• Title/Summary/Keyword: 굴착장비

Search Result 170, Processing Time 0.025 seconds

In-Situ Evaluation Technique for Hydraulic Conductivity in Excavation Disturbed Zone (EDZ) (굴착영향영역(EDZ) 투수특성의 실험적 평가기술)

  • Kim, Hyung-Mok;Ryu, Dong-Woo;Synn, Joong-Ho
    • Tunnel and Underground Space
    • /
    • v.18 no.2
    • /
    • pp.91-97
    • /
    • 2008
  • In this paper, in-situ technique for measuring hydraulic conductivity of Excavation Disturbed Zone (EDZ) in a direct way and its application to an Underground Research Laboratory (URL) site were introduced. It was understood that both the EDZ oriented test equipment as a hardware and analysis/evaluation technique as a software should be integrated for upgrading a quality of estimated EDZ hydraulic conductivity. The well-estimated EDZ hydraulic conductivity is expected to enhance a reliability of stability evaluation for caverns under groundwater table and design of a waterproof or drainage system as well as a grout system.

A Study on Notch Bit System for Controlling Blast Vibration and Over-break in Rock Mass (발파공해 해소 및 여굴 최소화를 위한 선균열 암굴착 노치장비 개발에 관한 연구)

  • Jeong, Dong-Ho;Moon, Sang-Jo;An, Dae-Jin;Jeong, Won-Joon;Kim, Eun-Kwan;Kim, Dong-Gyou
    • Tunnel and Underground Space
    • /
    • v.17 no.3 s.68
    • /
    • pp.216-224
    • /
    • 2007
  • Blasting, using shock and dynamic energy of explosive, is very effective tunnel excavation method. But it had serious problem which is the blast vibration and over-break. In recent study, pre-cracked excavation method using notch hole reduced blast vibration and over-break in tunnel, so we performed study about developing notch bit system for making notch hole. In order to make notch hole effectively we had perform drilling experiments changing length and height of notch and in order to improve speed and precision of drilling we had developed notch bit system which consists of drilling bit, notch bit, adapter and notch guide.

Development of Mucking Process Simulation Model for Productivity Improvement in Tunneling Operation (터널 버력처리 공정의 생산성 분석을 위한 시뮬레이션 모델 개발)

  • So, Byoung Gak;Woo, Sung Kwon;Lee, Si Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.1D
    • /
    • pp.83-91
    • /
    • 2008
  • This study establishes the model to estimate a work time and a machine equipment combination in a NATM tunnel. Also it includes the increasing rate of haulage distance in the model for to make near to reality model. A simulation model focuses on the mucking process which affects the work effectiveness very highly to plan of machine use in tunneling operation. With the analysis of work effectiveness through tunnel simulation model, it is defined the problem of planning phase. Also it shows the optimal working time and efficiency of machine used through change the number of dump truck and haulage distance.

A Program Development for Ground Data Analysis in Pile Excavation using Electric Motor (전기 모터를 이용한 지반 굴착에서의 지반 데이터 분석 프로그램 개발)

  • Kim, Min-Jae;Kim, Hyung-Bum;Cho, Seong-Je;Yoon, Jae-Keun
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2007.06c
    • /
    • pp.149-152
    • /
    • 2007
  • 최근 모든 분야에 대한 전산화가 가속화됨에 따라 업무 처리 능력의 향상과 함께 시간 비용의 절감을 이루고 있다. 이러한 추세와 함께 건설 분야에서의 전산화가 진행 중이다. 본 논문에서는 굴착장비의 전류 값과 굴착 깊이 계측을 통해 깊이에 따른 지반 강도를 전산화 시켜 추정함으로써 보다 합리적으로 말뚝 기초를 시공하는 방법 개발하고자 한다. 본 시스템은 건축, 토목, 건설 분야에서 국내 최초로 시도되는 것으로, 실제 공사 현장에서 획득되는 데이터의 분석을 도와 측정 오류(Human Error)를 최소화함은 물론 공사비 절감, 신속한 공사 정보 제공 등의 파급효과를 기대할 수 있다.

  • PDF

Relationship Between Net Penetration Rate and Thrust of Shielded TBM in Hard Rock (암반층에서 Shield TBM의 굴착속도와 추력과의 관계)

  • Park, Chul-Hwan;Park, Chan;Jeon, Yang-Soo;Park, Yeon-Jun
    • Tunnel and Underground Space
    • /
    • v.12 no.2
    • /
    • pp.115-119
    • /
    • 2002
  • Four tunnels have been planned to operate a large diameter shielded TBM in Gwangju urban subway construction site. No.1 tunnel has completely been excavated for 13 months operating. Net penetration rate and its relations with thrust farce of the shielded TBM are analysis in this report. This shallow depth tunnel of 536m length is located in soil layers at launching and in hard rocks at ending with 84 m length. The weekly net penetration rates haute dropped down as low as 20∼110 mm/hr in rock while 400∼800 mm/hr in soil. The actual penetration rates we proved to be high as the theoretical penetration rate which is analysis in consideration of conditions of machine and rock. And net penetration rate is investigated to increase linearly thrust force.

A Case Study on Penetrating Hard Rock with Alternative Methods of Shield TBM for Weathered Layer in Subway Construction (지하철공사에서 풍화대용 쉴드 TBM의 경암 구간 굴진 시 대체공법에 대한 사례연구)

  • Park, Hyung-Keun;Ko, Won Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.6D
    • /
    • pp.623-629
    • /
    • 2010
  • Recently, the Shield TBM (Tunnel Boring Machine) construction method is used gradually to increase at the Tunnel Constructin site. However the design and application of the Shield TBM were carried out without sufficient investigation of the ground conditions in the construction site. Due to insufficient understanding to the corresponding equipment is frequently occurring unexpected construction cost and extension of a construction period. The most suitable alternative construction method was determined by analyzing tunneling rate, duration, construction cost of shield machine and tunneling data of alternative method. The result of the case study is suggested as follows. First, the accurate soil exploration on the construction site should be preceded to prevent from tunneling stoppage and schedule delay. Second, the most suitable selection of the shield machine to the ground conditions of the construction site should be executed based on the investigation. Third, the best alternative method for boring of hard rock section is 'hard rock blasting after open cut and cover method'.

A study on the excavation cycle by the drill-and-blast method for a room-and-pillar underground structure (주방식 지하구조물의 발파 굴착공정 분석 연구)

  • Lee, Chul-Ho;Hyun, Young-Hwan;Hwang, Je-Don;Choi, Soon-Wook;Kang, Tae-Ho;Chang, Soo-Ho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.18 no.6
    • /
    • pp.511-524
    • /
    • 2016
  • Since a room-and-pillar underground structure is characterized by its grid-type array of room and pillar, its economical efficiency can be governed by excavation sequence. In this study, the construction period by the drill-and-blast method as a excavation method for a room-and-pillar underground structure was examined. In addition, the parallel excavation sequence was considered as the main sequence of a room-and-pillar underground structure. Sequences of mucking and support installation were derived to estimate the total excavation cycle by taking the case of a road tunnel into consideration. From the excavation cycle of room-and-pillar underground structure, the relationship between available maximum and minimum numbers of jumbo drill machines depending on the number of faces in operation was suggested.

Rehabilitation with the Green Method for the Huge Pipeline Using a Dry-Type Equipment (녹색공법을 이용한 대형 수도관 갱생)

  • Kim, Young-Ju;Choi, Byoung-Seub;Lee, Sang-Hyun;Hong, Dae-Sung;An, Hyo-Won
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2009.05a
    • /
    • pp.282-286
    • /
    • 2009
  • 1979년 준공된 수도권 광역상수도 1단계 시설은 상당한 노후화가 진행되었을 것으로 예상되며, 또한 향후 한강하류권 용수공급계획이 예정되어 있어 내부부식 및 관로손상부 개량의 시급성이 제기되었다. 이에 따라 직경 2,800${\sim}$800mm의 초대구경 도수관 53.9km의 개량을 위한 사업이 추진되었으며 시공성, 환경성, 경제성 등의 여러 항목에 대한 검토 결과 신개념 녹색공법인 비굴착식 건식일체형 공법이 최종 선정되었다. 그동안 기존관 개량공사에서 주로 사용되었던 굴착공법이 굴착에 따른 공기지연, 소음 분진 악취 등의 환경오염, 전구간 굴착에 따른 공사비 증가 등 많은 문제점을 안고 있는 것에 반해, 동사업에서 채택된 비굴착공법은 관로내에서 작업이 이루어지므로 공기단축, 환경오염 최소화에 따른 민원발생 최소화, 작업구만 굴착함에서 오는 공사비 절감 등 상대적으로 훨씬 우수한 것으로 평가된다. 동공법에 따르면 관내부 갱생공사는 '배수 및 잔류토사 제거'${\to}$'관내건조'${\to}$'표면처리'${\to}$'프라이머도장'${\to}$'본도장'의 순으로 진행된다. 일체형 장비에 의한 이와 같은 초대형관의 자동화시공은 세계에서 처음 적용되는 것이다.

  • PDF