• Title/Summary/Keyword: 군직정비

Search Result 2, Processing Time 0.017 seconds

A Concept Study on Efficiently Improving Performance for Korean MBT (한국형 전차의 효율적인 성능개량 개념)

  • Kim, Seok;Son, Seung-Hyun
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.11 no.6
    • /
    • pp.14-20
    • /
    • 2008
  • A battle management system should be introduced to improve mission success capabilities and accommodate integrated combat capabilities through increasing SA(Situation Awareness), or spatiotemporal synchronization of military operation in battle field environment. Conventional Korean Main Battle Tanks(Korean MBTs), which have been operated without digital network, were developed for 1980s. Korean new MBTs, which are mounted the battle management system, will be fielded soon. Therefore, old Korean MBT is needed to improve performances for co-operation with new one. This paper is reviewed each improved MBTs of world countries and domestic maintenance facilities. And this study suggests some processing methods which might be applicable to improve information network performance of old Korean MBTs.

A Study on the ILS Development & PLS Method for SI Weapon System based Commercial Items (상용품 기반 SI 무기체계의 효과적 ILS 개발 및 후속군수지원 방안)

  • Jeong, Inn-Sung;Lee, Yu-Se
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.12
    • /
    • pp.417-425
    • /
    • 2020
  • Recently, the development of weapons systems in conjunction with the Fourth Industrial Revolution has increased the number of weapon systems that integrate individual commercial systems by actively incorporating the superior fields of private commercial technologies. In the case of such commercial product-based weapons systems, however, the development of ILS elements across all areas, such as technical manual, military field maintenance support equipment, interactive electronic technical manual (IETM), and Computer Based Training (CBT) development, and weapons system Reliability, Availability, Maintainability(RAM) target values, and logistics support analysis (LSA) was requested to expand the level of development by developers. The commercial product-based System Integration (SI) weapon system will be able to complete the comprehensive military balance for complementing and effective maintenance of the military and developers only when the ILS development, which is limited to the essential elements of the required group, Request For Proposal (RFP) and Post-Logistics Support (PLS) directions were applied in the framework of outsourcing maintenance implementation. As a result, by checking the operation status of current weapons systems, the logistics support of commercial product-based weapon systems selected outsourcing as the basic policy that is decided based on the development requirements, focusing on maintaining operation through a rational decision-making process, and presented a plan for applying the development plan to the RFP for the determined core elements and PLS.