A Case Study on the Construction of Concrete Lining in Parallel with Blasting in a Long Tunnel (장대터널 굴착시 발파-라이닝 병행시공 사례연구)

  • Ryu Joung-Hoon;An Hyung-Jun;You Jin-O;Choi Byung-Hee
    • Explosives and Blasting
    • /
    • v.24 no.1
    • /
    • pp.39-48
    • /
    • 2006
  • The various alternatives to reduce the construction period and cost in the wide and long tunnel have been attempted recently. However, the concrete lining forming process after finishing tunnel excavation may delay construction period considering the specific conditions of the wide and long tunnel. The concrete lining is indispensible for the road tunnel. For this reason, the blasting-lining synchronizing study had been carried out to reduce construction period in the Gyea-Ryong Tunnel. Lining models were installed at four different distance conditions the floor of the tunnel. After model installation, hundreds of blasting vibration measurements and concrete material tests were performed to calculate the safe distance between blasting point and concrete lining form. The study also introduces a method which can obtain the better ability of construction by improving working environment with the ventilation and the relocation of tunnel equipments in the working places.

A Study on modular construction method in military facilities (모듈러 공법을 적용한 군시설공사의 개선방안에 관한 연구)

  • Park, Jae-Sig;Park, Tae-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.642-647
    • /
    • 2006
  • Recently Ministry of National Defense is reconstructing old facilities using modular construction method for enhancing soldiers' quality of living. In the future, the use of modular construction method is expected to be increased. But in beginning stage as ROK military facilities that was built by modular was not designed and constructed efficiently, problems for pilot projects need to be analyzed by phases and construction methods should be improved. For the maximized efficiency, design should be made to minimize on-site works, factory automation in an assembly plant should be installed for the better productivity, roads that will be used for transportation should be checked, and joint and connection methods between modules in on-site assembly should be improved for a better quality.

  • PDF

Effect of Alkali Activators on Early Compressive Strength of Blast-Furnace Slag Mortar (고로슬래그 모르타르의 초기 강도에 대한 알칼리자극제의 영향)

  • Moon, Han-Young;Shin, Dong-Gu
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.9 no.3
    • /
    • pp.120-128
    • /
    • 2005
  • In the construction industry, due to the cost rise of raw material for concrete, we have looked into recycling by-products which came from foundry. When using the Ground Granulated Blast-Furnace Slag(SG), it is good for enhancing the qualities of concrete such as reducing hydration heat, increasing fluidity, long-term strength and durability, but it has some problems : construction time is increased or the rotation rate of form is decreased due to low development of early strength. In this study, therefore, to enhance the early strength of SG mortar, we used some alkali activators(KOH, NaOH, $Na_2CO_3$, $Na_2SO_4$, water glass, $Ca(OH)_2$, alum. This paper deals with reacted products, setting time, heat evolution rate, flow and the strength development of SG cement mortar activated by alkali activators. From the results, if alkali activators were selected and added properly, SG is good for using as the materials of mortar and concrete.

Development of Decision Model and Management System to minimize Pavement Utility Cut for Road Facility (도로시설 재굴착 방지를 위한 의사결정모델 및 관리시스템 개발)

  • Cho, Jin-Young;Jang, Oun-Sung;Lee, Min-Jae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.164-171
    • /
    • 2013
  • In urban planning, road facility is used not only for the transportation purpose but also for the utility line space purpose such as electrical, gas, tele communication, heating, water, sewer, and so on. However, since these utilities are built by many different groups, it becomes very difficult to communicate each other. Delay in one party can cause another party's schedule delay but they don't commuicate often. Also, some delay in utility work can cause frequent pavement cut. And, this will impact on construction cost, schedule delay, low quality, user complain and cost. This study developed spatiotemporal decision model to prevent prequent utility cut for mega project such as new urban development project. In addition, this study developed utility cut management system to manage utility cut schedule under pavement. Finally, developed system was applied to new urban development project and verified there effectiveness.

An Administration Model for Causation of the Schedule Delays in Construction Projects (건설공사 공기연장사유 관리모델)

  • Kim, Jong-Han;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.3
    • /
    • pp.125-133
    • /
    • 2007
  • If project time extension were required in the construction projects, either liquidated damages or extension costs should be applied according to causation of the schedule delays. However, in actual cases it is not applied so far according to the contract conditions. The reason why this situation happened Is that function of the present planning and scheduling is not working feasibly. The CPM schedule could not provide a proper solution for apportioning responsibility for the schedule delays. This situation could be considered as breach of contract and will cause potential disputes for schedule delay. Therefore, in this research process based contract administration model for construction delay claim is proposed to prevent schedule delay and solve the claims. The model is based on pro-active management for causation of delay to provide apportionment of responsibility and written evidences.

Material Planning Model for Multi-Project Management in Medium-sized Construction Companies (중견건설업체의 다중현장관리를 위한 자재조달계획 지원 모델)

  • Jung Sung-Lim;Han Ju-Yeon;Kim Kyung-Rai;Shin Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.106-114
    • /
    • 2004
  • As the scale of construction work is enlarged, complicated and diversified, much construction information from the large number of construction sites is generated and reported to the head office. To control much information generated in construction sites simultaneously, the necessity of supporting system which could extract necessary information is increased. However, comparing with those of large companies, medium-sized companies's organization of head office and management system are weak. So it's difficult to manage multi-projects. Among these site managements, resource management is an important management area. But, resource planning is based on experience and judgement and has not associated with schedule information. So when schedule is changed, the plan must be amended manually. This study investigates material-planning model for multi-project management which is connected with daily report system and scheduling software.

The Effects of Optical Cable Fault on Customer Complaints (광케이블 고장이 고객 불만에 미치는 영향 연구)

  • Jung, So-Ki;Cha, Kyoung Cheon
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.40 no.2
    • /
    • pp.325-333
    • /
    • 2015
  • In this paper, we are aim to analysis the effects of optical cable fault on customer complaints. We considered several causes: the elapse time to allow repair from the optical cable fault, whether working day or not, seasonality and human error, external construction, optical cable cutting or core banding that is controllable causes and natural disasters, vehicle crash, fire that is uncontrollable causes. The results of analysis are as follows: First, customer complaints increase through indifferencial relationship when using the production function for the number of expected victims and elapsed time due to the optical cable fault. Second, not only the elapsed time but also controllable variables, human error, external construction, the core cut occurs, increased customer complaints due to optical cable faults.

The Development of 3-D System for Visualizing Information on Geotechnical Site Investigation (지반조사 정보의 3차원 가시화 시스템 개발)

  • 홍성완;배규진;서용석;김창용;김광염
    • The Journal of Engineering Geology
    • /
    • v.12 no.2
    • /
    • pp.179-188
    • /
    • 2002
  • With improving computer penormance and advancing simulation techniques, a growing number of softwares are being developed for visualization of investigation results in geotechnical problems. It is a very important subject for geological site investigation to understand or predict if there would be any hazardous geological conclition that might cause any increase of construction costs or an extension of construction period. A 3-D (three-climensional) visualization technique may be one of the powerful tools to overcome an uncertainty problem of geologica] site investigatior. The paper describes an overview of a newly developed geotechnical 3-D interpretation system for the purpose of applying the 3-D visualization technique, GIS (geographic information system) and D/B (database) to tunnel design and construction. VR (virtual reality) and 3-D visualization techniques are applied in order to develope the 3-D model of characteristics and structures of rock mass. D/B system for all the materials related to site investigation and tunnel construction is developed using GIS technique. This system is very useful for civil engineers to make a plan of tunnel construction at the design stage and also during construction with the advantage of improving the economy and safety of tunnels.

Economic Feasibility Analysis of a Tunnel Section Enlargement Method That Does Not Halt Traffic Flow (교통류 보존형 터널단면 확대 시공기술의 경제적 타당성 분석)

  • Lee, Seung Soo;Kim, Dong-Gyou;Seo, Jong Won
    • The Journal of Engineering Geology
    • /
    • v.25 no.4
    • /
    • pp.459-472
    • /
    • 2015
  • A recently developed tunnel section enlargement method can maintain traffic flow during construction by using a protector. By keeping traffic flowing, it can minimize the lost time and costs associated with diversions and also the accompanying environmental pollution. On the other hand, installing the protector can lengthen the construction period and increase the direct cost. This paper presents a method for analyzing the economic feasibility of tunnel section enlargement methods considering the direct construction cost and the indirect social cost. The indirect costs are divided into categories of: vehicle driving cost, travel time delay cost, and environmental pollution cost. The economic efficiency of existing technology is compared with the new method in an case study of Namsan Tunnel 3.

Analysis of time-series displacement using satellite SAR interferometry technique for Dam safety monitoring (댐 안전 관리를 위한 위성 SAR 간섭기법 활용 시계열 변위 분석)

  • Kang, Ki-mook;Hwang, EuiHo
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.440-440
    • /
    • 2022
  • 1970년대부터 집중 건설 된 우리나라의 다목적댐, 홍수조절댐, 용수전용댐 등의 대형 국가 수자원시설물들의 '고령화'가 급속히 진행되어 수리구조물에 대한 안정성을 주기적으로 파악할 수 있는 정밀안전모니터링 체계 구축이 시급한 시점이다. 주기적인 정밀안전모니터링 방법들 중에는 위성 등을 활용한 원격관측 기술들이 최근 시도되고 있다. 위성 영상레이더(SAR; Synthetic Aperture Radar)는 마이크로파 대역의 전자기파를 송·수신하는 능동센서로 날씨 및 주·야간에 영향을 받지 않고 지표면 관측이 가능한 장점이 있다. 특히, 고정산란체 영상레이더 간섭(PSInSAR; Permanent Scatterer Interferometry SAR)기법은 영상레이더 영상에서 긴밀도(coherence)가 상대적으로 높은 수자원시설물과 같은 고정산란체의 위상(phase) 정보를 이용하여 mm급의 측정민감도로 시계열 변위 분석이 가능하다. 또한, 여러 장의 InSAR 영상을 생성하였기 때문에 DEM 오차, 위성궤도 오차, 대기 성분에 의한 지연 오차 등을 보다 정밀하게 제거할 수 있는 장점이 있다 본 연구에서는 국내 중대형 수자원시설물의 정밀안전모니터링을 위하여 고정산란체 영상레이더 간섭 기법을 영암금호방조제, 영주댐, 소양강댐 등에 적용하여 시계열 변위 분석을 수행하였다. 2014년 11월부터 2022년 3월(현재)까지 획득된 Sentinel-1 SLC(Single Look Complex) 위성자료의 상승(Ascending) 궤도 126장 및 하강(Descending)궤도 187장을 각각 활용하였다. 두 위성궤도를 모두 활용하여 수직, 수평 변위 등 3차원 분석을 수행하였으며, 특히 소양강댐 GPS 관측 자료와 정확도 검증에서 연평균 2mm의 RMSE를 보였다. 이를 통해 위성 원격탐사 기술로도 댐, 보, 방조제와 같은 수자원시설물에 대한 시계열 변위 분석을 통한 댐 안전관리가 가능함을 보여주고 있다. 2025년 발사될 국내 C-밴드 SAR 탑재 수자원위성 개발을 통해 한반도 재방문주기를 단축시킴으로써, 한반도 전역의 수자원시설물 정밀안전진단체계 구축이 가능할 것으로 기대된다.