Reliability of Revenue Recognition by Percentage of Completion Method in Construction Industry - Empirical Analysis from Information Perspective (건설업의 공사진행기준에 의한 수익인식의 신뢰성 검증 - 정보적 측면에서의 실증분석)

  • Park, Hong-Jo;Ji, Hyun-Mi
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.5
    • /
    • pp.463-470
    • /
    • 2016
  • Construction companies calculate their revenues and costs from constructing activities using the 'Percentage of Completion Method', which is based on ratio of actual construction cost to total costs estimated. The reliability of the net profit of construction companies is being evaluated lower than other industries due to incorrect application of 'Percentage of Completion Method' to cover losses actually occurred. Therefore, the purpose of this study is to verify the quality of earnings calculated based on 'Percentage of Completion Method' in terms of information usefulness. Results from empirical analysis show that investors in stock market underestimate the value of the construction companies' earning information by applying 'Percentage of Completion Method' and not actively use in investment decision making. Accordingly, it has been confirmed that the association between income information and stock prices falling. These results suggest the need for strict supervision of the supervisory authorities and the practical application of 'Percentage of Completion Method' in reliability.

Noise and Vibration Isolation Method at Construction Site (건설공사장 소음.진동 방지 대책)

  • 정갑철;이성호;김영근
    • Explosives and Blasting
    • /
    • v.18 no.4
    • /
    • pp.19-28
    • /
    • 2000
  • 건설공사장 소음·진동 문제는 공사규모의 확대 및 대형중기의 사용으로 인하여 피해가 확대되고 있다. 특히 최근에 도심지 공사의 빈도가 증가하면서 대부분의 경우 인근 주민에게 피해를 줄 수 있는 법적 기준을 초과하고 있고, 소음에 노출된 주민들의 의식 변화로 많은 민원이 야기되고 있으나 현행 국내의 건설소음 진동 규제기준이 대상지역별, 시간대별로 전체적인 레벨만을 제시하고 있어 효율적인 대책수립이 어려운 실정이다. 또한 토목공사의 경우 공사현장과 가축양가 사이에 분쟁이 발생되고 있으나 인과관계의 성립여부, 피해규모, 피해액 산정, 향후조처 등에 대한 명확한 기준과 처리 사례가 국내외를 막론하고 극소수에 분과하여 분쟁의 조정이나 대책수립에 많은 어려움이 있다. 따라서 본 논문에서는 소음진동에 관련된 법적인 기준이나 각종 물적 피해에 대한 판정기준을 설명하고 당사 현장에서 발생한 민원에 관련된 사례를 소개함으로서 현행법의 문제점과 원활한 공사진행을 위한 민원에 대한 의식을 높임으로서 공사초기에 적극적으로 대처하게 하여 원만한 공사진행에 도움이 되고자 한다.

  • PDF

Unbilled Revenue and Analysts' Earnings Forecasts (진행기준 수익인식 방법과 재무분석가 이익예측 - 미청구공사 계정을 중심으로 -)

  • Lee, Bo-Mi;Park, Bo-Young
    • Management & Information Systems Review
    • /
    • v.36 no.3
    • /
    • pp.151-165
    • /
    • 2017
  • This study investigates the effect of revenue recognition by percentage of completion method on financial analysts' earnings forecasting information in order industry. Specifically, we examines how the analysts' earnings forecast errors and biases differ according to whether or not to report the unbilled revenue account balance and the level of unbilled revenue account balance. The sample consists of 453 firm-years listed in Korea Stock Exchange during the period from 2010 to 2014 since the information on unbilled revenue accounts can be obtained after the adoption of K-IFRS. The results are as follows. First, we find that the firms with unbilled revenue account balances have lower analysts' earnings forecast accuracy than the firms who do not report unbilled revue account balances. In addition, we find that the accuracy of analysts' earnings forecasts decreases as the amount of unbilled revenue increases. Unbilled revenue account balances occur when the revenue recognition of the contractor is faster than the client. There is a possibility that managerial discretionary judgment and estimation may intervene when the contractor calculates the progress rate. The difference between the actual progress of the construction and the progress recognized by the company lowers the predictive value of financial statements. Our results suggest that the analysts' earnings forecasts may be more difficult for the firms that report unbilled revenue balances as applying the revenue recognition method based on the progress criteria. Second, we find that the firms reporting unbilled revenue account balances tend to have higher the optimistic biases in analysts' earnings forecast than the firms who do not report unbilled revenue account balances. And we find that the analysts' earnings forecast biases are increases as the amount of unbilled revenue increases. This study suggests an effort to reduce the arbitrary adjustment and estimation in the measurement of the progress as well as the introduction of the progress measurement method which can reflect the actual progress. Investors are encouraged to invest and analyze the characteristics of the order-based industry accounting standards. In addition, the results of this study empower the accounting transparency enhancement plan for order industry proposed by the policy authorities.

  • PDF

Standardized Progress Measurement Package (건설진도율 산정을 위한 진도관리단위에 관한 연구)

  • Jung Youngsoo;Kang Seunghee;Chin Sangyoon;Kim Yeasang;Chung Moonhun;Park Soonchan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.565-570
    • /
    • 2004
  • The construction Progress is widely used 3s a critical index for effective project management. However, the methods, structure, data, and accuracy of progress measurement may vary depending on specific characteristics of the project, organization, or location. Even in an organization, different projects may utilize different measurement methods to effectively achieve their own management purpose. The excessive effort required to manipulate very detailed progress data is also an issue Therefore the purpose of this study is to dove]op an automated progress measurement model utilizing standard progress measurement package (SPMP).

  • PDF

Necessity of Improvements on Code of Practice at the Demolition Work considering Building Structure Type : Based on Demolition work of Permission and Registration (건축물의 구조유형을 고려한 해체공사 제도 개선 방안 필요성 - 해체공사의 허가 및 신고를 기준으로 -)

  • Shim, Yukyung;Jeong, Jaewook;Lee, Jaehyun;Jeong, Jaemin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.6
    • /
    • pp.66-74
    • /
    • 2020
  • To prevent incident of demolition work the Building Management Act was implemented to manage demolition work. According to this law, buildings with the scale upper than 500㎡ of floor area are classified as permission to conduct the demolition work, however it may be hard to perform safety management at demolition work. In addition, the risk level of demolition work is varied with related to the structure type. So, the purpose of this study is to suggest the improvements of criteria on demolition work considering building structure types including small-scale structures such as masonry, wooden, and other structure. The research process was conducted by three steps. (I) Application of Building Management Act; (II) Analysis of demolition work by structure types; and (III) Subdivision of permission targets by building structure types. The result of this study, permission ratio was only 10% for total demolition work and 2.43% for masonry. Because the masonry, wooden, and other structure types are concentrated on a floor area of small-scale, the separate criteria of demolition work is need to prevent the accident and fatal incident. Through the results, the decision maker can be utilized (1) For the special building structure types, the criteria of enhanced safety management are applied by referring to the overseas law ; and (2) The demolition work can be considered by the criteria of separate permission in terms of structure types.

A Study on the Standardization of Construction Types for the Management of River Project (하천사업 공사관리를 위한 공종 표준화 방안 연구)

  • Jang, Chorok;Jang, Moon Yup;Song, Juil;Kim, Han Tae
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2021.06a
    • /
    • pp.486-486
    • /
    • 2021
  • 국가에서는 수해예방 및 주민들의 삶의 질 향상을 위해 다양한 하천사업을 수행한다. 국토교통부의 경우 매년 막대한 예산을 투입하여 하천정비 및 재해복구사업 등을 추진 중에 있으나, 체계적인 공사관리와 산출물의 전산화를 위한 시스템은 부재한 실정이다. 현재 건설사업정보시스템(건설CALS)을 통해 하천공사에 관한 정보를 확인할 수 있으나 총 공사비, 참여업체 등 기본적인 정보만을 제공하고 있으며, 공정관리 및 예산정보에 관한 상세한 내역을 확인 및 관리할 수 있는 기능은 부재하다. 이러한 문제를 해결하고자 본 연구에서는 하천사업(공사)관리시스템의 필요성을 제시함과 동시에 우선적으로 하천사업 공종 표준화를 수행하고자 한다. 현재 건설공사표준품셈을 통해 건설공사의 공종을 확인할 수 있으나 '제2장 하천공사' 내에는 사석, 돌망태, 하천호안공에 관한 정보만을 담고 있다. 하천공사 공종 표준화를 진행하게 될 경우 공종별 공사 세부정보에 대한 관리가 가능해지며, 현재 하천을 관리 중인 국토교통부, 지방국토관리청 및 지자체 등 하천사업을 수행 중인 기관의 시스템 활용도를 제고할 수 있다. 하천사업 공종표준화를 위해 우선적으로 현재 건설공사표준품셈, 도로대장 전산화 입력지침 등기 수립된 지침 및 기준을 통해 건설토목공사 시의 공종을 조사·분석한 후, 하천공사 준공보고서 및 감리보고서 등 공사 관련 자료를 활용하여 하천공사에 주로 수행되는 공사들에 관한 종류를 도출하였다. 이후 건설토목공사 공종과의 비교·분석을 통해 하천공사에서 주로 수행되는 공종을 도출·표준화하는 작업을 진행하였다. 본 연구에서 제시한 하천사업 공종의 경우 향후 하천사업(공사)관리시스템 개발에 활용이 가능하며, 하천공사 관리의 효율성을 극대화할 수 있다.

  • PDF

Design Standard and Improvement Proposal of Slope (국내외 비탈면 설계기준 및 개선방안(설계안전율 중심으로))

  • Yu, Byeong-Ok;Song, Pyeong-Hyeon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.296-296
    • /
    • 2008
  • 국내 절토비탈면은 이상 기후 및 건설공사의 증대로 인해 증가하고 있는 추세이며 장마철 및 태풍으로 인해 비탈면의 붕괴로 많은 인명 및 재산피해가 발생되고 있는 실정이다. 국내에서 사용되고 있는 기존의 비탈면의 설계기준은 암반의 불연속면에 대한 조사를 실시하고는 있지만 주로 암반의 굴착난이도를 토층, 리핑암, 발파암으로 구분하여 각각의 비탈면 절취경사를 결정하여 사용하는 방법을 사용하였으며 이러한 기준은 단순히 암석의 강도를 기준으로 설정되어 있으므로 암석의 공학적 특성 즉, 암반내 불연속면 방향성, 연속성, 충진물질, 마찰각, 풍화속도 등의 영향으로 공용후 비탈면 구배의 재조정 및 보강이 빈번하다. 국내외 절토비탈면의 설계기준은 각 기관별로 산재되어 있었으며 비탈면에 대한 설계 및 시공 등에 관한 기준은 도로와 철도 설계기준에 일부 반영되어 있을 뿐 항만, 댐, 택지조성 등 기타 시설 설계기준에는 비탈면에 대한 기준이 마련되어 있지 않아 표준적인 비탈면 설계기준 및 유지관리지침이 등이 필요하였다. 이러한 문제점을 보완하기 위해 2004년부터 2006까지 한국시설안전공단, 한국도로공사, 대한주택공사가 협동으로 연구한 건설공사 비탈면 설계 시공 및 유지관리에 관한 연구의 결과로 2006년도에 "건설공사 비탈면 설계기준"이 수립되었다. 이 설계기준은 건설공사에서의 기존 상이한 기준들을 정리하고 동일화하는 작업을 수행하였으며 지반의 조사에서부터 대책공까지를 막나하여 정리하였다. 그러나 최근에 급격한 기후변화로 인한 비탈면붕괴 빈번함에 따라 과거 적용되어 왔던 이들 기준을 적용하는 경우, 특히 상부 토층 및 풍화암 구간에서 많은 설계안전율을 만족하지 못해 많은 보강을 수반해야 하는 문제가 발생되고 있어 그 원인에 대한 분석을 수행하고자 하였다. 2006년도 정리된 기준은 과거에 적용하여 온 유기시의 안전율 조건을 Fs > 1.1~1.2을 적용하였던 것을 Fs > 1.2로 통일하였으며 지하수위 조건은 지표면에 위치하도록 하였다. 지하수위 조건은 풍화암 및 토층의 경우, 과거 지표면에 -3m를 적용한 시기가 있었으나 지표면에 지하수위를 적용하는 것이 일반적인 해석방법이다. 이러한 결과의 원인을 검토해 보면 다음과 같다. 첫째, 풍화암 및 토층에 적용되어 온 지반강도 정수가 과거 적용한 값보다 최근에는 작아지는 경향을 보이고 있다. 둘째, 지하수위 적용문제로 현재 지표면에 지하수위를 두어 안전율을 감소시키는 문제로 이는 최근 들어 많은 연구기관에서 강우시 간극수압의 증가에 대한 연구가 활발하게 진행되고 있다. 그러나 침투수 해석은 현행 기준에도 강우의 침투를 고려한 해석을 실시하는 경우 FS > 1.3 적용하는 것으로 되어 있으나 대부분의 해석에서는 적용이 되지 못하고 있는 실정이다. 셋째, 안전율이 과거에 주로 적용된 Fs > 1.1에서 Fs > 1.2로 상향 조정되어 우기시의 설계안전율 만족시키지 못하는 문제이다. 그러므로 이러한 문제점을 개선하기 위한 검토가 필요하며 장기적으로 이에 대한 합리적인 기준을 개정하는 작업이 추후에 수행되어야 할 것으로 판단된다.

  • PDF

Establishing the Safety of the Hydrogen Industry Through the Revision of Domestic Liquefied Hydrogen Safety Standards (국내 액화수소 안전기준 제·개정을 통한 수소산업 안전성 확립)

  • Kim, Hyun-Jin;Song, Boe-Hee;Tak, Song-Su;Joe, Hoe-Yeon;Kang, Seung-Kyu
    • Journal of the Korean Institute of Gas
    • /
    • v.25 no.6
    • /
    • pp.98-105
    • /
    • 2021
  • Currently, the government's announcement of the Korean version of the New Deal Comprehensive Plan ('20.7.14), expanding the supply of hydrogen production and charging facilities, and major companies are rapidly building related facilities such as liquefied hydrogen plants and charging stations. However, safety standards for production, storage facilities, transportation, and utilization of liquefied hydrogen value chains in Korea are insufficient, and safety technologies and safety standards over the entire period of liquefied hydrogen are urgently needed. Accordingly, the Korea Gas Safety Corporation is trying to realize a safe hydrogen economy in Korea by enacting safety standards over the entire period, including liquefied hydrogen plants

해외건설공사 수행절차(9) - Converted Lump Sum Turnkey 계약방식

  • 해외건설협회
    • 월간 기계설비
    • /
    • s.223
    • /
    • pp.75-78
    • /
    • 2009
  • 전통적으로 주요 EPC(설계, 구매, 시공) 공사는 최초의 엔지니어링 작업(FEED : Front End Engineering Design)을 한 후, 경쟁입찰을 하여 총액계약(Lamp Sum)으로 공사를 수행했다. 최근에 EPC시공자의 위험부담을 줄이는 한편, 발주자는 경쟁적인 시공자를 확보할 수 있는 기회를 확대하면서 협상기간을 단축하교 조기착공을 위해, Lump Sum 가격을 늦게 결정하는 방법을 고려한다. CLST(Converted Lump Sum Turnkey)계약방식은 최초의 엔지니어링 작업을 한 후 경쟁입찰을 통해 1차 계약을 맺고(설계 및 특별 자재 공급에 대한) 공사를 수행하다 설계가 충분히 진행되고 핵심자재에 대한 견적이 입수되어 발주 가능한 시점 및 하도급사를 선정할 준비가 된 시점에서 1차 계약을 변경해 2차 계약을 맺는다. 2차 계약 시 1차 시 맺은 계약조건(직접공사비, 일반관리비 및 이윤, 최대한도 금액이 포함됨)을 기준으로 하되, 발주자가 Open Book 형식으로 공사비를 평가하고 재협상하여 Lump Sum 금액으로 전환해 합의한다. 이후 Lump Sum Tumkey 계약과 동일한 형식으로 공사를 수행한다.

  • PDF

Construction Progress Measurement System by tracking the Work-done Performance (내역물량 측정에 의한 건설공사진도율 산정시스템)

  • Choi Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.3 s.15
    • /
    • pp.137-145
    • /
    • 2003
  • The project control system based on the actual values of three objects shall be operated continuously in a timely manner. For collecting/tracking accurate actual performance data, a reasonable basis of measuring work performance and its related measuring methods are needed. Therefore, this research proposes a method of developing and operating the construction progress measurement system. The problem of the conventional method is the difficulty to construct control accounts and to define the basis of measuring the performance of each control account. Therefore, this research proposes the preferable, formal methodology that produces the progress value of the smallest work unit by surveying the installed quantities and estimates percent complete of groups of works or entire project by earned value concept. This research in connection with the hereafter research of the weight value of control accounts will contribute to apply in practice and to develop the scientific construction management technique in the construction industry. Further researches how to trend and forecast the project using the measured progress value are recommended for putting the prosed system of this research to practical use.