• Title/Summary/Keyword: 공정입찰

Search Result 49, Processing Time 0.021 seconds

Effects of the Methods for Generating and Selecting Multiple Preliminary Prices on Budget Prices in Bidding Processes (복수예비가격 생성 및 추첨방법이 예정가격에 미치는 영향)

  • Kang, Minseok;Riew, Moon Charn
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.1
    • /
    • pp.89-97
    • /
    • 2015
  • In bidding processes conducted by government agencies, local governments or public agencies, budget prices are critical to both ordering bodies and bidders since budget prices are bases for selecting a successful bidder. Since a high budget price goes against ordering bodies and a low one goes against bidders, most ordering bodies adopt a system using multiple preliminary prices for determining a budget price to ensure fair and transparent manners. Discussed are how budget prices change depending on the methods of sampling 15 preliminary prices and the methods of sampling 4 out of 15 prices. Computer simulation is conducted to analyze budget prices for various methods to determine multiple preliminary prices. It is more likely for budget prices to be close to base prices when splitting a range of generating preliminary prices into 15 intervals and taking 4 preliminary prices from 15 intervals than when taking 4 preliminary prices from a whole range. In cases when splitting a range of generating preliminary prices, if we take 2 preliminary prices out of intervals above 100% and take 2 out of intervals below 100%, the expected budget prices are equal to a base price and the standard deviations are about half in comparison with those when taking 4 out of 15 intervals.

Schedule Risk Management of Reinforced Concrete Construction at the Preconstruction Phase (착공전 단계에서의 철근콘크리트 공사 공정리스크 관리 방안)

  • Ryu, Han-Guk;Kim, Sun-Kuk;Lee, Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.5 s.27
    • /
    • pp.119-127
    • /
    • 2005
  • According to the recent systemic changes such as construction market reduction, five days per week system, introduction of construction duration reduction bidding system and post-construction sale system, the bidding competition have been enhanced. However, there are many construction schedule risks which could delay construction completion. Without the proper identification of construction schedule risks and the structured construction schedule risk management, the competitive advantages of construction project could not be made. Previous researches to solve the problem have been focused on the construction schedule categorization, construction schedule management, and the system development to manage the construction schedule risk. Therefore, this study selected the reinforeced concrete construction as the studied work due to the major impact characteristics on the total construction duration and the quite accident rate, and then proposed the real construction schedule risks of reinforced concrete construction and the construction risk management method based on the previous studies, many times of expert interviews and brainstorming.

A Study on the Problem and Improvement of Screening System of Low Price Subcontracting by Analyzing a Standard of Judgement Criteria (원도급자 측면에서의 저가하도급 판정기준의 문제점과 개선방안)

  • Kim, Soon-Young;Han, Choong-Hee;Baek, Tae-Ryong;Kim, Kyoon-Tai;Lee, Jun-Bok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.6
    • /
    • pp.107-116
    • /
    • 2009
  • As the Fundamentals of Construction Business Act was revised in December 2004 and its implementing ordinances and enforcement regulations were adjusted in June 2005, the screening system of low price subcontracting has been an obligation to the public owners, having brought about arguments for and against since it enacted in 1983. The statutes for low price subcontracting have been reinforced from this year; for example, it underlines to submit to a project and builds an information network of subcontracting works. The system's original intention was that prevents shoddy and fraudulent constructions caused by low price subcontracting and precludes disturbances of fair trade by screening that whether it satisfies the conditions or not in advance. But, the criterion for the existing low price subcontracting has several issues having held up a true mirror to the real situation. It is arguable to discharge an important task with the primary purpose. This dissertation have researched the problem with a deposit of subcontract and the low price subcontracting basic rate are being used by the criteria for deciding whether it is a low price subcontracting or not, so showing the plan of reformation based on the findings, it wishes to contribute toward making the most of the system's essential intent.

An Empirical Study on Absorptive Capacity, Perceived Incentive Benefit and the Quality of Collaboration in Project-based Supply Chain (프로젝트 공급망 참여기업의 흡수능력, 지각된 인센티브 혜택 및 협업의 질에 관한 실증연구)

  • Kim, Tae Ung
    • Journal of Digital Convergence
    • /
    • v.11 no.7
    • /
    • pp.83-95
    • /
    • 2013
  • Supply chain management for engineering project focuses on planning acquisitions, identifying and choosing the right suppliers and subcontractors, planning and negotiating appropriate contracts, and administering the collaboration with the suppliers and subcontractors. This paper aims to identify the determinants of SCM performance of the suppliers and subcontractors participating in the project-based supply chain. This study proposes the absorptive capacity, fairness of suppliers' evaluation, the quality of collaboration and incentives as major research variables, and collected the survey responses from the suppliers and subcontractors having experiences with major engineering projects. The statistical results indicate that the incentives, absorptive capacity and the quality of collaboration influence SCM performance of suppliers, and that the fairness of suppliers' evaluation has some impact on the incentives and the absorptive capacity. But on the contrary to our expectation, the incentives have no significant impact on the level of absorptive capacity.

A Case Study on Owner's Loss Incurred due to the Financial Cost of Public Construction Works in Korea (국내 공공공사에서 발주자 손실의 금융비용 사례연구)

  • Jeong, Min;Lee, Ghang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.136-145
    • /
    • 2008
  • Occasionally an owner of public construction work pays financial costs in addition to progress payments. However, the overall scale of financial costs are not known. This research examines, based on a case study, the financial cost incurred in public construction works and the following issues: the overall scale of financial costs, the impact on financial costs on the owner, and the impact of timing on the overall sum of the financial costs. Annually, more than 2.3 trillion KRW are paid as progress payments for public construction work; yet, there is no research data showing the scale of financial costs thus incurred. The purpose of this research is to illustrate the scale of financial costs incurred due to progress payments for public construction works, and to suggest alternatives that would improve relevant regulations.

Study on Fairness Consolidation of Real Estate Auctions Secured for Bank NPLs (은행 부실채권(NPL) 담보부동산 경매의 공정성 강화방안 연구)

  • No, Han-Jang
    • The Journal of the Korea Contents Association
    • /
    • v.15 no.11
    • /
    • pp.397-409
    • /
    • 2015
  • The Global Financial Crisis and introduction of International Financial Reporting Standards (IFRS) urged the banks to strengthen their asset qualities. The banks dispose their non performing loans(NPLs) consistently to maintain a sufficient BIS capital adequacy ratio. Accordingly, the interests in auctions, as a disposal method, of real estates that secured for NPLs are on the increasing. This study suggest an alternative for fairness consolidation of real estate auctions which secured for NPLs. First, the impartial entry barriers for NPL sales markets need to be eliminated for fair bidding competition in auctions for real estate that secured for NPLs. In addition, the portion of NPL disposal by real estate auctions need to be expanded. Second, the asymmetry of trade information in the retail markets of NPLs and the abuse of offset by NPL owners' also should be restricted. The Fairness improvement of NPL trading process and real estate auction process that secured for them would of great use in the protection of bidders. Futhermore, it would also contribute to the revitalization of real estate auction markets and the resolution of NPLs of banks through fair disposal of distressed assets.

Modified Software Equation for Software Cost-Schedule Tradeoff (소프트웨어 비용-일정 타협을 위한 수정된 소프트웨어 공식)

  • Lee, Sang-Un;Choi, Myeong-Bok
    • Journal of the Korea Society of Computer and Information
    • /
    • v.16 no.9
    • /
    • pp.35-43
    • /
    • 2011
  • To develop a software, there is a relationship between development organization's productivity, effort, development schedule, and software size. It is software equation that motive these relations. Basically, relationship between size-effort and size-schedule is applied. If this relationship is not proper, there would be no effect of the cost-schedule tradeoff equation that is derived from software equation, and the manpower profile analysis, etc. To solve these unwanted problems, we presented a modified software equation and a cost-schedule tradeoff model based on the modified software equation. To improve software development success rate, applying proposed model will help in contract negotiation or bid.

An Investigation into Factors Influencing Competition Intensity in the Online Auction: A Mediating Role of Perceived Price Fairness (온라인 경매에서 인지된 가격공정성을 매개로 한 입찰경쟁 강도 영향요인에 관한 연구)

  • Park, Sang-Cheol;Kim, Jong-Uk
    • Asia pacific journal of information systems
    • /
    • v.17 no.1
    • /
    • pp.95-121
    • /
    • 2007
  • There are recently several studies of online auctions which have focused on exploring a bidder's bidding behavior in IS area. Those studies, however, have been limited to account for bidders' bidding behavior in the view of TAM and trust, not considering perceived price fairness and competition intensity. Although this view point seems reasonable in the online auction sites, few previous studies employing this perspective are found in the relevant literatures. Based on it, this study developed a comprehensive model based on trust and TAM in terms of perceived price fairness to explain competition intensity in the online auction sites. This study collected 269 survey responses from online bidders who have prior experiences with online auction sites. The survey data are used to empirically verify 11 research hypothesis by using LISREL. The results indicate that trust in websites, trust in sellers and perceived usefulness have significant impacts on perceived price fairness. Finally, perceived price fairness is strongly related to competition intensity in the online auction. This study ends with theoretical and managerial implications, as well as limitations and future research.

A Study on Improving Performance Bond System for Efficient Execution of Public Construction Works (효율적인 공사수행을 위한 공사이행보증제도 개선방안 연구)

  • Kim, Myeongsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.4
    • /
    • pp.21-29
    • /
    • 2020
  • This study analyzed problems of operating performance bond for public works and derived some suggestions for improvement. The Contract Law for Government Owner requires to submit performance bond which guarantees performing the construction contractor pays back compensation money when the obligation is not executed. Currently, first bid eligibility for participation is exactly required for executing company of performance bond obligation, not considering volume, technical level, and special type of remaining works. In collaboration contract, if guarantee accident occurs, it is obliged for remaining collaboration contractors to be qualified to fulfill the whole contract. This study proposes following improvement plan to solve problems of current performance bone in public works. Firstly, qualification criteria must be deregulated exceptionally for selecting proper contractor, which executing performance bond obligation, considering progress and characteristics of remaining works. Secondly, In collaboration contract, the prerequisite of remaining contractors' should be deregulated as 'implementation requirement of the remaining works'from'implementation requirement of the whole work'. Finally, defect responsibility should be included in liabilities of performance bond by specifying that owner or guarantee agency bear them.

A Study on the Power Supply and Demand Policy to Minimize Social Cost in Competitive Market (경쟁시장 하에서 사회적 비용을 고려한 전력수급정책 방향에 관한 연구)

  • Kwon, Byung-Hun;Song, Byung Gun;Kang, Seung-Jin
    • Environmental and Resource Economics Review
    • /
    • v.14 no.4
    • /
    • pp.817-838
    • /
    • 2005
  • In this paper, the resource adequacy as well as the optimum fuel mix is obtained by the following procedures. First, the regulation body, the government agency, determine the reliability index as well as the optimum portfolio of the fuel mix during the planning horizon. Here, the resources with the characteristics of public goods such as demand-side management, renewable resources are assigned in advance. Also, the optimum portfolio is determined by reflecting the economics, environmental characteristics, public acceptance, regional supply and demand, etc. Second, the government announces the required amount of each fuel-type new resources during the planning horizon and the market participants bid to the government based on their own estimated fixed cost. Here, the government announces the winners of the each auction by plant type and the guaranteed fixed cost is determined by the marginal auction price by plant type. Third, the energy market is run and the surplus of each plant except their cost (guaranteed fixed cost and operating cost) is withdrew by the regulatory body. Here, to induce the generators to reduce their operating cost some incentives for each generator is given based on their performance. The performance is determined by the mechanism of the performance-based regulation (PBR). Here the free-riding performance should be subtracted to guarantee the transparent competition. Although the suggested mechanism looks like very regulated one, it provides two mechanism of the competition. That is, one is in the resource construction auction and the other is in the energy spot market. Also the advantages of the proposed method are it guarantee the proper resource adequacy as well as the desired fuel mix. However, this mechanism should be sustained during the transient period of the deregulation only. Therefore, generation resource planning procedure and market mechanisms are suggested to minimize possible stranded costs.

  • PDF