• Title/Summary/Keyword: 관통균열

Search Result 149, Processing Time 0.026 seconds

Assessment of Steam Generator Tubes with Multiple Axial Through-Wall Cracks (축방향 다중관통균열이 존재하는 증기발생기 세관 평가법)

  • Moon, Seong-In;Chang, Yoon-Suk;Kim, Young-Jin;Lee, Jin-Ho;Song, Myung-Ho;Choi, Young-Hwan
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.28 no.11
    • /
    • pp.1741-1751
    • /
    • 2004
  • It is commonly requested that the steam generator tubes wall-thinned in excess of 40% should be plugged. However, the plugging criterion is known to be too conservative for some locations and types of defects and its application is limited to a single crack in spite of the fact that the occurrence of multiple through-wall cracks is more common in general. The objective of this research is to propose the optimum failure prediction models for two adjacent through-wall cracks in steam generator tubes. The conservatism of the present plugging criteria was reviewed using the existing failure prediction models for a single crack, and six new failure prediction models for multiple through-wall cracks have been introduced. Then, in order to determine the optimum ones among these new local or global failure prediction models, a series of plastic collapse tests and corresponding finite element analyses for two adjacent through-wall cracks in thin plate were carried out. Thereby, the reaction force model, plastic zone contact model and COD (Crack-Opening Displacement) base model were selected as the optimum ones for assessment of steam generator tubes with multiple through-wall cracks. The selected optimum failure prediction models, finally, were used to estimate the coalescence pressure of two adjacent through-wall cracks in steam generator tubes.

Time-Based Characteristics of Acoustic Emission During Dental Composite Restoration (치아 와동의 복합레진 수복시 음향방출의 시간적 발생 특성)

  • Gu, Ja-Uk;Choi, Nak-Sam;Arakawa, Kazuo
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.35 no.2
    • /
    • pp.169-174
    • /
    • 2011
  • Acoustic emission (AE) signals were detected and analyzed in real time during the polymerization shrinkage of composite resin restoration in an artificial dental ring with a class I cavity. Most AE hit events were observed in the initial curing period of the 1st region with high contraction rate. The range of the $2^{nd}$ region for the stainless steel specimen was shorter than that for the PMMA specimen but longer than that for the human dentin specimen. AE hit events showed a blast-type signal having an amplitude in the range of 25.45 dB and a frequency band of 100.200 kHz or 240.300 kHz. These values of amplitude and frequency indicated the fracture of resin or of the adhesive layer.

Experimental Study on Behaviors of Pile-Abutment Joint in Integral Abutment Bridge (일체식 교대 교량의 파일-교대 연결부 거동에 관한 실험적 연구)

  • Kim, Sang-Hyo;Yoon, Ji-Hyun;Ahn, Jin-Hee;Lee, Sang-Woo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.6A
    • /
    • pp.651-659
    • /
    • 2009
  • This study dealt with the behavior of pile-abutment joints in integral abutment bridges. Two types of pile-abutment joints were proposed to strengthen its rigid action. One was fabricated with transverse rebars which penetrated the H-pile in the abutment. The other was composed of stud shear connectors on the flanges of the H-pile. Three half scaled pile-abutment joint specimens were fabricated and loading tests were performed to evaluate the behavior of proposed joints. The results showed that the initial stiffness in elastic region of all specimens was sufficient to be applied for the integral abutment bridges. However, the performances of the proposed joints were shown to be more effective in rigid action compared to the joints types suggested by the Integral Bridge Design Guideline. The results from stiffness, strength, rotation and crack propagation tests supported this matter.

Effect of Flexural Performance on U-Shaped Precast Concrete Beams with Noncontact Lapped Splice (비접촉 겹침 이음된 프리캐스트 U형 보의 휨성능에 미치는 효과)

  • Ha, Sang-Su;Kim, Seung-Hun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.12 no.6
    • /
    • pp.119-128
    • /
    • 2008
  • In this study, new moment-resisting precast concrete beam-column joint is proposed for moderate seismic regions. It has the connection reinforcing bars, penetrated the joint and lap-spliced with the bottom bars of precast U-shaped PC beam. To evaluate the performance for noncontact lapped splice, experimental and analytical works were conducted. Major variables for tests are the length of lap, the diameter of connection reinforcing bars, and the distance between lapped bars. Analytic research was performed nonlinear finite element method. Analytic research focused on crack pattern, load-deflection curve, comparison of internal force, evaluation of ductility strains of reinforcement bar. Results of experimental and analytical works show that the these variables has much influence on flexural strength and ductility, and joint behavior.

Study on the Shear Strengthening of Concrete Beams with Wire Rope Clamped by Bolts (볼트 체결된 와이어 로프를 이용한 RC 보의 전단보강에 대한 연구)

  • Kim, Sun-Young;Song, Jin-Gyu;Lee, Young-Uk;Byun, Hang-Yong
    • Journal of the Korea Concrete Institute
    • /
    • v.18 no.2 s.92
    • /
    • pp.283-290
    • /
    • 2006
  • The paper describes m experimental study on the shear strengthening of concrete beams with exposed wire rope. The strengthening method is using the mechanical bolting of wire rope tensioned on the exterior of beam section. There are two shear strengthening types. The first is closed type wrapped beam section with wire rope like as closed stirrup. The second is U type tensioned at the anchor located in the side of beam section. The main parameters of specimens are strengthening spacings of wire rope with 150, 200, and 250mm for the closed and U type respectively. The shear span ratio of specimens applied by 3-point loading is 4. The results showed that the ultimate shear strength and ductility of strengthened beams increased significantly compared with non-strengthened beams. Especially, the strengthening effect of closed type was very preferable to U type. Therefore, the shear strengthening method with wire rope is very reasonable in view of repair and rehabilitation of beams.

Numerical Analysis of the Change in Groundwater System with Tunnel Excavation in Discontinuous Rock Mass (불연속 암반에서의 터널굴착에 따른 지하수체계 변화에 대한 수치해석적 연구)

  • Park, Jung-Wook;Son, Bong-Ki;Lee, Chung-In;Song, Jae-Joon
    • Tunnel and Underground Space
    • /
    • v.18 no.1
    • /
    • pp.44-57
    • /
    • 2008
  • In this study, a 2D finite-element analysis, using the SEEP/W program, was carried out to estimate the amount of groundwater flawing into a tunnel, as well as the groundwater tables around wetland areas during and after a tunnel excavation through rock mass. Four sites along the Wonhyo-tunnel in Cheonseong Mountain (Gyeongnam, Korea) were analysed, where the model damain of the tunnel included both wetland and fault zone. The anisotropy of the hydraulic conductivities of the rock mass was calculated using the DFN model, and then used as an input parameter for the cantinuum model. Parametric study on the influencing factors was perofrmed to minimize uncertainties in the hydraulic properties. Moreover, the volumetric water content and hydraulic conductivity functions were applied ta the model to reflect the ability of a medium ta store and transport water under both saturated and unsaturated conditions. The conductivity of fault zone was assumed ta be $10^{-5}m/sec\;or\;10^{-6}m/sec$ and the conductivity of grouting zone was assumed as 1/10, 1/50 or 1/100 of the conductivity of rock mass. Totally $6{\sim}8$ cases of transient flow simulation were peformed at each site. The hydraulic conductivities of fault zone showed a significant influence on groundwater inflow when the fault zone crossed the tunnel. Also, groundwater table around wetland maintained in case that the hydraulic conductivity of grouting zone was reduced ta be less than 1/50 of the hydraulic conductivity of rock mass.

Application of the SASW Method to the Evaluation of Grouting Performance for a Soft Ground of a Tunnel (터널 원지반의 그라우팅 보강 평가를 위한 SASW 기법의 적용)

  • 조미라;강태호
    • Journal of the Korean Geotechnical Society
    • /
    • v.19 no.6
    • /
    • pp.273-283
    • /
    • 2003
  • Fissured rock and soft ground always suggest, problems in the construction of the underground space. The stress release of the weak underground material by opening the underground space with a soft ground, fissures and joints can lead to the failure of the opening. Grouting of the weak rock and the soft ground, which is a process of injecting some bonding agents into the soft ground, is one of the measures to reinforce the soft ground and to prohibit the failure of the underground construction due to the stress release. The proper installation of the grouting is essential to ensuring the safety of the tunneling operation, so that the evaluation of the grouting performance is very significant. The general procedure of evaluating the grouting is coring the grouted section and measuring the compression strength of the core. However, sometimes when the grouted section is at the crown of the tunnel and the grouting is installed at a wide section, the coring is not good enough. This study is oriented to propose a new and a non-destructive procedure of evaluating the grouting performance. The proposed method is based on the wave propagation of elastic waves, and evaluates the shear stiffness of the ground and investigates the anomalies such as voids and cracks. The SASW ( Spectral-Analysis-of-Surface-Waves) method is one of the candidate s to make the inspection of the pouting performance, and is adopted in this study. The practical grouting activity was monitored by SASW method, and the proposed method was applied to the inspection of the grouting performance to check the verification of the proposed method.

A Study on the Penetration Resistance and Spalling Properties of High Strength Concrete by Impact of High Velocity Projectile (고속비상체의 충돌에 의한 고강도 콘크리트의 표면관입저항성 및 배면박리성상에 관한 연구)

  • Kim, Hong-Seop;Nam, Jeong-Soo;Hwang, Heon-Kyu;Jeon, Joong-Kyu;Kim, Gyu-Yong
    • Journal of the Korea Concrete Institute
    • /
    • v.25 no.1
    • /
    • pp.99-106
    • /
    • 2013
  • Concrete materials subjected to impact by high velocity projectiles exhibit responses that differ from those when they are under static loading. Projectiles generate localized effects characterized by penetration of front, spalling of rear and perforation as well as more widespread crack propagation. The magnitude of damage depends on a variety of factors such as material properties of the projectile, impact velocity, the mass and geometry as well as the material properties of concrete specimen size and thickness, reinforcement materials type and method of the concrete target. In this study, penetration depth of front, spalling thickness of rear and effect of spalling suppression of concrete by fiber reinforcement was evaluated according to compressive strength of concrete. As a result, it was similar to results of the modified NDRC formula and US ACE formula that the more compressive strength is increased, the penetration depth of front is suppressed. On the other hand, the increase in compressive strength of concrete does not affect spalling of rear suppression. Spalling of rear is controlled by the increase of flexural, tensile strength and deformation capacity.

Tunneling in Severe Groundwater Inflow Condition (지하수 과다유입 조건하에서의 터널굴착)

  • Lee, Young-Nam;Kim, Dae-Young
    • Journal of the Korean GEO-environmental Society
    • /
    • v.7 no.2
    • /
    • pp.67-76
    • /
    • 2006
  • For a hydro power plant project, the headrace tunnel having a finished diameter of 3.3 m was constructed in volcanic rocks with well-developed vertical joint and high groundwater table. The intake facility was located 20.3km upstream of the powerhouse and headrace tunnel of 20km in length and penstock of 440m in height connected the intake and the powerhouse. The typical caldera lake, Lake Toba set the geology at the site the caving of the ground caused tension cracks in the vertical direction to be developed and initial stresses at the ground to be released. High groundwater table(the maximum head of 20bar) in the area of well-connected vertical joints delayed the progress of tunnel excavation severely due to the excessive inflow of groundwater. The excavation of tunnel was made using open-shield type TBM and mucking cars on the rail. High volume of water inflowraised the water level inside tunnel to 70cm, 17% of tunnel diameter (3.9m) and hindered the mucking of spoil under water. To improve the productivity, several adjustments such as modification of TBM and mucking cars and increase in the number of submersible pumps were made forthe excavation of severe water inflow zone. Since the ground condition encountered during excavation turned out to be much worse, it was decided to adopt PC segment lining instead of RC lining. Besides, depending on the conditions of the water inflow, rock mass condition and internal water pressure, one of the invert PC segment lining with in-situ RC lining, RC lining and steel lining was applied to meet the site specific condition. With the adoption of PC segment lining, modification of TBM and other improvement, the excavation of the tunnel under severe groundwater condition was successfully completed.

  • PDF