• Title/Summary/Keyword: 국가철도연구개발프로젝트

Search Result 6, Processing Time 0.019 seconds

Develop the Product Verification Process for the National R&D Project (국가연구개발프로젝트의 성과물 검증 프로세스 개발에 관한 연구)

  • Choi, Yo-Chul;Lee, Jae-Chon;Cho, Yeon-Ok;Kim, Sang-Ahm;Yoon, Hyuk-Jin
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.3
    • /
    • pp.382-387
    • /
    • 2009
  • When a system or service is realized, it needs to be verified by requirements. The process of verification is to check whether customers/stakeholders requirements have been property transformed into a system or service. A set of verification processes is described in the international or industrial standards. However, it is not appropriate to directly apply those verification processes in the national research and development projects. In particular, we noticed the problem in the development of safety systems, standards and process in the railway systems domain. As such, this paper is concerned with a detailed development of the verification process in that domain. Specifically, an effective and efficient verification process is presented regarding the safety systems and process, safety standards, and safety documents. Also, the verification process was modeled by a computer-aided systems engineering tool, Cradle(R). As a result, the outcomes of the verification process on be managed efficiently.

A study on the Life Cycle Model to effectively conduct the National Railway R&D Project (국가철도연구개발프로젝트의 효과적인 수행을 위한 생명주기모델 개발에 관한 연구)

  • Choi, Yo Chul;Lee, Jae Chon
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.4 no.1
    • /
    • pp.11-18
    • /
    • 2008
  • As a government agency or the Government-donated Research Institute or industrial research institute is intended to develop a product or to construct a system such as a railway safety systems by research and development process, a life cycle model leading a product development or a research and development is essential to them to systematically and effectively progress it. In this paper, the refined life cycle model to effectively conduct the national railway safety project consists of the life cycle phases and their detail descriptions with reference to other life cycle model in the international standard and the other national guidance and other industrial domain such as ship-building, weapon system, and aerospace areas, the proposed life cycle model in the paper considerably reflects the characteristics of the traditional research and development project in railway safety domain. A guidance of a life cycle model which based on lots of the life cycle model in other domains proposes additionally.

  • PDF

Develope the Product Verification Process for the National R&D Project (국가연구개발프로젝트의 성과물 검증 프로세스 개발)

  • Choi, Yo-Chul;Cho, Yeon-Ok;Kim, Sang-Am;Yoon, Heck-Jin;Lee, Jae-Cheon
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1566-1573
    • /
    • 2008
  • Generally, a system or service is verified by requirements if it has met them in transforming customer requirements into a system or service. But as the national research and development projects to develope safety systems or standards or process in railway system domain, it can be quite limiting that the product or systems verification process presented the international or industrial standards to be applied. This paper has analyzed and made up for the general verification process and presented the effective and efficient verification process about safety system, safety standard, process, and safety documents and the methods to manage the outcomes of verification process.

  • PDF

Software Quality Assurance Activities of Automatic Train Control System to meet Requirements of the IEC 62279 Standard (IEC 62279 요구사항 충족을 위한 열차제어시스템의 소프트웨어 품질보증 활동에 관한 연구)

  • Shim, Kyu-Don;Lee, Jong-Woo
    • Journal of the Korean Society for Railway
    • /
    • v.13 no.4
    • /
    • pp.412-418
    • /
    • 2010
  • This paper presents the methods to acquire the Safety Certificate from Independent Safety Assessment based on the IEC standard62279 which is commonly applied to railway system for Automatic Train Control(ATC) system in accordance with Urban Maglev project. This also shows approach methods and relative activities for project life- cycle to accomplish and ensure the system requirements of ATC system, RAMS and S/W quality activities. Furthermore, the key tasks conducted with ISA are noted in detail. These kind of activities for software quality of ATC system to obtain S afety Certificate could be a CASE model to improve the quality of domestic railway system and products, and also contribute to the growth of railway business and toward the achievement of overseas' railway signaling markets.

The Study of Establishing the Multi-pass Eurasian Railroads (유라시아 철도의 다중경로 구축에 관한 연구)

  • Hahm, Beom-Hee;Huh, Nam-Kyun;Hurr, Hee-Young
    • Korean Business Review
    • /
    • v.21 no.2
    • /
    • pp.137-170
    • /
    • 2008
  • This study is presenting the logistics strategy in the international logistics markets which makes competition and corporation among north-east Asian countries to establishing the multi-pass Eurasian railroads. The countries located in north-east area of Eurasia like China, Japan, Russia and Korea are paying higher costs and disutility to the transportations and communications due to repeated conflicts and confrontations causes from the politic problems. They are being used surface transportation for most of all logistics between Europe and Asia except special merchandises because of characteristic of cargo to be air, the Silk Road remains vestige only which was main logistic passage to this area since BC. So far the Trans-Siberian Railway is being used by Russia mostly as north of Eurasian transport because of difficulties of service. The Trans-China Railway built in 1992 is not accomplishing as a international logistic passages. It is expected to take a long lead time because of characteristic of resource development and poor logistic infrastructure to the countries like Uzbekistan, double landlocked country, Mongolia and Azerbaijan, the countries do not be adjacent to the sea, even they have great economic jump-up plans through the development of their own resources. The Shanghai Cooperation Organization(SCO) start to sail officially in 2001 is constructed with China, Russia, Tadzhikistan, Kyrgyzstan, Kazakhstan and Uzbekistan as regular members of 6 countries and Mongolia, India, Pakistan, Afghanistan and Iran as observers 5 countries. It is started as a military alliance to protect terror, but now, it is expended to cooperate with the traffic, transportation, trade and share of energies. The Russia is doing their best to activate TSR as a government target to developnorth area equivalently, and economic develop of far-east Siberia. And also it is agreed provisionally to improve and repair of rail road between Nahjin and Hassan to connect TSR and TKR( Trans-Korea Railroad) by Russia, North Korea and South Korea with Russian's aggressive efforts. The development plan of this area is over lapped with GTI(Greater Tumen Initiative) promoted by UNDP, and is a cooperated project by 5 countries of South Korea, Mongolia, China, Russia and North Korea, subject to review the appropriation of energy, tour, environment, rail road connection between Mongolia and China and establishing a ferry route to north-east Asia. It is Japanese situation to pay attention to Russia and China even they have been supplying large-scope of infrastructure in Mongol area without any charges, target to get East Asia Main Rail Road to connect Mongolia and Zalubino of Russia. In case of the program for the Denuclearization of North Korea is not creeping, it will be accelerated to connect the TKR and TSR, TKR and TCR by somehow attending United States, including developing program promoted by UN ESCAP. As the result, Korean peninsular will continue the central role of competition and cooperation as in the past, now and future of north-east Asia, as of geographical-economics and geographical-politics whether it is requested or not wanted by neighbor countries.

  • PDF

Design of Simulation Prototype UI for Virtual Reality-based Air Blast and Vibration (가상현실 기반 발파소음 및 진동 시뮬레이션 UI 설계)

  • Lee, Dongyoun;Lee, Sang Gyu;Seo, Myoung Bae
    • Smart Media Journal
    • /
    • v.10 no.4
    • /
    • pp.35-44
    • /
    • 2021
  • Recently, the new subway project called "Great Train Express" is in progress. During the tunnel excavation in the center of city, vibration and noise are generated, which make an uncomfortable effect on nearby residents. In order to prepare for this situation, the construction company generally establishes a noise and vibration management plan at the site from the construction planning stage through consultation with the residents of nearby areas and establishment of countermeasures for complaints raised. However, despite the establishment of a noise and vibration management plan, civil complaints have not been fundamentally resolved due to occurring noise and vibration during the construction in progress. In order to solve this problems, one of the best solution is to provide noise and vibration simulation technology with a high sense of reality and immersion for residents of nearby areas. Considering the ease and convenience of using the system, we intend to develop a UI(User Interface) necessary for the development of a simulation system that can directly experience the air blast and vibration based on virtual reality. The results of this study are expected to contribute to the development of virtual reality-based air blast and vibration simulations in the future.