• Title/Summary/Keyword: 공용부분

Search Result 68, Processing Time 0.028 seconds

On-line Finite Element Model Updating Using Operational Modal Analysis and Neural Networks (운용중 모드해석 방법과 신경망을 이용한 온라인 유한요소모델 업데이트)

  • Park, Wonsuk
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.34 no.1
    • /
    • pp.35-42
    • /
    • 2021
  • This paper presents an on-line finite element model updating method for in-service structures using measured data. Conventional updating methods, which are based on numerical optimization, are not efficient for on-line updating because they generally require repeated eigenvalue analyses until convergence criteria are met. The proposed method enables fully automated on-line finite element model updating, almost simultaneously with vibration measurement, without any user intervention or off-line procedures. The automated covariance-driven stochastic subspace identification (Cov-SSI) method is utilized to identify modal frequencies and vectors, and the identified modal data is fed to the neural network of the inverse eigenvalue function to produce the updated finite element model parameters. Numerical examples for a wind excited 20-story building structure shows that the proposed method can update the series of finite element model parameters automatically. It is also shown that sudden changes in the structural parameters can be detected and traced successfully.

Classification and Water Supply Capacity Evaluation of Hydropower Dams: A Case Study of North-Han River Basin (발전용댐의 유형구분 및 용수공급능력 산정 방안: 북한강수계 발전용댐을 중심으로)

  • Choi, Jeongwook;Jeong, Gimoon;Kang, Doosun;Ahn, Jeonghwan;Kim, Taesoon
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2021.06a
    • /
    • pp.108-108
    • /
    • 2021
  • 최근 국내에서는 기후변화로 인해 지역별·계절별 강수편차가 커지고 있으며, 이로 인해 상습가뭄지역(충남 서부, 경기 남부, 전라 등)의 가뭄 피해가 확대되는 등 수자원의 안정적인 공급을 위협하고 있다. 실제로 지난 2014-2015년 발생한 가뭄으로 인해 충남·경기지역 일부에서 수 개월간 생·공용수 공급이 제한된 바 있다. 기후변화에 대비한 국내 수자원의 추가 확보 및 효율적인 활용 방안의 필요성이 증가하고 있으나, 신규 수공시설물(댐, 저수지 등)을 건설하기 힘든 국내 개발 여건상 기존 수공시설물을 최대한 활용하기 위한 다양한 방안이 추진되고 있다. 기존 댐의 용수공급 능력을 재평가하거나, 댐·보 시설물의 연계운영을 통한 용수공급능력의 분석은 대부분 다목적댐 및 용수공급댐을 대상으로 수행되어 왔으며, 발전용댐을 활용한 용수공급능력 평가는 상대적으로 미흡한 실정이다. 따라서 최신화된 데이터 및 발전용댐 특성을 고려한 객관적인 평가방법을 통해 발전용댐의 용수공급능력을 새롭게 평가할 필요가 있다. 당초 수력발전이라는 단일목적으로 건설된 발전용댐은 다목적댐 대비 구조적 특성과 운영 측면에서 상이한 부분이 많아, 용수공급능력 평가 시 발전용댐의 특성을 고려할 필요가 있다. 따라서 본 연구에는 발전용댐의 구조 및 운영특성을 고려하여 발전용댐 별 유형(저류형 및 비저류형)을 구분하는 방안을 제안하고, 발전용댐 유형별 용수공급능력 산정 방안을 제시하였다. 제안한 기법은 북한강수계에 위치한 발전용댐에 적용하여 정량적인 용수공급능력을 평가하였다. 본 연구는 국내에서 연구가 미흡하였던 발전용댐을 대상으로 댐 이수능력을 검토하였으며, 향후 국가 수자원 계획 수립에 활용될 수 있을 것으로 기대된다.

  • PDF

Pavement Response in Flexible Pavements using Nonlinear Tire Contact Pressure and Measured Tire Contact Area (타이어의 접지 면적과 비선형 접지압력을 고려한 연성포장내의 거동 분석)

  • Jo, Myoung Hwan;Kim, Nakseok;Jeong, Jin-Hoon;Seo, Youngguk
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.4D
    • /
    • pp.601-608
    • /
    • 2006
  • The important elements in pavement design criteria are the stress and strain distributions. To obtain reasonable stress and strain distribution, tire contact area and tire pressures are very important. In this study, finite element analysis was used to identify the three-dimension states using nonlinear tire contact pressure and measured tire contact area. Measured tire contact area was quite different from the assumed tire contact area, and it resulted in different strain states under the tire. At the surface course, considering tire rib and nonlinear tire pressure, the pavement response presented accurate data compared to the predicted one. However, at the binder course, tire effects were generally negligible and it showed that the predicted pavement response was different compared to the measured one.

External Post-tensioning Strengthening of Composite Girder Bridge Using Lateral Distribution of Post-tensioning Force (긴장력 횡분배를 이용한 강합성형교 외부 후 긴장 보강)

  • Park, Young Hoon;Park, Yong Gul
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.6A
    • /
    • pp.587-596
    • /
    • 2009
  • This study analyzes the lateral distribution behavior of external post-tensioning force and evaluates the possibility of strengthening the servicing composite girder bridge by adopting the external post-tensioning force to the parts of the bridge girder. From the results of experiments and analyses, it is founded that the composite girder bridge can be strengthened by applying the external post-tensioning force to the parts of the bridge girder. It is also proved that bracing improve the lateral distribution behavior of post-tensioning force. The lateral distribution behavior of post-tensioning force which influenced by stiffness ratio, girder spacing and span length is changed by the bridge type and the location of tensioned girder. From the results of analyses, set up an equation which can predict the lateral distribution behavior of external post-tensioning force and evaluate the rationality.

Stress Distribution of Concrete Pavements under Multi-Axle Vehicle Loads Applied at Pavement Edges (모서리부 차량 다축하중에 의한 콘크리트 도로 포장의 응력 분포 특성)

  • Kim, Seong-Min;Cho, Byoung-Hooi;Lee, Sang-Hoon
    • International Journal of Highway Engineering
    • /
    • v.8 no.4 s.30
    • /
    • pp.13-24
    • /
    • 2006
  • The stresses in concrete pavement systems are larger when vehicle loads are applied at pavement edges, and these large stresses significantly affect the behavior and performance of pavements. Therefore, in this study, the stress distribution and the critical stresses in concrete pavements were investigated using a finite element model when dual-wheel single-, tandem-, and tridem-axle loads were applied at pavement edges. First, the stress distribution along the longitudinal and transverse directions was analyzed, and then the effects of slab thickness, concrete elastic modulus, and foundation stiffness on the stress distribution were investigated. The effect of the tire contact pressure related to the tire print area was also studied. The location of the critical stress occurrence in concrete pavements was finally investigated. From this study, it was found that the critical concrete stress due to edge loads became larger as the concrete elastic modulus increased, the slab thickness increased, and the foundation stiffness decreased. The effect of the tire contact pressure on the critical stress was clear as the slab thickness became smaller. The critical stress location in the transverse direction was independent of the concrete elastic modulus and the foundation stiffness; however, it moved into the interior as the slab thickness increased. The critical stress location in the longitudinal direction was under the axle for single- and tandem-axle loads, but for tridem-axle loads, it tended to move under the middle axle from the outer axles as the concrete elastic modulus and/or slab thickness increased and the foundation stiffness decreased.

  • PDF

Time-Lapse Crosswell Seismic Study to Evaluate the Underground Cavity Filling (지하공동 충전효과 평가를 위한 시차 공대공 탄성파 토모그래피 연구)

  • Lee, Doo-Sung
    • Geophysics and Geophysical Exploration
    • /
    • v.1 no.1
    • /
    • pp.25-30
    • /
    • 1998
  • Time-lapse crosswell seismic data, recorded before and after the cavity filling, showed that the filling increased the velocity at a known cavity zone in an old mine site in Inchon area. The seismic response depicted on the tomogram and in conjunction with the geologic data from drillings imply that the size of the cavity may be either small or filled by debris. In this study, I attempted to evaluate the filling effect by analyzing velocity measured from the time-lapse tomograms. The data acquired by a downhole airgun and 24-channel hydrophone system revealed that there exists measurable amounts of source statics. I presented a methodology to estimate the source statics. The procedure for this method is: 1) examine the source firing-time for each source, and remove the effect of irregular firing time, and 2) estimate the residual statics caused by inaccurate source positioning. This proposed multi-step inversion may reduce high frequency numerical noise and enhance the resolution at the zone of interest. The multi-step inversion with different starting models successfully shows the subtle velocity changes at the small cavity zone. The inversion procedure is: 1) conduct an inversion using regular sized cells, and generate an image of gross velocity structure by applying a 2-D median filter on the resulting tomogram, and 2) construct the starting velocity model by modifying the final velocity model from the first phase. The model was modified so that the zone of interest consists of small-sized grids. The final velocity model developed from the baseline survey was as a starting velocity model on the monitor inversion. Since we expected a velocity change only in the cavity zone, in the monitor inversion, we can significantly reduce the number of model parameters by fixing the model out-side the cavity zone equal to the baseline model.

  • PDF

Characteristic Analysis of Permanent Deformation in Railway Track Soil Subgrade Using Cyclic Triaxial Compression Tests (국내 철도 노반 흙재료의 반복재하에 따른 영구변형 발생 특성 및 상관성 분석)

  • Park, Jae Beom;Choi, Chan Yong;Kim, Dae Sung;Cho, Ho Jin;Lim, Yu Jin
    • Journal of the Korean Society for Railway
    • /
    • v.20 no.1
    • /
    • pp.64-75
    • /
    • 2017
  • The role of a track subgrade is to provide bearing capacity and distribute load transferred to lower foundation soils. Track subgrade soils are usually compacted by heavy mechanical machines in the field, such that sometimes they are attributed to progressive residual settlement during the service after construction completion of the railway track. The progressive residual settlement generated in the upper part of a track subgrade is mostly non-recoverable plastic deformation, which causes unstable conditions such as track irregularity. Nonetheless, up to now no design code for allowable residual settlement of subgrade in a railway trackbed has been proposed based on mechanical testing, such as repetitive triaxial testing. At this time, to check the DOC or stiffness of the soil, field test criteria for compacted track subgrade are composed of data from RPBT and field compaction testing. However, the field test criteria do not provide critical design values obtained from mechanical test results that can offer correct information about allowable permanent deformation. In this study, a test procedure is proposed for permanent deformation of compacted subgrade soil that is used usually in railway trackbed in the laboratory using repetitive triaxial testing. To develop the test procedure, an FEA was performed to obtain the shear stress ratio (${\tau}/{\tau}_f$) and the confining stress (${\sigma}_3$) on the top of the subgrade. Comprehensive repetitive triaxial tests were performed using the proposed test procedure on several field subgrade soils obtained in construction sites of railway trackbeds. A permanent deformation model was proposed using the test results for the railway track.

A Study on Analysis of Real Response of Steel Railway Bridges (강철도교의 실응답해석에 관한 연구)

  • Chang, Dong Il;Choi, Kang Hee;Lee, Hee Hyun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.9 no.2
    • /
    • pp.43-54
    • /
    • 1989
  • In this paper, measured and calculated responses are compared in order to give how the static and dynamic responses occurred in steel railway bridges due to train loads could be calculated appropriately. From this, it is investigated how the impact factors are varied by changing the train speed above 100km/h Field measurement is carried out by the steel strain gages and displacement transducers at the main design points, and then the static and dynamic response, fundamental frequencies, damping ratios and impact factors of the bridges are obtained. Static analysis is done using the computer program developed according to three dimensional matrix structural analysis in which the trains and bridges are modelled as 1,2 and 3 dimensions. Dynamic analysis is done according to 2 approaches, the moving force and mass problem. In moving force problem, the solutions are obtained by the modesuperposition-method and in moving mass problem by the direct integration method. From this study, it is known that in order to obtain the static response in the railway bridges, the bridge could be modelled by 1 or 2 dimension as in the highway bridge, however the response ratio(measured/calculaled) is high comparing to the highway bridges. By the way, the dynamic response should be obtained by the moving mass problem. And by comparing the measured and code specified impact factors, it is known that the factors specified in the present railway bridge code are very safe under the present service speed below 100km/h. However, because the factors become very high under the speed above 100km/h, especially in the simple plate girder bridge, it is thought that the code specification on impact factor should be discussed enough under the rapid transit system.

  • PDF

3D Finite Element Analysis of High Tension Bolted Joints (고장력 볼트 이음부의 3차원 유한요소 해석)

  • Shim, Jae Soo;Kim, Chun Ho;Kim, Dong Jo
    • Journal of Korean Society of Steel Construction
    • /
    • v.16 no.4 s.71
    • /
    • pp.407-414
    • /
    • 2004
  • Bridges in common use are expected to have more varieties of load in their connected members and bolts than in construction. Faults in connection members or bolts occur so often according to the time flow. One of the purposes of this study is to find out the behavior and structural features of high-tension bolted joints with faults that are very difficult and cost much to find out through experimentation with finite element analysis. Another purpose of this study is to provide sufficient data, estimated experimental results, and the scheme of the test plate for an economical experimental study in the future. Surveys of bridges with a variety of faults and statistical classifications of their faults were performed, as was a finite element analysis of the internal stress and the sliding behavior of standard and defective bridge models. The finite element analysis of the internal stress was performed according to the interval of the bolt, the thickness of the plate, the distance of the edge, the diameter of the bolt, and the expansion of the construction. Furthermore, the analysis explained the sliding behavior of high-tension bolt joints and showed the geometric non-linear against the large deformation, and the boundary non-linear against the non-linear in the contact surface, including the material non-linear, to best explain the exceeding of the yield stress by sliding. A normally bolted high-tension bolt joint and deduction of bolt tension were also analyzed with the finite element analysis of bridge-sliding behavior.

A Study on Repair/ Retrofit for Deteriorations of Steel Bridge -Behavior Characteristics of Welded Joint Part of Flange and Repair/Retrofit of Fatigue Crack in Railway Steel Bridge- (강철도교 열화현상에 관한 보수/보강 연구 -강철도교의 플랜지 용접이음부의 거동 특성 및 피로균열 보수보강-)

  • Kyung, Kab Soo;Lee, Sung Jin;Park, Jin Eun;Cha, Cheol Jun
    • Journal of Korean Society of Steel Construction
    • /
    • v.24 no.6
    • /
    • pp.613-625
    • /
    • 2012
  • Since railway bridge frequently have a chance of passing train load close to design load, it is necessary to reflect sufficiently fatigue property in early design phase for many structural details. Nevertheless fatigue cracks are reported partly in deck plate girder of railway steel bridge because of the weight and arrangement of axial load acting on railway bridge, the application of improper structural details for fatigue problem etc.. One of main cause for fatigue crack at the welded part of upper flange and web is caused by the eccentricity action of train load due to the difference of center to center spacing between the main girder supporting sleeper and the rail acting train load. For the existing deck plate girder of railway steel bridge, in this study, field survey, field measurement and a series of structural analysis were performed. In addition, the characteristics of structural behavior, the causes and repair/ retrofit of fatigue crack were examined in the target bridge.