향이 없다고 보기 어렵다. 이러한 결과로 유리한 계열로 대거 이동하는 현상이 나타나고 있다. 본 연구는 대학입학에 필수적인 대학입학 수학능력시험에서 계열간 실력차이를 보정하여 공정한 경쟁을 가능하게 하는 표준점수 계산방법을 제시하였다. 또한 모든 과목이 선택과목이 되는 2005학년도부터 시행될 수학능력시험에서 과목간 표준점수를 보정하는 방법을 제시하였다 본 연구는 결론을 도출하는데 있어 응시자들간 표준점수의 차이는 응시과목에 따라 달라지지 않는다는 과목의 동질성을 가정하였다. 응시과목의 동질성 가정하에서 집단간의 표준점수를 보정하는 방식은 동일한 시험문제로 각 집단이 시험을 보는 경우 집단간의 차이만큼을 표준점수에 합하여 보정하고, 각 집단이 고유하게 응시하는 시험과목은 공통과목의 차이만큼을 각 집단에 보정하여 주는 것이다. 과목간에 표준점수를 보정하는 방식은 해당과목에 응시한 응시자들이 다른 과목에서 획득한 표준점수의 평균치로보정하는 것이다.하기 위해서, 기업간 프로세스 협업(collaboration) 부분의 데이터 및 서식, 이를 취급하는 기능과 프로세스에 대란 분석을 통해 업무 프로세스 모델링 방법론과 관련한 모델링 지침 및 메타모델을 이용한 표준 업무 프로세스 모델을 개발하여 기업간 업무 프로세스 표준화에 대한 체계적인 관리에 대한 방안을 연구하고자 한다.의Bullwhip effect를 감소시킬 수 있는 장점이 있다. 동시에 이것은 향후 e-Business 시스템 구축을 위한 기본 인프라 역할을 수행할 수 있게 된다. 많았고 년도에 따른 변화는 보이지 않았다. 스키손상의 발생빈도는 초기에 비하여 점차 감소하는 경향을 보였으며, 손상의 특성도 부위별, 연령별로 다양한 변화를 나타내었다.해가능성을 가진 균이 상당수 검출되므로 원료의 수송, 김치의 제조 및 유통과정에서 병원균에 대한 오염방지에 유의하여야 할 것이다. 확인할 수 있었다. 이상의 결과에 의하면 고농도의 유기물이 함유된 음식물쓰레기는 Hybrid Anaerobic Reactor (HAR)를 이용하여 HRT 30일 정도에서 충분히 직접 혐기성처리가 가능하며, 이때 발생된 $CH_{4}$를 회수하여 이용하면 대체에너지원으로 활용 가치가 높은 것으로 판단된다./207), $99.2\%$(238/240), $98.5\%$(133/135) 및 $100\%$ (313)였다. 각각 두 개의 요골동맥과 우내흉동맥에서 부분협착이나 경쟁혈류가 관찰되었다. 결론: 동맥 도관만을 이용한 Off pump CABG를 시행하여 감염의 위험성을 증가시키지 않으면서 영구적인 신경학적 합병증을 일으

  • PDF

Improved Function Point Model for S/W Size Estimation (S/W 규모산정을 위한 개선된 FP모델)

  • Jo Eun-Sook;Kim Young-Gab
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2004.11a
    • /
    • pp.349-352
    • /
    • 2004
  • 성공적인 소프트웨어 프로젝트를 목표로 합리적인 계획을 수립하기 위하여 프로젝트의 전체 규모에 대한 신속하고 정확한 견적이 중요해지고 있다. IFPUG의 FPA 견적방식은 이미 검증되어 널리 사용되고 있으나, 복잡성과 모호성으로 인하여 실제 SI 업체의 견적 수행에는 어려움이 있으며 견적작업의 고비용을 초래하고 있다. 본 논문은 기존 FPA 방식의 문제점을 지적하고 이를 개선한 PFP 모델을 제시함으로써 기존보다 쉽고 효과적이며 효율적인 기능점수 견적을 가능하게 하였다.

  • PDF

Software Development Effort Estimation Using Partition of Project Delivery Rate Group (프로젝트 인도율 그룹 분할 방법을 이용한 소프트웨어 개발노력 추정)

  • Lee, Sang-Un;No, Myeong-Ok;Lee, Bu-Gwon
    • The KIPS Transactions:PartD
    • /
    • v.9D no.2
    • /
    • pp.259-266
    • /
    • 2002
  • The main issue in software development is the ability of software project effort and cost estimation in the early phase of software life cycle. The regression models for project effort and cost estimation are presented by function point that is a software sire. The data sets used to conduct previous studies are of ten small and not too recent. Applying these models to 789 project data developed from 1990 ; the models only explain fewer than 0.53 $R^2$(Coefficient of determination) of the data variation. Homogeneous group in accordance with project delivery rate (PDR) divides the data sets. Then this paper presents general effort estimation models using project delivery rate. The presented model has a random distribution of residuals and explains more than 0.93 $R^2$ of data variation in most of PDR ranges.

Software Development Effort Estimation Using Function Point (기능점수를 이용한 소프트웨어 개발노력 추정)

  • Lee, Sang-Un;Gang, Jeong-Ho;Park, Jung-Yang
    • The KIPS Transactions:PartD
    • /
    • v.9D no.4
    • /
    • pp.603-612
    • /
    • 2002
  • Area of software measurement in software engineering is active more than thirty years. There is a huge collection of researches but still no concrete software development effort and cost estimation model. If we want to measure the effort and cost of a software project, we need to estimate the size of the software. A number of software metrics are identified in the literature; the most frequently cited measures are LOC (line of code) and FPA (function point analysis). The FPA approach has features that overcome the major problems with using LOC as a measure of system size. This paper presents simple linear regression model that related software development effort to software size measured in FP. The model is derived from the plotting of the effort and FP relation. The experimental data are collected from 789 software development projects that were recently developed under the various development environments and development methods. Also, the model is compare with other regression analysis model. The presented model has the best estimation ability among the software effort estimation models.