Experimental evaluation of the effects of cutting ring shape on cutter acting forces in a hard rock (커터 링의 형상에 따른 디스크커터 작용력의 실험적 평가)

  • Chang, Soo-Ho;Choi, Soon-Wook;Park, Young-Taek;Lee, Gyu-Phil;Bae, Gyu-Jin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.15 no.3
    • /
    • pp.225-235
    • /
    • 2013
  • Cutter forces acting on a disc cutter in TBM are the key parameters for TBM design and its performance prediction. This study aimed to experimentally evaluate cutter forces with different ring shapes in a hard rock. The stiffness of a cutter ring was indirectly estimated from a series of full-scale linear cutting tests. From the experiments, it was verified that the rolling stress acting on a V-shape disc cutter was much higher than on a CCS disc cutter even though the penetration depth by a V-shape disc cutter could be increased in the same cutting condition. Finally, it is suggested that a prediction model considering the shape parameters of a disc cutter should be used for its better prediction.

Development of a System Predicting Maximum Displacements of Earth Retaining Walls at Various Excavation Stages Using Artificial Neural Network (인공신경망을 이용한 굴착단계별 흙막이벽체의 최대변위 예측시스템 개발)

  • 김홍택;박성원;권영호;김진홍
    • Journal of the Korean Geotechnical Society
    • /
    • v.16 no.1
    • /
    • pp.83-97
    • /
    • 2000
  • In the present study, artificial neural network based on the multi-layer perceptron is used and an optimum model is chosen through the process of efficiency evaluation in order to develop a system predicting maximum displacements of the earth retaining walls at various excavation stages. By analyzing the measured field data collected at various urban excavation sites in Korea, factors influencing on the behaviors of the excavation wall are examined. Among the measured data collected, reliable data are further selected on the basis of the performance ratio and are used as a data base. Data-based measurements are also utilized for both teaming and verifying the artificial neural network model. The learning is carried out by using the back-propagation algorithm based on the steepest descent method. Finally, to verify a validity of the formulated artificial neural network system, both the magnitude and the occurring position of the maximum horizontal displacement are predicted and compared with measured data at real excavation sites not included in the teaming process.

  • PDF

Evaluation of Train Running Safety During Construction of Temporary Bridge on Existing Railway (기존선에서 가설교량 시공에 따른 열차의 주행안전성 평가)

  • Eum, Ki-Young;Bae, Jae-Hyoung;Choi, Chan-Yong
    • Journal of the Korean Society for Railway
    • /
    • v.14 no.3
    • /
    • pp.234-239
    • /
    • 2011
  • Installing the temporary bridge after excavating the railway requires installing movable cross beam, but as it doesn't requires isolating the catenary or cutting the rail, it's applicable to double-track with frequent operation. In this study, a displacement meter was placed on temporary bridge to monitor the displacement pattern in curve section (R400) completed using temporary bridge method, and wheel load, lateral pressure and derailment coefficient were measured to evaluate the load imposed on track and the stability in curve section (R400) for quantitative evaluation of training running safety. As a result of the measurement, when trains passing over a temporary bridge, the maximum value of Wheel load and Lateral Force is analyzed as the 51% and 81% of standard level according to foreign country's performance tests, There is no trouble with stability analysis in Wheel load and Lateral Force occurring. Additionally, Wheel load and Lateral Force considered as the safety standard are tested 49% of limiting value regardless of trains, which the norm value quite well, there is no problem with train running.

A Comparison of Operation Time between the Standard of Estimate and Actual Operations in Tunnel Blasting (터널발파시 실제 작업시간과 품셈의 비교 분석)

  • Kim, Yang-Kyun;Kim, Hyung-Mok
    • Explosives and Blasting
    • /
    • v.33 no.3
    • /
    • pp.14-20
    • /
    • 2015
  • Tunnel blasting that plays the most important role in the construction of a drill & blast tunnel, shows a big difference in operation time according to various factors such as rock mass quality, tunnel dimension, machine performance, and the skill level of tunnel crews. This paper analyzes the differences between the time calculated by the standard of estimate and actual operation time based upon field investigations on blasting operation time in three tunnels of Korea. The result shows that actual blasting time is generally about 8%~16% less than the standard of estimate in cases that normal operations are performed. If the time delayed by unforeseen situations is included, however, it is presumed that the number of cases that actual operation time exceeds the standard of estimate are considerable. This study aims to help make a judgement over the appropriacy of the standard of estimate through continuous investigations on actual operation time, as well as improve the productivity of tunnel excavation.

A Study on the Lattice Girder by Increasing Contacting Area between Spider and Rod (스파이더와 강봉간 접촉면적을 증가시킨 격자지보재에 대한 연구)

  • Nam, Joong-Woo;Kim, Jin-Kyo;Cho, Yong-Gyo;Chun, Byung-Sik
    • Journal of the Korean Geotechnical Society
    • /
    • v.28 no.10
    • /
    • pp.17-25
    • /
    • 2012
  • Shotcrete, rockbolt, and steel rib are installed to support ground after tunnel was excavated. These are important supports for NATM applied tunnels. Recently, lattice girder is increasingly used because it is easily installed. In this study, we developed a new lattice girder by increasing contacting area between spider and rod. To verify the effect of the new lattice girder, the 3-point and 4-point flexural strength tests were carried out for LG-$50{\times}20{\times}30$, LG-$70{\times}20{\times}30$, LG-$95{\times}22{\times}32$. As a result, in case of contacting area, strength of new SGS lattice girder is 17.95% higher than that of original lattice girder. In case of weakness point, strength of new SGS lattice girder is 19.37% higher than that of original lattice girder.

Assessment of Lifeline Construction Technology for Buried Alive in Building Collapse (도심지 붕괴사고에 따른 매몰지역 생명선 시공기술 평가)

  • Ryu, Byung-Hyun;Kang, Jae-Mo;Lee, Jangguen;Kim, Young-Sam;Joo, Rak-Bong
    • Journal of the Korean GEO-environmental Society
    • /
    • v.17 no.9
    • /
    • pp.47-52
    • /
    • 2016
  • Unusual extreme weather events, which exceed a safe design capacity of the infrastructure, increase the frequency of natural disasters and has also been enlarged damage scale. Aging buildings and rapid urban progress act as weighting factors for the new composite disasters. Technological advances support detecting pre-disaster risk, real-time data analysis, and rapid response to the disaster site, but it is insufficient that emergency relief for buried alive must take advantage of the proven technologies through field tests. This study aims to evaluate directional drilling performance through underground soils and the reinforced concrete structure for primary lifeline installation in order to quickly provide relief supplies for buried alive when urban structures collapse.

A Earth-Volume Estimate Model by System Dynamics (시스템 다이내믹스를 활용한 토공량 산정 모형 구축)

  • Hwang, Young-Jo;Won, Seo-Kyung;Han, Choong-Hee;Kim, Sun-Kuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.467-470
    • /
    • 2006
  • The earth volume which is the basis of all the construction has gone through great development so far with the use of construction machine; however, systematic studies on the related area is in need since the appropriate compound engineering method of earth volume equipments which is a key factor for shortening the project duration and cost reduction is not systematically established and it is dependent on experience. Reasonable mechanical earth volume should take into consideration of performance and characteristics of the equipment, the kind of project, scale and conditions in advance. Also, the optimum compound engineering should be planned by selecting several available scales of equipment. In this study, the earth volume estimate model is established for optimum compound engineering of earth volume equipment for mechanized earth volume equipment loading and moving stage among many stages of earth volume task using system dynamics technique. The optimum compound engineering model of the earth volume equipment produced as a result of this is expected to make reasonable decisions in the shortest time in selecting earth volume facility.

  • PDF

The Strength and Environmental Friendly Characteristics of Non-chemical Accelerating Shotcrete (비약액계 급결성 숏크리트재의 강도특성과 친환경성)

  • Chun, Byungsik;Park, Dukhyum;Kang, Hyoungnam;Do, Jongnam
    • Journal of the Korean GEO-environmental Society
    • /
    • v.9 no.5
    • /
    • pp.29-36
    • /
    • 2008
  • The shotcrete is a NATM technique as a major tunnel support for ground stability after tunnel excavation. Instead of a general concrete lining method, it is a trend for curtail of construction periods and reduction of construction expenses that required to use of the permanent shotcrete lining. This high-strength shotcrete is required to use as a permanent shotcrete lining. This brought out the solution of environmental pollution and harmfulness to human. Accordingly, in this study specimens for strength measurement were made to develop shotcrete possible to develop materials in early with cement mineral accelerator as NATM method construction. It was compared with existing shotcrete material, unconfined compression test, flexural strength test, antiwashout underwater test were experimented. The fish poison test was experimented to evaluate an influence of environment. As a results of the test, unconfined compressive strength and flexural strength were equivalent with 28-curing day strength of existing material. An antiwashout of research subject material was revealed excellently in antiwashout Underwater test. As a results of the fish poison, an evaluation research subject material was founded more environmentally friendly than existing shotcrete.

  • PDF

Numerical Study of Face Plate-Type EPB Shield TBM by Discrete Element Method (개별요소법을 활용한 면판형 토압식 쉴드TBM의 수치해석 연구)

  • Lee, Chulho;Chang, Soo-Ho;Choi, Soon-Wook;Park, Byungkwan;Kang, Tae-Ho;Sim, Jung Kil
    • Journal of the Korean Geosynthetics Society
    • /
    • v.16 no.4
    • /
    • pp.163-176
    • /
    • 2017
  • The Discrete Element Method (DEM) has been widely used in civil engineering as well as various industrial fields to simulate granular materials. In this study, DEM was adopted to predict the performance of the face plate-type earth pressure balance (EPB) shield TBM (Tunnel Boring Machine). An analysis of the TBM excavation performance was conducted according to two pre-defined excavation conditions with the different rotation speeds per minute (RPM) of the cutterhead. The TBM model which was used in this study has a 6.64 m of diameter and six spokes. Also, 37 precutters and 98 scrapers at an each spoke were modeled with a real-scale specification. From the analysis, compressive forces at the cutterhead face, shield and cutting tools, resistant torques at the cutterhead face, muck discharge rate and accumulated muck discharge by the screw auger were measured and compared.

Development of construction method for underground buildings with MSRC diaphram wall and study on flexural performance of MSRC diaphram wall (강재주열벽을 적용한 지하건축물 가설공법의 개발 및 강재주열벽의 휨성능 연구)

  • Chung, Jee-Seung;Na, Gwi-Tae
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.6
    • /
    • pp.937-957
    • /
    • 2017
  • Urban roads are not only congested with vehicles and pedestrians, but also have many pipelines buried to provide convenience for inhabitants. In addition, urban inhabitants live comfortably in buildings adjacent to the road for residence, business, commerce, rest and so on. Therefore, despite the high cost of land, urban underground buildings with high land use efficiency are constantly being built. Recently, the construction of underground buildings has caused social problems such as the collapse of surrounding roads and adjacent buildings. Institutional improvement is being actively carried out to improve this. In this study, a new type of MSRC diaphragm wall was developed and a study on the construction method of underground building was carried out. It is intended to secure the underground excavation safety of underground buildings in urban areas and effectively prevent land subsidence complaints. Also, a reasonable design method of MSRC diaphragm walls using the ultimate strength design method is presented through the flexural performance Experiment.