• Title/Summary/Keyword: 관리의 실패

Search Result 509, Processing Time 0.023 seconds

An Analysis of Critical Management Factors for Construction Failure on the Apartment Structural Framework using FMEA (FMEA 기법을 활용한 공동주택 골조공사의 건설실패 핵심관리요인 분석)

  • Oh, Chi-Don;Park, Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.78-88
    • /
    • 2012
  • Previous construction failure researches were focused on the utilization plan based on failure information and development of failure classification. However, it has limitation to set up the plan for prevention of construction failure due to the lack of the number of on-site staffs. In order to prevent effectively construction failure, a prevention plan should be established through quantitative evaluation of failure causes. The purpose of this study is to suggest the assessment method for selection Critical Management Factor(CMF) and to analyze the CMF on the apartment structural framework using FMEA(Failure Mode and Effective Analysis) which is one of the methods of quantitative evaluation. The element of risk evaluation separated degree of failure risk and prevention respectively. The assessment method for selection of CMF can be utilized for planning proactive solutions on the failure, and it can be also selected critical factors about each project phases, type of facility and construction work.

A Web-Based Construction Failure Information System using Case-Based Reasoning (사례기반추론을 이용한 웹 기반 건설실패사례 정보시스템)

  • Park, Yong-Sung;Oh, Chi-Don;Jeon, Yong-Seok;Park, Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.257-267
    • /
    • 2008
  • In order to encourage construction practitioners to acknowledge failures and disseminate the information, the failure information must be documented and accumulated with a well-structured format, which contains not only the fact and result but also the circumstance and cause of the failure. In the Korean construction industry, many failures are not explained clearly and often not even reported publicly, partly because due to the lack of understanding positive aspects of failures, which can improve construction practices as a result of learning from failures. The purpose of this study is to develop a web-based construction failure information system using the case-based reasoning techniques, which can systematically accumulate, manage, and share the valuable failure information using a structured failure cases database. It can be utilized for planning proactive solutions on future failures by searching the very similar past failure cases.

A Study on the Establishment of the Construction Failure Information Classification (건설실패정보 분류체계 구축에 관한 연구)

  • Park Chan-Sik;Jeon Yong-Seok;Shin Young-Hwan;Jang Nae-Chun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.1 s.13
    • /
    • pp.97-105
    • /
    • 2003
  • Although Construction Failure Information has been reported in literatures, reports of research, and etc., it Is difficult to utilize the information because the information classification does not exist. Therefore, this study investigated and analyzed literatures of domestic and abroad research Institutions and suggested the Construction Failure Information Classification(CFIC). The CFIC is composed of four classified items; facility general information, failure situation information, failure cause Information, and failure counterplan information. Each item is divided sub-items. Through CFIC, Construction Failure Information can be standardized and utilized for useful data to prevent recurrences of construction failure.

A Study on the Organizational Learning of the Disaster Management Organizations: the Cases of Daegu Subway (재난관리조직의 조직학습 사례분석-대구지하철 사례를 중심으로-)

  • Kim, Jong-Hwan
    • Journal of the Korea Society of Computer and Information
    • /
    • v.16 no.10
    • /
    • pp.211-218
    • /
    • 2011
  • Although the disaster management of Korea such as mitigation of disasters, preparedness for them and recovery from them. It should be considered based on the failures of the disaster management and the past experimental knowledge, it is believed that the repetitive occurrence of similar disasters is caused by absence of learning of disaster management organizational. That is, non-learning of the management organs due to experimental errors indicates that the organization themselves are not able to adjust to environment and the same kinds of disasters may happen in the future. Therefore, this study identifies repetitive failures by analysing reasons of the failures in terms of organizational learning in order to prevent from repetition of similar failures, and presents suggestions on the policy of disaster management. For the purposes, it carries both bibliographical analysis and case analysis. this study targets Daegu Subway Fire in 2003.

The effect of Internal control over financial reporting on probability of firm failure (내부회계관리제도가 기업실패가능성에 미치는 영향)

  • Kim, Hyun-Jin
    • Management & Information Systems Review
    • /
    • v.33 no.1
    • /
    • pp.173-190
    • /
    • 2014
  • According to COSO(2013) "Internal control is a process that is designed to provide reasonable assurance that a firm can achieve its objectives, where differing aspects of internal control can be partitioned into operating objectives, reporting objectives, and compliance objectives." Internal control over financial reporting(ICFR) is focus on reporting objectives and includes that provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use or disposition of the company's assets that could have a material effect on the financial statements. Thus, firms with weak ICFR have negative a effect on Firm value because those firms are great likelihood of misappropriation and inefficiency decision. In this regard, this study investigates the association of ICFR with the likelihood of firm failure. Specially, I measure the characteristic of ICFR as disclosures of material weaknesses and operating personnel of ICFR. I identify the likelihood of firm failure as going-concern opinion issued in audit report. As result, I find that a higher probability of firm failure is positively associated with the material weakness in ICFR also I find that a higher probability of firm failure is negatively associated with experience and qualified CPA of personnel in ICFR.

  • PDF

A Study on the Framework of the Continuous Improvement Model of Construction Process using Construction Failure Information (건설실패정보를 활용한 건설 프로세스의 지속적 개선 모델의 개념적 틀에 관한 연구)

  • Jeon Yong-Seok;Park Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.195-204
    • /
    • 2005
  • The construction failures can be decreased by continuously improving the construction process based upon the information of construction failures. Herein, the information of construction failures can be utilized as the key factor far identifying the ineffective process and providing the improved construction process that can prevent failures. The objective of this research is to suggest a model for improving construction process continuously by using the information of construction failures. An extended review and analysis of literatures related to the construction failure are performed to investigate the definition, type, cause, and lesson teamed of failure. This research also identifies that process modeling methodology and case-based reasoning are applicable to the construction process improvement, and then it suggests a framework of CIMCP(continuous improvement model of construction process based on the module of case-based reasoning such as case retrieval, case index, and case adaptation.

The Reducting Technique of compulsory Misses for S/W managed TLB (S/W관리 TLB의 초기접근실패 감소 기법)

  • Park, Jang-Suk
    • The Transactions of the Korea Information Processing Society
    • /
    • v.5 no.3
    • /
    • pp.620-632
    • /
    • 1998
  • This paper introduces a new teehniquc for reducing the compulsory misses of software-managed TLBs by prefetching necessary TLB entries before being used. This technique is not inherently limited to specific applications. The key of this scheme is to perform the prefetch operations to update the TLB entries before first accesses so that TLB misses can be avoided. For the identifications of the prefctch pages, the new classification is introduced, which is based 0n the view of an object code execution. Then, the algorithms and the implementation technique arc described. Using a quantitative analysis, the proposed scheme is evaluated to prove that it is a useful technique for the perronnall~~ ~nhan~"ment of the S/W managed TLBs. in addition, it is discussed that reducing the miss rate by the prefeteh scheme reduces the total miss penalty and bus traffics in S/W-managed TLBs.

  • PDF

정보시스템 프로젝트 관리

  • Jo, Min-Ho;Seol, Jeung-Ung
    • Digital Contents
    • /
    • no.8 s.75
    • /
    • pp.86-90
    • /
    • 1999
  • 지난 연재를 통하여 정보시스템 프로젝트의 성공적인 관리를 위한 성공요인과 실패요인, 그리고 관리요소와 프로젝트 관리 프로세스에 대해 살펴보았고, 이제 우리는 과거의 실사례를 되짚어 읽어 봄을 통해 반면교사(反面敎辭)하는 기회를 가져보고자 한다. 본 고에서 제시된 사례들은 저자들이 실제 가까이에서 경험한 것들도 있고 이미 널리 알려진 사례들도 있으나, 지금까지 제시한 성공 및 실패요인과 관리요소, 그리고 프로세스 관점에 따라 재해석해 보는 기회를 가져보는 것도 의미가 있다고 하겠다.

  • PDF

현업.기술 공동 대처로 개발 '실패요소'길목 차단

  • Korea Database Promotion Center
    • Digital Contents
    • /
    • no.2 s.81
    • /
    • pp.46-47
    • /
    • 2000
  • 과연 성공적인 애플리케이션 구현을 위해서는 어떤 요구사항이 존재하는 것일까? 전문가들은 총책임자가 관리해야 하는 그룹을 제품,프로그램,개발,품질보증,사용자 교육 등 5개의 카테고리로 구분하고 있다. 이들 5가지 카테고리를 얼마나 유기적으로 통합,관리하느냐에 따라 기업의 애플리케이션 환경이 성공과 실패의 기로에 놓이게 된다는 것이다.

  • PDF

사고관리 방안의 정량적 평가 방법론 및 공동범람 방안 평가

  • 김재환;유동한;서균렬
    • Proceedings of the Korean Nuclear Society Conference
    • /
    • 1996.05b
    • /
    • pp.487-492
    • /
    • 1996
  • 이 논문은 원자력발전소의 중대사고를 중지 또는 완화시키기 위하여 제시된 사고관리 방안의 실현가능성을 평가하기 위한 새로운 방법론을 소개하고 있다. 이 방법론은 사고관리 방안의 수행실패 요인으로 운전원 진단 및 의사결정 오류, 운전원 수행오류, 관련기기 실패로 인한 오류, 수행지연으로 인한 오류 등으로 나누고, 각각에 대하여 평가 방법을 제시하였다 .운전원 진단 및 의사결정 오류 평가시 고려하여야 할 주요 인자들을 제시하였으며, 수행지연으로 인한 오류 평가시에는 시스템 가용시간과 방안 수행 소요시간을 정의하고 각각에 대한 분포 획득 방법과 이를 이용한 평가 방법을 제시하였다. 제시된 방법론을 영광 3.4호기 공동범람 방안의 평가에 적용하였다.

  • PDF