• Title/Summary/Keyword: 급곡구간 굴착

Search Result 1, Processing Time 0.014 seconds

Development of shield-TBM scale model system for excavation of curved section (급곡구간 굴착을 위한 쉴드-TBM 축소모형 장비 시스템 개발)

  • Kong, Min-Teak;Kim, Yeon-Deok;Lee, Kyung-Heon;Hwang, Beoung-Hyeon;An, Jun-Kyu;Kim, Sang-Hwan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.6
    • /
    • pp.849-860
    • /
    • 2019
  • This paper is a study on the development of equipment system to obtain data on stability in excavation of sharp curve section of Shield TBM. Shield TBM equipment is being used a lot recently for tunnel excavation. Excavation may result in inevitable detours by buildings above the ground or existing underground structures. Preconstruction simulation is required to verify the stability of the construction in case of this. Therefore, it is necessary to establish an automated control system through the development of this equipment system and conduct simulation through simulation of excavation model in the sharp curve section. A system shall be developed to control the left and right angles and thrust of the equipment, and to view data on the earth pressure and propulsion pressure of the equipment in real time during excavation. With this system, the necessary data can be collected for field testing through excavation method and excavation simulation by angle. It is expected that it will be very useful in assessing the actual Shield TBM by conducting a scale-down model experiment.