• Title/Summary/Keyword: 기능인력관리

Search Result 305, Processing Time 0.032 seconds

Problem Analysis and Improvement for Technicians Operation in Specialized Construction Firms by machinery&equipment services (기계설비 전문건설업에서의 기능인력 운영상의 문제점 분석 및 개선방안에 관한 연구)

  • Kim, Yun-Su;Bae, Sung-Ryul;Kim, Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.455-458
    • /
    • 2008
  • The purpose of this study is to analyze technical manpower management problems that were made by specialized construction company, centering on the field of machinery and equipments, to offer an improvement of technical manpower management. For this study, the adapted research method select owners&foremans on 18 specialized construction company by machinery&equipment services and on-site supervisors on general contractor and then investigate the problem of contract and subcontract by survey. After analyzing the actual state of management, it present an improvement of technical manpower management. The results of this research are as follows. 1) It is analyzed foreman had a number of difficulty for dealing manpower management because of subordinate relationship between supervisor and foreman. 2) The improvement of technical manpower management is concluded that foreman is to be on- site proxy supervisor or to be hired by an annual salary.

  • PDF

Current Status and Improvement Plan for Foreign Construction Laborer (외국인 건설 근로자 현황 및 개선방안)

  • Park, Hee-Sung
    • The Journal of the Korea Contents Association
    • /
    • v.15 no.9
    • /
    • pp.555-561
    • /
    • 2015
  • The construction industry is a labor-oriented and quality, cost, and schedule performance is effected by technicians. However, the construction industry have faced a labor shortage problem. Therefore, technician graying and no new workers inflow cause labor shortage and decline of worker's skill level. The utilization of foreign technicians instead of domestic technicians has been increased in the construction industry. This paper performed questionnaire survey for 43 managers on 14 project fields to determine the current status and problems of construction technicians and to propose a improvement plan. As a result, most foreign technicians are carpenters and iron workers, but the skill levels are generally lower than domestics. The major problems for foreign technicians are communication and non-skilled. Then, labor productivity and accident rates of foreign technicians are higher than domestics. This paper proposes that skill training programs, language lessons, and multi-cultural programs are effective to improve foreign workers' problems.

Improvement of Education and Promotion System for Construction Skilled Labor (건설기능인력 교육체계 및 직급체계 개선방안)

  • Lee, Chul-Seung;Chae, Dae-Young;Yoo, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.1043-1048
    • /
    • 2007
  • 사업의 지속적인 성장을 위해서, 생상성의 향상은 필수적인 요소이다. 건설업은 노동집약적인 산업이고 그래서 건설기능인력은 생산성에 영향을 미치는 가장 중요한 요인이다. 그러나 매해 건설기능인력은 감소하고 있는 추세이다. 따라서 이러한 문제는 반드시 교육체계와 직급체계의 제안을 통해 관리되어져야 한다. 이 연구의 목적은 기존의 문헌고찰을 통하여 현재의 교육체계와 직급체계의 연관된 문제를 찾아내고 이러한 문제를 해결하기 위하여 교육체계와 직급체계를 제안하는데 목적이 있다. 또 이러한 교육체계와 직급체계의 타당성 검증을 위하여 건설 기능 인력의 설문조사와 건설 실무자의 면담, 조사를 통하여 타당성을 도출해낸다. 좀 더 세부적인 사항이나 결론은 아래의 글에서 알아보기로 한다.

  • PDF

An Empirical Analysis on the Working Conditions of Construction Technician (건설 기능인력 근무여건에 대한 실증 분석)

  • Yang, Jinkook;Lee, Taeshin;Lee, Jongmin;Lee, Sangbeom
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.1
    • /
    • pp.14-21
    • /
    • 2019
  • The construction phase of the construction project needs a large scale of manpower, materials and equipment. Among them, manpower is a core part for project construction. These manpower are divided into two groups. The first is the management group that manages the construction, and the second is the site technician manpower for construction work. Recently, construction company has suffering due to the insufficient supply of technician labor. Accordingly, this study will perform an empirical analysis about the construction technician. To do this, we surveyed related research trends and conducted surveys on the satisfaction of the construction technician. The result, satisfaction with pay and insurance was relatively low compared to other items. Therefore, this study were conducted in-depth interviews with technician managers in order to analyze the cause. In addition, case analysis was conducted to analyze actual working conditions. As a result, it was analyzed that the wage level and insurance system of construction technician were considerably stable compared to the manufacturing industry. The result of this study is expected to contribute to the activation of excellent technician cultivation through the change of recognition about construction technician.

Store Management App Design Through Efficient Manpower Management (효율적인 인력 관리를 통한 매장관리앱 설계)

  • Eun-Gyeon Jang;Ryeon-Na Lee;Tae-Ha Park;Ji-Eun Kim;Ji-Su An
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2023.07a
    • /
    • pp.459-460
    • /
    • 2023
  • 본 연구는 매장의 인력을 효율적으로 관리할 수 있는 기능을 제공한다. 매장 운영시 매장 직원의 갑작스런 결근으로 업무의 공백이 발생할 수 있다. 이러한 결근으로 인해 매장이 정상적으로 인력을 보충하지 못하여 발생하는 문제로 인해 업장 운영에 큰 차질을 가질 수 있다. 이러한 문제를 해결하고자 본 연구에서는 결근으로 인한 업무의 공백을 미연에 방지하기 위한 기능을 제공한다. 본 연구는 매장 관리를 위해 필요한 실시간 채팅, 캘린더, 인수인계와 같은 다른 애플리케이션들의 기능을 하나의 애플리케이션에서 처리하고, 대타 및 보충 인력을 사전에 또는 긴급으로 보충할 수 있도록 하였다.

  • PDF

A Proposal for Development of the Certification and Level System of Construction Craft Workers (건설기능인력 자격 및 직급체계 구축방안 제안)

  • Kim, Bong-Ju;Jung, Myung-Ho;Hyun, Chang-Taek;Koo, Kyo-Jin;Moon, Hyun-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.105-114
    • /
    • 2006
  • The construction craft workers have been getting older and have become drained, in spite of the vital factor that it directly affects productivity and quality as a final producer. This situation in the construction industry is ultimately due to evasion of performances by young craft workers. Therefore, the aim of this study is to propose the certification and level system of construction craft workers and to extract young craft workers from the market for construction craft workers so as to supply and demand high quality of craft workers. First of all, the present status and problems of the domestic construction craft workers are considered in this study. Furthermore, the appropriate way to establish its certification and level system is suggested from the Interview with experts, as well as references of German and Australian case. The revitalization of certification and level system provided in this study is expected to ensure that the craft workers are not simple laborers, but are required the professional knowledge and skill. Besides, it will lead to strengthen specificity and to break from aging, by taking young and qualified craft workers into the construction industry. Also, it will promote an employment stability by connecting the social security system.

Using Next Generation Technologies to Resolve Construction Labor Shortage Problems (건설기능인력 수급 불균형 문제 해결의 대안 제시)

  • Lee, Bok-Nam;Woo, Sungkwon;Chang, Chul-Ki;Koo, Bon-Sang
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.6D
    • /
    • pp.969-974
    • /
    • 2006
  • Labor shortages are a serious problem for Korea's construction industry. The problem is both quantitative and qualitative. There is a shortage in supply as due to a decrease in the influx of new labor, and existing workers are less productive as they age. The problem will only get worse as more and more major public projects are being planned. Options for increasing the labor supply are somewhat limited, and thus efforts need to be made to adopt new technologies that can improve the productivity and efficiency of field work and their processes. This paper introduces seven innovation technologies that have the best potential to increase productivity and thus reduce the burden of labor shortage problems. These include 1) Substitution by use of robotics and automation, 2) development and applications of Innovative materials to reduce on site field work, 3) increase in productivity through the implementation of Information Technology, 4) improved productivity through the application of modules, and prefabrication, 5) prevention of rework and redesign, 6) diversification of labor by integrating labor skills, and 7) improved productivity by standardizing site processes.

초대석-한국산업인력관리공단 이사장 이동훈

  • Jo, Gap-Jun
    • 프린팅코리아
    • /
    • s.35
    • /
    • pp.54-59
    • /
    • 2005
  • 기능인력 양성과 국가기술자격 검정사업, 취업정보 제공 등을 주요 업무로 하고 있는 한국산업인력관리공단이 올 들어 '전 국민의 평생학습화'라는 구호를 내걸고 인력양성에 발벗고 나섰다. 특히 인쇄출판 분야를 비롯한 업종별 표준화 사업을 추진하고 있고 직업전문학교에 인쇄과 설치를 검토하는 등 인쇄업계의 발전에 적극적이다. 이동훈 이사장은 "인쇄문화는 인류의 소중한 자산이며 앞으로도 잘 가꾸고 발전시켜야 할 가치가 있는 분야"라고 말한다.

  • PDF

Remote Controller Design Using Telephone (전화기를 이용한 원격제어기 설계)

  • Lim, Seog-Ku
    • Proceedings of the KAIS Fall Conference
    • /
    • 2006.05a
    • /
    • pp.446-448
    • /
    • 2006
  • 근래에 이르러 시설농가, 농수산물 건조기, 저온 저장고, 양어장, 보일러, 심야전기기계장치 등의 사용이 증가하였지만 이를 관리하기 위한 인력은 항시 관련 장비의 근거리에 위치하였다. 그러나 관련 장비를 관리하기 위한 인력이 원거리에 있는 경우 장비의 이상 유무를 수시로 확인 할 수 없어서 장비의 고장이 발생하여도 적절한 조치를 취하지 못하여 커다란 손실을 입는다. 이러한 관점에서 장비에 이상이 발생하였을 때 이를 감지하여 원거리에 있는 관리자의 전화기에 자동 연결하여 녹음된 음성 메시지를 신속히 알려 적절히 대처할 수 있는 제어기 개발에 대한 연구를 수행하였다. 본 논문에서는 농업용 온실 및 기계장치에서 이상 발생 시 휴대전화를 이용하여 사용자에게 음성으로 자동 통보하는 시스템을 개발하여 시스템은 미리 지정된 전화번호로 통보를 하여 사용자가 정상적으로 인지하였는가를 인식할 수 있는 기능을 갖고 있다. 또한 미리 저장된 여러 개의 전화번호를 시스템에서 직접 Dialing 해주는 기능을 갖고 있으며, 음성합성 기능을 적용하여 온도와 이상 상태들을 음성으로 통보해 주는 기능도 갖고 있다. 또한 사용자가 원격지에서 전화를 이용하여 원격제어를 할 수 있는 기능도 갖추고 있으며, 이를 확인할 수 있는 기능을 갖는 시스템을 개발하였다.

  • PDF

Development of Metric-Based Two-Tier Work Force Strategy (성과극대화를 위한 기능인력의 육성 및 활용전략)

  • Chang Soon-Woong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.73-81
    • /
    • 2003
  • The construction industry has been experiencing a major challenge in its work force, 'the shortage of skilled craft workers.' This problem has been caused by several factors such as the poor image of the construction industry, lack of training and education, unclear career path, declining wages, and changing work force demographics. A 'step-change' approach called the 'Two-Tier Work Force Strategy' has been proposed by the Center for Construction Industry Studies (CCIS) to deal with the work force related issues in a radical way. It is composed of two separate strategies, Tier I and II. The Tier I strategy uses less skilled and task trained craft workers, and has a larger administrative site management team than the Tier II strategy. The Tier II strategy utilizes fewer, better-educated, and higher skilled workers who perform some lower-management functions in addition to craft functions. They are paid more, but produce more through higher skills, stay on the job longer through multi-skilling, and deliver improved project performance in safety, quality, schedule, and cost The Two-Tier Work Force Strategy has the potential to resolve the current work force problems and foster a better work force environment in the future.

  • PDF