Estimation on SW Sizing applied to fintech is very difficult, a task requiring long time, it is difficult for client companies and developer companies to accurately calculate the size of software development. The size is generally estimated based on the experience of project managers and the general functional scoring method. In this paper, propose a model that can be applied to fintech development projects by quantitatively calculating the required functions from the user's point of view, measuring the scale, and calculating the scale in real time. Through the proposed model, the amount of work can be estimated prior to development and the size can be measured, and the M/M and the estimated quotation amount can be calculated based on the program list by each layer. In future studies, by securing size computation data on existing the Fintech Project in mass, research on accurate size computation would be required.
Proceedings of the Korea Database Society Conference
/
2000.11a
/
pp.309-322
/
2000
컴포넌트 개발에 보편화 추세에 있어서 이에 따른 노력도 산정 모델의 개발이 시급하지만 아직까지 간편하게 사용할 수 있는 모델이 없는 것이 현실이다. 따라서 본 연구는 그에 대한 기반을 마련하기 위하여 컴포넌트 기반에 관련된 개발 노력도 산정 모델을 살펴보고자 한다 기존의 개발의 노력도 산정 모델로 주로 사용하고 있는 모델로는 COCOMO중심의 모델, 기능점수 중심의 모델, 그리고 상용 컴포넌트(COTS) 중심의 모델로 나누어 볼 수 있으며, 각각의 중심 모델을 비교하여 컴포넌트기반(CBD)에서 활용 가능한 모델들을 살펴보기로 한다.
The Transactions of the Korea Information Processing Society
/
v.6
no.9
/
pp.2403-2413
/
1999
There is a strong need to develop a software cost estimation model on economic value perspective. The objective of this research is to improve current software cost estimation method on economic value perspective. We reviewed domestic and foreign researches and practices on software cost estimation with function point method, and derived promising alternative models. Pilot simulation was performed with real project data, and the probable best model was chosen. We collected data from 39 Korean companies, and assesed statistical significance of the model with those data. Empirical data shows that more practical model has better prediction accuracy. That is, the number of input and output modules, the number of tables, and the number of algorithms are chosen to be best set of functions. There exists strong correlation between the calculated function points and project effort. And, the revised set of technical complexity factors and evaluation guidelines show practical usefulness. We suggest that the above result be incorporated in a new improved guideline for software cost estimation. By adopting the results of this research to the guideline, we expect that technology innovation will be expedited, and that overall productivity of software industry will be increased.
Proceedings of the Korean Information Science Society Conference
/
2003.04c
/
pp.49-51
/
2003
성공적인 소프트웨어 개발을 위해서는 프로젝트 계획 수립단계에서 정확한 예측 모델을 연구하는 것이 중요하다. 소프트웨어 개발의 중요성이 대두됨에 따라 현재에는 많은 기존의 프로젝트 데이터를 보관하게 되었다. 기존의 예측모델에서는 개발환경에 따라 서로 다른 형태의 모델을 만들어 개발비용을 예측하였다. 모델의 형태에 따른 신뢰도 또한 주요 이슈로 작용하였다. 이 논문에서는 이러한 많은 프로젝트 데이터와 현재 개발하고자 하는 프로젝트에 대하여 과거의 데이터 중 가장 유사한 최적의 프로젝트를 찾아내기 위해 FP(Function Point)를 이용하는 많은 프로젝트 데이터에 유전자 알고리즘을 적용하여 최적의 유사 모델을 찾아내는 방법에 대하여 제안하고자 한다.
이번 호에서는 COCOMO 모델, 기능점수모델, PRICE-S 모델, 일반 COSDES 모델 등의 무기체계 S/W 개발비용 산정모델들을 조사 및 분석하여 제시 하였다. 다음에 계속되는 7, 8월호에서는 무기체계 S/W 개발 비용 산정에 영향을 미치는 요소인 스텝수 산정, 환경요인 보정계수, 제경비 및 기술료를 산정하는데 있어서 각각의 영향요소들을 식별하여 제시하고, 무기체계 S/W 개발비용 산정 개선방안 및 이에 대한 정책적인 발전방향을 제시하고자 한다.
Estimation of software project cost, effort, and duration in the early stage of software development cycle is a difficult and key problem in software engineering. Most of development effort and duration estimation models presented by regression model of simple relation function point vs. effort and effort vs. duration instead of considering developer's productivity. But different project have need for different effort according to developer's productivity if the projects are same software size. Also, different duration takes according to developer's productivity if the projects require the same effort. Therefore, models that take into account of productivity have a limited application in actual development project. This paper presents models that can be estimate the duration according to productivity in order to compensate a shortcoming of the previous models. Propose model that could presume development period by various methods based on productivity and compared models' performance. As a result of performance comparison, an estimating model of development period from software size got simple and most good result. The model gives decision-making information of development duration to project management in the early stage of software life cycle.
Proceedings of the Korean Operations and Management Science Society Conference
/
2002.05a
/
pp.1085-1092
/
2002
수십만명의 대입응시자와 대학입학을 준비하는 수백만명의 초중고등학교 학생들에게 공정한 경쟁의 규칙과 측정방법을 마련하여 적응하는 것은 매우 중요하다. 현행 대학입학 수학능력 시험에서 각 영역별 표준점수는 응시계열인 인문계열, 자연계열, 예체능계열로 나누어 각 계열의 평균과 표준편차를 사용하여 계산한다. 따라서 동일한 점수도 어느 응시계열에 속하는가에 따라 표준점수가 달라지게 되며, 상이한 표준점수를 사용하여 대등한 경쟁을 하는 경우가 있어 불공정성이 제기된다. 비록 변환표준점수로 조정하여 계열간 불공정이 어느 정도 조정되지만, 자신의 점수에 비하여 집단의 평균점수가 낮을수록 변환표준점수가 증가하게 되므로 계열선택의 영향이 없다고 보기 어렵다. 이러한 결과로 유리한 계열로 대거 이동하는 현상이 나타나고 있다. 본 연구는 대학입학에 필수적인 대학입학 수학능력시험에서 계열간 실력차이를 보정하여 공정한 경쟁을 가능하게 하는 표준점수 계산방법을 제시하였다. 또한 모든 과목이 선택과목이 되는 2005학년도부터 시행될 수학능력시험에서 과목간 표준점수를 보정하는 방법을 제시하였다 본 연구는 결론을 도출하는데 있어 응시자들간 표준점수의 차이는 응시과목에 따라 달라지지 않는다는 과목의 동질성을 가정하였다. 응시과목의 동질성 가정하에서 집단간의 표준점수를 보정하는 방식은 동일한 시험문제로 각 집단이 시험을 보는 경우 집단간의 차이만큼을 표준점수에 합하여 보정하고, 각 집단이 고유하게 응시하는 시험과목은 공통과목의 차이만큼을 각 집단에 보정하여 주는 것이다. 과목간에 표준점수를 보정하는 방식은 해당과목에 응시한 응시자들이 다른 과목에서 획득한 표준점수의 평균치로보정하는 것이다.하기 위해서, 기업간 프로세스 협업(collaboration) 부분의 데이터 및 서식, 이를 취급하는 기능과 프로세스에 대란 분석을 통해 업무 프로세스 모델링 방법론과 관련한 모델링 지침 및 메타모델을 이용한 표준 업무 프로세스 모델을 개발하여 기업간 업무 프로세스 표준화에 대한 체계적인 관리에 대한 방안을 연구하고자 한다.의Bullwhip effect를 감소시킬 수 있는 장점이 있다. 동시에 이것은 향후 e-Business 시스템 구축을 위한 기본 인프라 역할을 수행할 수 있게 된다. 많았고 년도에 따른 변화는 보이지 않았다. 스키손상의 발생빈도는 초기에 비하여 점차 감소하는 경향을 보였으며, 손상의 특성도 부위별, 연령별로 다양한 변화를 나타내었다.해가능성을 가진 균이 상당수 검출되므로 원료의 수송, 김치의 제조 및 유통과정에서 병원균에 대한 오염방지에 유의하여야 할 것이다. 확인할 수 있었다. 이상의 결과에 의하면 고농도의 유기물이 함유된 음식물쓰레기는 Hybrid Anaerobic Reactor (HAR)를 이용하여 HRT 30일 정도에서 충분히 직접 혐기성처리가 가능하며, 이때 발생된 $CH_{4}$를 회수하여 이용하면 대체에너지원으로 활용 가치가 높은 것으로 판단된다./207), $99.2\%$(238/240), $98.5\%$(133/135) 및 $100\%$ (313)였다. 각각 두 개의 요골동맥과 우내흉동맥에서 부분협착이나 경쟁혈류가 관찰되었다. 결론: 동맥 도관만을 이용한 Off pump CABG를 시행하여 감염의 위험성을 증가시키지 않으면서 영구적인 신경학적 합병증을 일으
Proceedings of the Korea Information Processing Society Conference
/
2004.11a
/
pp.349-352
/
2004
성공적인 소프트웨어 프로젝트를 목표로 합리적인 계획을 수립하기 위하여 프로젝트의 전체 규모에 대한 신속하고 정확한 견적이 중요해지고 있다. IFPUG의 FPA 견적방식은 이미 검증되어 널리 사용되고 있으나, 복잡성과 모호성으로 인하여 실제 SI 업체의 견적 수행에는 어려움이 있으며 견적작업의 고비용을 초래하고 있다. 본 논문은 기존 FPA 방식의 문제점을 지적하고 이를 개선한 PFP 모델을 제시함으로써 기존보다 쉽고 효과적이며 효율적인 기능점수 견적을 가능하게 하였다.
The main issue in software development is the ability of software project effort and cost estimation in the early phase of software life cycle. The regression models for project effort and cost estimation are presented by function point that is a software sire. The data sets used to conduct previous studies are of ten small and not too recent. Applying these models to 789 project data developed from 1990 ; the models only explain fewer than 0.53 $R^2$(Coefficient of determination) of the data variation. Homogeneous group in accordance with project delivery rate (PDR) divides the data sets. Then this paper presents general effort estimation models using project delivery rate. The presented model has a random distribution of residuals and explains more than 0.93 $R^2$ of data variation in most of PDR ranges.
Area of software measurement in software engineering is active more than thirty years. There is a huge collection of researches but still no concrete software development effort and cost estimation model. If we want to measure the effort and cost of a software project, we need to estimate the size of the software. A number of software metrics are identified in the literature; the most frequently cited measures are LOC (line of code) and FPA (function point analysis). The FPA approach has features that overcome the major problems with using LOC as a measure of system size. This paper presents simple linear regression model that related software development effort to software size measured in FP. The model is derived from the plotting of the effort and FP relation. The experimental data are collected from 789 software development projects that were recently developed under the various development environments and development methods. Also, the model is compare with other regression analysis model. The presented model has the best estimation ability among the software effort estimation models.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.