• Title/Summary/Keyword: 교체비

Search Result 466, Processing Time 0.029 seconds

Replacement Model Following the Expiration of Free RRNMW (무료 재생교체-비재생수리보증이 종료된 이후의 교체모형)

  • Jung, Ki-Mun
    • Communications for Statistical Applications and Methods
    • /
    • v.18 no.6
    • /
    • pp.697-705
    • /
    • 2011
  • This paper proposes an optimal replacement policy following the expiration of a free renewing replacement-non-renewing minimal repair warranty. To do so, the free renewing replacement-non-renewing minimal repair warranty is defined and then the maintenance model following the expiration of free renewing replacement-non-renewing minimal repair warranty from the user's point of view is studied. As the criteria to determine the optimality of the maintenance policy, we consider the expected cost rate per unit time from the user's perspective. We derive the expressions for the expected cycle length and the expected total cost to obtain the expected cost rate per unit time. Finally, the numerical examples are presented for illustrative purposes.

최적의 베이즈 교체정책 : 비재생보증인 경우

  • Jeong, Gi-Mun;Han, Seong-Sil;Gwon, Yeong-Seop
    • 한국데이터정보과학회:학술대회논문집
    • /
    • 2001.10a
    • /
    • pp.34-41
    • /
    • 2001
  • 본 논문에서는 비재생보증을 갖는 수리 가능한 시스템에 대한 베이즈 관점에서의 최적의 교체정책을 제안한다. 비재생무료보증(non-renewing free-replacement warranty : NFRW)과 비재생비례보증(non-renewing pro-rata warranty : NPRW)의 두 가지 경우에 대하여 각각 기스템의 고장시간이 와이블분포일 때 베이즈 관점에서의 단위시간당 기대비용을 최소화하는 최적의 교체정책과 순응적 교체정책에 대하여 설명한다.

  • PDF

Replacement Model Following the Expiration of NFRRW (비 재생무료교체-수리보증이 종료된 이후의 교체모형)

  • Jung, Ki-Mun
    • The Korean Journal of Applied Statistics
    • /
    • v.23 no.6
    • /
    • pp.1147-1156
    • /
    • 2010
  • This paper proposes a replacement policy following the expiration of a non-renewing free replacement-repair Warranty(NFFRW). The non-renewing free replacement-repair warranty is defined and then the maintenance model following the expiration of the NFRRW is studied from the user's point of view. As the criteria to determine the optimality of the maintenance policy, we consider the expected cost rate per unit time from the user's perspective. All maintenance costs of the system incurred after the expiration of the warranty are paid by the user. Given the cost structures during the life cycle of the system, we determine the optimal maintenance period following the expiration of a NFRRW. Finally, the numerical examples are presented for illustrative purposes.

BIM-based Repair&Replacement (R&R) Cost Estimating Process (BIM기반 건축물 수선교체비 산정 프로세스)

  • Park, Jieun;Yu, Jungho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.31-38
    • /
    • 2016
  • In a construction project, the portion for maintenance costs for a building is considerable compared to the initial construction cost. As such, Life Cycle Cost (LCC) analysis is being increasingly utilized to assess the design value of engineering work in Korea. Additionally, the Public Procurement Service in Korea announced that it will be mandatory for all domestic construction projects to adopt BIM. Furthermore, the paradigm for architectural design has shifted from 2D to 3D, and to BIM, which includes a data management system. Within this background, however, there is currently no adequate BIM-based LCC analysis software and the requirements of cost estimation for repair and replacement cost for a building is not completely adequate in BIM tools such as Revit and Archicad. Therefore, this study suggests a process of cost estimation for repair and replacement (R&R) cost based on IFC data. First, we analyzed existing R&R criteria and defined BIM-based requirements when calculating R&R costs. These requirements were extracted from relevant IFC data. Subsequently, this was saved to a database and a BIM-based database was built for R&R cost estimation. Finally, this database was connected with external databases such as R&R Criteria DB and Cost Information DB to calculate R&R costs. This process is expected to improve upon the traditional process of cost estimation of R&R cost by applying a BIM model. The proposed process can contribute to a further standardizing of BIM-based LCC analysis thru application to initial construction costs, energy costs, and other maintenance costs.

보증기간이 있는 시스템의 교체정책

  • 정기문;권영섭
    • Proceedings of the Korean Statistical Society Conference
    • /
    • 2001.11a
    • /
    • pp.125-130
    • /
    • 2001
  • 본 논문에서는 혼합보증기간이 있는 수리 가능한 시스템에 대한 최적의 교체정책을 제안한다. 이 교체정책은 보증기간이 재생되는 경우와 재생되지 않는 두 가지 경우에 대해서 고려되며, 최적의 교체주기를 결정하기 위해서 사용자 관점에서의 단위 시간당 기대비용을 사용한다. 시스템의 고장시간이 와이블 분포를 할 때 수치적 예를 통해서 제안된 최적의 교체정책을 설명한다.

  • PDF

Optimal Replacement Policy for a Repairable System with Combination Warranty (혼합보증이 있는 수리 가능한 시스템에 대한 최적의 교체정책)

  • 정기문
    • The Korean Journal of Applied Statistics
    • /
    • v.15 no.1
    • /
    • pp.107-117
    • /
    • 2002
  • In this paper we present the optimal replacement policies following the expiration of combination warranty. We consider two types of combination warranty policies: renewing warranty and non-renewing warranty. The criterion used to determine the optimal replacement period is the expected cost rate per unit time from the user'perspective. The optimal maintenance period following the expiration of combination warranty is obtained. Some numerical examples are presented for illustrative purpose.

The Effects of Coach Turnover and Sport Team Performance: Evidence from the Korean Professional Soccer League 1983-2013 (한국프로축구팀의 감독교체가 팀 경기성과에 미치는 영향)

  • Kim, Phil-Soo;Kim, Dae-Kwon
    • 한국체육학회지인문사회과학편
    • /
    • v.54 no.4
    • /
    • pp.329-345
    • /
    • 2015
  • Our study examines the relationship between coach turnover and professional sport team performance using the evidences of Korean professional soccer teams. We collected panel dataset of 304 team-year observations and 96 coaches from Korean professional soccer league during the period of 1983-2013. Among them, our final sample is comprised of 226 observations and 81 coaches manifested for fixed-effect generalized least square (GLS) regression analysis. Drawing on sport management literatures and organizational learning theory, we argue that it takes time for a new head coach to take charge of the team in which the new leader who secure more time to interact with organization members is better able to remodel and improve team performance. Our empirical findings reveal that off-season coach turnover has a positive impact while turnover during the season has its negative influences on team performance. In addition, we find that subsequent team performance in association of off-season coach turnover is comparably better than that of on-season succession. The results show that coach succession rendered from inside the professional soccer team mediates the relationship between coach turnover and team performance. Our findings imply that coach turnover in professional sport teams is a significant factor affecting team performance.

A Bayesian approach to replacement policy following the expiration of non-renewing combination warranty based on cost and downtime (비재생혼합보증이 종료된 이후의 비용과 비가동시간에 근거한 교체정책에 대한 베이지안 접근)

  • Jung, Ki-Mun
    • Journal of the Korean Data and Information Science Society
    • /
    • v.21 no.5
    • /
    • pp.873-882
    • /
    • 2010
  • This paper considers a Bayesian approach to replacement policy following the expiration of non-renewing combination warranty. The non-renewing combination warranty is the combination of the non-renewing free replacement warranty and the non-renewing pro-rata replacement warranty. We use the criterion based on the expected cost and the expected downtime to determine the optimal replacement period. To do so, we obtain the expected cost rate per unit time and the expected downtime per unit time, respectively. When the failure times are assumed to follow a Weibull distribution with uncertain parameters, we propose the optimal replacement policy based on the Bayesian approach. The overall value function suggested by Jiang and Ji (2002) is utilized to determine the optimal replacement period. Also, the numerical examples are presented for illustrative purpose.

A Scheme of Semantic XML Query Cache Replacement (시맨틱 XML 질의 캐쉬의 교체 기법)

  • Hong, Jung-Woo;Kang, Hyun-Chul
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2005.05a
    • /
    • pp.59-62
    • /
    • 2005
  • 웹 상에서 XML 로 기술된 데이터가 증가하고, 이를 이용하여 의미 있는 데이터를 검색하는 것의 중요성이 커지고 있다. 웹 상에서 더 좋은 검색 성능을 보이기 위해 XML 질의 결과를 캐쉬하는 방법에 관한 연구들과 캐쉬의 저장 공간과 다양한 질의를 캐쉬에 저장하는 것에 한계가 있기 때문에 캐쉬 교체 기법에 관한 연구들이 있었다. 기존의 XML 캐쉬 교체 정책에는 질의 결과를 교체 단위로 하는 방법과 질의 결과 내의 각 경로들을 교체 단위로 하는 방법이 있는데, 첫번째 방법은 효율이 상대적으로 낮고 두번째 방법은 높은 효율에 비해 교체 연산을 수행하는 부담(overhead)이 크다는 단점이 있었다. 본 논문에서는 위 두 방법의 단점을 해결하기 위해 2 단계로 교체 희생자를 선택하는 방법을 제시한다. 질의 결과들 중에서 교체 희생자를 찾고, 그 희생자 내의 모든 경로들 중에서 다시 교체 희생자를 찾는다. 이는 각 질의 내의 경로가 교체 희생자가 되어 캐쉬 효율을 향상 시키고, 질의 결과에 대해 먼저 교체 대상을 찾으므로 교체 희생자를 찾기 위한 연산을 수행하는 부담을 줄인다. 또한 캐쉬 적중률, 최근 접근 시간, 인출 지연 시간, 객체 크기를 고려하여 교체 희생자를 선택하는 교체 함수를 제시한다. 가상의 시맨틱 데이터에 대한 캐쉬 교체 시스템을 구현하여 본 논문에서 제시한 교체 기법과 교체 함수를 평가한 결과를 기술한다.

  • PDF

A Group-based Web Cache Replacement Technique (그룹 기반의 웹 캐쉬 교체 기법)

  • 방지호;하란;차호정
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2001.04a
    • /
    • pp.352-354
    • /
    • 2001
  • 효율적인 웹 캐쉬 교체 알고리즘을 통해 웹 서버와 네트워크의 부하를 감소시킬 수 있으며, 이에 따라 사용자가 요청한 문서에 대한 응답시간과 지연시간을 효과적으로 개선시킬 수 있다. 기존에 연구된 교체 알고리즘 중 LRU-SIZE와 LRU-MIN 기법은 일차적으로 캐슁된 문서의 크기에 따라 교체를 하고 크기가 똑같은 경우에 한해서 LRU를 적용하여 교체를 한다. 그러나 LRU-SIZE와 LRU-MIN에 의해서 캐슁된 문서를 교체를 하면 크기의 차이가 크지 않으면서 자주 요청되는 문서가 교체될 수 있다. 본 논문에서는 캐슁된 문서 크기의 로그화에 따라 구성된 그룹에서 자주 요청되지 않는 문서를 교체하는 알고리즘을 제안한다. 로그화를 통해 크기의 차이가 적은 문서들이 같은 그룹으로 설정되어 비교되기 때문에 자주 요청되는 문서들이 크기의 차이가 적은 문서에 의해 교체되는 것을 막을 수 있다. 성능 평가를 통해 제안한 교체 알고리즘이 다른 기법에 비해 높은 hit ratio를 나타냄을 보여준다.