The various alternatives to reduce the construction period and cost in the wide and long tunnel have been attempted recently. However, the concrete lining forming process after finishing tunnel excavation may delay construction period considering the specific conditions of the wide and long tunnel. The concrete lining is indispensible for the road tunnel. For this reason, the blasting-lining synchronizing study had been carried out to reduce construction period in the Gyea-Ryong Tunnel. Lining models were installed at four different distance conditions the floor of the tunnel. After model installation, hundreds of blasting vibration measurements and concrete material tests were performed to calculate the safe distance between blasting point and concrete lining form. The study also introduces a method which can obtain the better ability of construction by improving working environment with the ventilation and the relocation of tunnel equipments in the working places.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2006.11a
/
pp.642-647
/
2006
Recently Ministry of National Defense is reconstructing old facilities using modular construction method for enhancing soldiers' quality of living. In the future, the use of modular construction method is expected to be increased. But in beginning stage as ROK military facilities that was built by modular was not designed and constructed efficiently, problems for pilot projects need to be analyzed by phases and construction methods should be improved. For the maximized efficiency, design should be made to minimize on-site works, factory automation in an assembly plant should be installed for the better productivity, roads that will be used for transportation should be checked, and joint and connection methods between modules in on-site assembly should be improved for a better quality.
Journal of the Korea institute for structural maintenance and inspection
/
v.9
no.3
/
pp.120-128
/
2005
In the construction industry, due to the cost rise of raw material for concrete, we have looked into recycling by-products which came from foundry. When using the Ground Granulated Blast-Furnace Slag(SG), it is good for enhancing the qualities of concrete such as reducing hydration heat, increasing fluidity, long-term strength and durability, but it has some problems : construction time is increased or the rotation rate of form is decreased due to low development of early strength. In this study, therefore, to enhance the early strength of SG mortar, we used some alkali activators(KOH, NaOH, $Na_2CO_3$, $Na_2SO_4$, water glass, $Ca(OH)_2$, alum. This paper deals with reacted products, setting time, heat evolution rate, flow and the strength development of SG cement mortar activated by alkali activators. From the results, if alkali activators were selected and added properly, SG is good for using as the materials of mortar and concrete.
Korean Journal of Construction Engineering and Management
/
v.14
no.4
/
pp.164-171
/
2013
In urban planning, road facility is used not only for the transportation purpose but also for the utility line space purpose such as electrical, gas, tele communication, heating, water, sewer, and so on. However, since these utilities are built by many different groups, it becomes very difficult to communicate each other. Delay in one party can cause another party's schedule delay but they don't commuicate often. Also, some delay in utility work can cause frequent pavement cut. And, this will impact on construction cost, schedule delay, low quality, user complain and cost. This study developed spatiotemporal decision model to prevent prequent utility cut for mega project such as new urban development project. In addition, this study developed utility cut management system to manage utility cut schedule under pavement. Finally, developed system was applied to new urban development project and verified there effectiveness.
Korean Journal of Construction Engineering and Management
/
v.8
no.3
/
pp.125-133
/
2007
If project time extension were required in the construction projects, either liquidated damages or extension costs should be applied according to causation of the schedule delays. However, in actual cases it is not applied so far according to the contract conditions. The reason why this situation happened Is that function of the present planning and scheduling is not working feasibly. The CPM schedule could not provide a proper solution for apportioning responsibility for the schedule delays. This situation could be considered as breach of contract and will cause potential disputes for schedule delay. Therefore, in this research process based contract administration model for construction delay claim is proposed to prevent schedule delay and solve the claims. The model is based on pro-active management for causation of delay to provide apportionment of responsibility and written evidences.
Korean Journal of Construction Engineering and Management
/
v.5
no.2
s.18
/
pp.106-114
/
2004
As the scale of construction work is enlarged, complicated and diversified, much construction information from the large number of construction sites is generated and reported to the head office. To control much information generated in construction sites simultaneously, the necessity of supporting system which could extract necessary information is increased. However, comparing with those of large companies, medium-sized companies's organization of head office and management system are weak. So it's difficult to manage multi-projects. Among these site managements, resource management is an important management area. But, resource planning is based on experience and judgement and has not associated with schedule information. So when schedule is changed, the plan must be amended manually. This study investigates material-planning model for multi-project management which is connected with daily report system and scheduling software.
The Journal of Korean Institute of Communications and Information Sciences
/
v.40
no.2
/
pp.325-333
/
2015
In this paper, we are aim to analysis the effects of optical cable fault on customer complaints. We considered several causes: the elapse time to allow repair from the optical cable fault, whether working day or not, seasonality and human error, external construction, optical cable cutting or core banding that is controllable causes and natural disasters, vehicle crash, fire that is uncontrollable causes. The results of analysis are as follows: First, customer complaints increase through indifferencial relationship when using the production function for the number of expected victims and elapsed time due to the optical cable fault. Second, not only the elapsed time but also controllable variables, human error, external construction, the core cut occurs, increased customer complaints due to optical cable faults.
With improving computer penormance and advancing simulation techniques, a growing number of softwares are being developed for visualization of investigation results in geotechnical problems. It is a very important subject for geological site investigation to understand or predict if there would be any hazardous geological conclition that might cause any increase of construction costs or an extension of construction period. A 3-D (three-climensional) visualization technique may be one of the powerful tools to overcome an uncertainty problem of geologica] site investigatior. The paper describes an overview of a newly developed geotechnical 3-D interpretation system for the purpose of applying the 3-D visualization technique, GIS (geographic information system) and D/B (database) to tunnel design and construction. VR (virtual reality) and 3-D visualization techniques are applied in order to develope the 3-D model of characteristics and structures of rock mass. D/B system for all the materials related to site investigation and tunnel construction is developed using GIS technique. This system is very useful for civil engineers to make a plan of tunnel construction at the design stage and also during construction with the advantage of improving the economy and safety of tunnels.
A recently developed tunnel section enlargement method can maintain traffic flow during construction by using a protector. By keeping traffic flowing, it can minimize the lost time and costs associated with diversions and also the accompanying environmental pollution. On the other hand, installing the protector can lengthen the construction period and increase the direct cost. This paper presents a method for analyzing the economic feasibility of tunnel section enlargement methods considering the direct construction cost and the indirect social cost. The indirect costs are divided into categories of: vehicle driving cost, travel time delay cost, and environmental pollution cost. The economic efficiency of existing technology is compared with the new method in an case study of Namsan Tunnel 3.
Proceedings of the Korea Water Resources Association Conference
/
2022.05a
/
pp.440-440
/
2022
1970년대부터 집중 건설 된 우리나라의 다목적댐, 홍수조절댐, 용수전용댐 등의 대형 국가 수자원시설물들의 '고령화'가 급속히 진행되어 수리구조물에 대한 안정성을 주기적으로 파악할 수 있는 정밀안전모니터링 체계 구축이 시급한 시점이다. 주기적인 정밀안전모니터링 방법들 중에는 위성 등을 활용한 원격관측 기술들이 최근 시도되고 있다. 위성 영상레이더(SAR; Synthetic Aperture Radar)는 마이크로파 대역의 전자기파를 송·수신하는 능동센서로 날씨 및 주·야간에 영향을 받지 않고 지표면 관측이 가능한 장점이 있다. 특히, 고정산란체 영상레이더 간섭(PSInSAR; Permanent Scatterer Interferometry SAR)기법은 영상레이더 영상에서 긴밀도(coherence)가 상대적으로 높은 수자원시설물과 같은 고정산란체의 위상(phase) 정보를 이용하여 mm급의 측정민감도로 시계열 변위 분석이 가능하다. 또한, 여러 장의 InSAR 영상을 생성하였기 때문에 DEM 오차, 위성궤도 오차, 대기 성분에 의한 지연 오차 등을 보다 정밀하게 제거할 수 있는 장점이 있다 본 연구에서는 국내 중대형 수자원시설물의 정밀안전모니터링을 위하여 고정산란체 영상레이더 간섭 기법을 영암금호방조제, 영주댐, 소양강댐 등에 적용하여 시계열 변위 분석을 수행하였다. 2014년 11월부터 2022년 3월(현재)까지 획득된 Sentinel-1 SLC(Single Look Complex) 위성자료의 상승(Ascending) 궤도 126장 및 하강(Descending)궤도 187장을 각각 활용하였다. 두 위성궤도를 모두 활용하여 수직, 수평 변위 등 3차원 분석을 수행하였으며, 특히 소양강댐 GPS 관측 자료와 정확도 검증에서 연평균 2mm의 RMSE를 보였다. 이를 통해 위성 원격탐사 기술로도 댐, 보, 방조제와 같은 수자원시설물에 대한 시계열 변위 분석을 통한 댐 안전관리가 가능함을 보여주고 있다. 2025년 발사될 국내 C-밴드 SAR 탑재 수자원위성 개발을 통해 한반도 재방문주기를 단축시킴으로써, 한반도 전역의 수자원시설물 정밀안전진단체계 구축이 가능할 것으로 기대된다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.