• Title/Summary/Keyword: 교체기준

Search Result 269, Processing Time 0.027 seconds

Investigation on Replacement Criteria for Aged Diesel Driven Power Generation Facility by Monte Carlo Simulation (몬테카를로 시뮬레이션을 통한 노후 디젤발전설비 교체기준 고찰)

  • Park, Myungsoo;Song, Gee Wook;Seo, Sang Il;Won, Dong Ju
    • Transactions of the KSME C: Technology and Education
    • /
    • v.2 no.2
    • /
    • pp.89-97
    • /
    • 2014
  • The diesel driven power generation facility provides most of electricity of island region where is isolated from the main land power supply system. It is possible to extend the life of diesel driven power generation facility by periodic maintenance. However, the long-term use of diesel driven power generation facility increases the operating cost due to aging hardware and reduced plant efficiency. In other words, on-time replacement of aging diesel driven power generation facility reduces plant operation cost. The purpose of this study presents major indicators to represent the characteristics of the diesel generator and conducts sensitivity analysis using Monte Carlo analysis. In addition, status core which indicates quantitatively the state of the diesel driven power generation facility is defined and prepare the replacement criteria based on the state score.

Replacement Model Following the Expiration of Free RRNMW (무료 재생교체-비재생수리보증이 종료된 이후의 교체모형)

  • Jung, Ki-Mun
    • Communications for Statistical Applications and Methods
    • /
    • v.18 no.6
    • /
    • pp.697-705
    • /
    • 2011
  • This paper proposes an optimal replacement policy following the expiration of a free renewing replacement-non-renewing minimal repair warranty. To do so, the free renewing replacement-non-renewing minimal repair warranty is defined and then the maintenance model following the expiration of free renewing replacement-non-renewing minimal repair warranty from the user's point of view is studied. As the criteria to determine the optimality of the maintenance policy, we consider the expected cost rate per unit time from the user's perspective. We derive the expressions for the expected cycle length and the expected total cost to obtain the expected cost rate per unit time. Finally, the numerical examples are presented for illustrative purposes.

Development of Online Battery Management System for Uninterruptible Power Supply (무정전 전원공급장치용 온라인 배터리 관리시스템 개발)

  • Nam Jong-ha;Choi Jin-Hong;Kim Seung-Jong;Kim Jae-Woong
    • Proceedings of the KIPE Conference
    • /
    • 2004.07b
    • /
    • pp.830-833
    • /
    • 2004
  • UPS 시스템에서 정전시 안정적인 전력공급을 방해하는 요소의 대부분은 배터리의 불량이 차지하고 있다. 일반적으로 UPS 시스템에 적용되는 배터리는 일정시간이 경과되면 전체를 교체하는 관리시스템을 가지며, 주기적인 방전시험을 실시하지만 교체기준에 대한 명확한 방안이 마련되어 있지 않다. 일부에서는 배터리의 내부저항 혹은 임피던스를 측정하여 배터리의 교체여부를 판단하는 기준으로 삼고 있지만 배터리의 비선형적 특성으로 인하여 그 오차범위는 크다고 할 수 있다. 또한 배터리는 부동충전시에는 정상적인 특성을 보이지만 방전시 불량 특성이 나타나는 경우가 많고, 리튬-이온 배터리의 경우 내부저항은 수십$[m\Omega]$의 비교적 큰 값을 가지지만 UPS에 적용되는 납축전지의 경우 수$[m\Omega]$ 정도의 아주 낮은 내부저항을 가져 측정오차에 의해 불량 여부를 명확히 판단하지 못하는 경우가 있다. 본 논문에서는 이러한 문제점에 착안하여 평상시에는 배터리의 개별셀 전압, 온도, 전체전압 및 보관함의 온도, 충방전 전류, SOC(State of Charge)를 현장 및 원격지의 모니터링 PC로 전송하여 사용자에게 보여주며, 정전으로 인한 방전시에는 내부저항과 개별셀의 용량을 계산하고 이를 통해 교체시기를 결정할 수 있도록 구성되어 있으며, 실험을 통해 타당성을 확인하였다.

  • PDF

BIM-based Repair&Replacement (R&R) Cost Estimating Process (BIM기반 건축물 수선교체비 산정 프로세스)

  • Park, Jieun;Yu, Jungho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.31-38
    • /
    • 2016
  • In a construction project, the portion for maintenance costs for a building is considerable compared to the initial construction cost. As such, Life Cycle Cost (LCC) analysis is being increasingly utilized to assess the design value of engineering work in Korea. Additionally, the Public Procurement Service in Korea announced that it will be mandatory for all domestic construction projects to adopt BIM. Furthermore, the paradigm for architectural design has shifted from 2D to 3D, and to BIM, which includes a data management system. Within this background, however, there is currently no adequate BIM-based LCC analysis software and the requirements of cost estimation for repair and replacement cost for a building is not completely adequate in BIM tools such as Revit and Archicad. Therefore, this study suggests a process of cost estimation for repair and replacement (R&R) cost based on IFC data. First, we analyzed existing R&R criteria and defined BIM-based requirements when calculating R&R costs. These requirements were extracted from relevant IFC data. Subsequently, this was saved to a database and a BIM-based database was built for R&R cost estimation. Finally, this database was connected with external databases such as R&R Criteria DB and Cost Information DB to calculate R&R costs. This process is expected to improve upon the traditional process of cost estimation of R&R cost by applying a BIM model. The proposed process can contribute to a further standardizing of BIM-based LCC analysis thru application to initial construction costs, energy costs, and other maintenance costs.

The Empirical Study on the Existence of the Opinion Shopping (감사의견구매의 존재에 관한 실증적 연구)

  • Shin, Chan-Hyu
    • Journal of Digital Convergence
    • /
    • v.18 no.9
    • /
    • pp.93-101
    • /
    • 2020
  • Although concerns about the opinion shopping have been continuously raised in the audit market, there has been little research on empirical evidence on the existence of audit opinions. For this reason, this study empirically confirmed whether the opinion shopping exists. At first, we measured thresholds of audit opinion issuing of two groups(changed or not-changed auditors). After that, the difference analysis was conducted to verify whether the thresholds of the audit opinion issuing was significant difference between two groups. As a result of the study, there was no significant difference in the thresholds of audit opinion issuing between two groups. This result can be interpreted that the audit opinion shopping is not a general phenomenon in the external audit market. The contribution of this study is to empirically confirmed that audit opinion shopping does not exist in the external audit market.

Lifetime Assessment of Electronic Watt-hour Meters (전자식 전력량계의 수명평가)

  • Seol, Ieel-Ho;Park, Jae-Duck;Park, Jung-Won;Ihm, Gook-Ju
    • Proceedings of the Korean Reliability Society Conference
    • /
    • 2006.05a
    • /
    • pp.345-353
    • /
    • 2006
  • 전력량계가 기계식에서 전자식으로 변화되면서 전력량계 교체주기의 재설정이 요구되고 있다. 현재까지는 기계식 전력량계의 교체주기를 적용하여 7년으로 교체주기를 정하고 있으나 기계식과 전자식은 차이가 있으므로 전자식 전력량계의 적정한 교체주기를 결정하여야 한다. 적정한 교체주기를 결정하기 위해서는 전자식 전력량계의 수명평가가 선행되어야 한다. 본 연구에서는 전자식 전력량계의 부품 분석을 통하여 전자식 전력량계의 수명에 영향을 미칠 수 있는 부품을 선정하고, 선정된 부품에 대하여 가속수명시험을 실시하였다. 가속수명시험 결과로부터 부품들의 수명을 추정하고, 수명이 가장 짧아서 전자식 전력량계의 수명을 결정하는 부품의 종류를 확인하였다. 전력량계의 수명은 가장 짧은 수명을 갖는 부품의 수명에 의존하므로 부품들의 수명 추정 결과로부터 전력량계의 수명을 평가할 수 있었다. 또한, 수명이 가장 짧은 부품에 대하여 목표 수명 이상의 수명을 가짐을 보증하기 위한 시험기준을 설계하였다.

  • PDF

Full-Envelope Controller Switching Scheme Using Bumpless Transfer Implementation Algorithm (무충돌 전환 구현 알고리즘을 사용한 전비행영역 제어기 교체법)

  • Kim, Tae-Shin;Kwon, Oh-Kyu
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.36 no.6
    • /
    • pp.574-580
    • /
    • 2008
  • This paper has proposed a controller switching scheme for full-envelope aircraft control using the bumpless transfer implementation algorithm developed recently. This switching scheme has combined by proper rules the common existing method which switches the controller according to attitude and mach number of the aircraft with an optimization method which uses the cost function relating to bump phenomenon by means of controller switching criterion. This paper exemplifies the control performance improvement via simulations applied to a high performance aircraft benchmark problem in a wide operating range to test the proposed controller switching scheme.

Replacement Model Following the Expiration of NFRRW (비 재생무료교체-수리보증이 종료된 이후의 교체모형)

  • Jung, Ki-Mun
    • The Korean Journal of Applied Statistics
    • /
    • v.23 no.6
    • /
    • pp.1147-1156
    • /
    • 2010
  • This paper proposes a replacement policy following the expiration of a non-renewing free replacement-repair Warranty(NFFRW). The non-renewing free replacement-repair warranty is defined and then the maintenance model following the expiration of the NFRRW is studied from the user's point of view. As the criteria to determine the optimality of the maintenance policy, we consider the expected cost rate per unit time from the user's perspective. All maintenance costs of the system incurred after the expiration of the warranty are paid by the user. Given the cost structures during the life cycle of the system, we determine the optimal maintenance period following the expiration of a NFRRW. Finally, the numerical examples are presented for illustrative purposes.