Performance Management through Time-Cost Integration in Construction Project (비용-일정 통합관리를 통한 건축공사 실적관리)

  • Kim Dong-Jin;Lim Hyoung Chul;Choi Jung Suk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.379-382
    • /
    • 2001
  • In domestic construction industry, time and cost has been managed separately in most cases. Usually projects are managed focused on cost, so time is not yet managed systematically. Project performance in these managemental situation can not be assessed correctly. This would cause project delay, cost overrun, productivity loss. Therefore it is needed to adopt earned value concept, an approach used in the management and control of project costs and schedules. Using this EV concept through time-cost integration, project can be managed properly based on the consistency, predictability, and reliability of the performance data. This paper proposed time and cost integration process, proper PMT method, and practical performance management model through time and cost integration.

  • PDF

원자력발전소의 증기발생기 교체

  • 서두환
    • Nuclear industry
    • /
    • v.16 no.2 s.156
    • /
    • pp.42-46
    • /
    • 1996
  • 원자력발전소의 증기발생기 교체는, 대형원자력기기의 교체공사로서, 현재로서는 가압경수로형 원자력발전로(PWR)에 대한 보수대책의 하나로 정착되어 있는 조치이다. 증기발생기 교체는 현재 미국$\cdot$일본$\cdot$독일$\cdot$프랑스$\cdot$스웨덴$\cdot$스위스$\cdot$벨기에 등의 23기 플랜트가 공사한 실적이 있다. 우리나라도 고리 1호기(587 MWe)와 고리 2호기(650 MWe)의 증기발생기를 97년경에 교체할 계획으로 있다.

  • PDF

법령과 고시 ② - 지방계약법 시행령 및 시행규칙, 지방계약예규 개정

  • 대한기계설비건설협회
    • 월간 기계설비
    • /
    • s.307
    • /
    • pp.69-69
    • /
    • 2016
  • 지방계약법 시행령 개정을 통해 공사 분야의 최저가낙찰제가 과도한 가격경쟁을 유발함에 따라 300억원 이상인 공사입찰의 경우 국제표준에 맞게 시공실적, 기술능력, 시공품질 등을 종합적으로 고려하여 낙찰자를 선정하는 종합평가낙찰제로 전환하고, 지방재정 조기집행 활성화를 위하여 계약이행 대가의 지급기간을 단축했다. 또한 지방계약예규 개정을 통해 주계약자공동도급 시 주계약자가 선금 수령일로부터 5일 이내에 부계약자에게 지급토록 하였다.

  • PDF

A study on Standardization of Monthly Work Process Report Information (월간공정보고정보 표준화에 관한 연구)

  • Jeong, Seong-Yun
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2008.05a
    • /
    • pp.417-418
    • /
    • 2008
  • 월간공정보고는 건설공사를 수행하는 동안 공종별로 매월 공사의 진척사항과 집행금액을 계획대비실적으로 파악하는데 필요한 정보를 포함하고 있는 문서이다. 본 연구는 정해진 구성항목과 속성에 따라 공정보고 내용을 디지털화할 수 있도록 월간공정보고에 대한 정보표준안을 마련하였다. 공정보고 업무의 효율화를 위해 정보표준안을 기초로 한 공정보고시스템 개발과 함께 현장 적용성 검토를 위한 시범 적용과 사용자 만족도를 실시하였다.

Cost index for residential buildings (공동주택 건설공사비지수)

  • Lee, Dong-Hyun;Koh, Young-Beom;Ruy, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.289-294
    • /
    • 2006
  • Residential buildings industry hold lots of portions in Korean construction. Accurate cost index for Residential buildings is required to understand trends of prices of the constructions and to manage budget for them effectively. So Korea Institute of Construction Technology has issued a cost index for residential buildings every six months. However It hasn't been improved although It can't reflect the actual circumstance. So we are supposed to make a new cost index for residential buildings based on statistical data extracted from bills of quantity at three different projects.

  • PDF

Empirical Study for the Appraisal System of Execution Capacity using Correlation Analysis (상관관계분석을 이용한 시공능력평가 제도의 실증적 고찰)

  • Jeong, Keun Chae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.2
    • /
    • pp.3-14
    • /
    • 2018
  • The system to appraise the execution capabilities of construction companies had been began as the Construction Contract Restriction System in 1958, was changed as the Construction Subcontract Restriction System in 1961, and finally has been operated as the Appraisal and Public Announcement of Execution Capacity (APAEC) from 1996. The APAEC system has been utilized as a firm and unique tool for assessing the execution capacities of construction companies despite many problems and continuous system changes. In spite of numerous studies to improve the APAEC system, however, efforts to analyze the system from the empirical point of view were insufficient. In this study, we analyze the status of APAEC system through analyzing correlations among assessment results of the APAEC, earned values of construction works, construction management performance indexes, and macroeconomic indexes for the past 10 years from 2007 to 2016. As a result of the analysis, it was found that Appraisal Value of Execution Capacity (AVEC) is excessively inflated in engineering and landscaping areas compared to Earned Value of Construction Work (EVCW) and the correlations between the AVECs and EVECs are not high in the areas of engineering, industrial equipment, and landscaping. In addition, technical appraisal values are excessively inflated in engineering and landscaping areas and correlations between AVEC and its components are high in the areas of engineering & building, industrial equipment, and large companies, but low in the areas of engineering, building, landscaping, and small and medium companies. Finally, the concentration of the AVEC is intensifying more and more and the concentration deteriorates construction management performance indexes and macroeconomic indexes. If we continuously improve the APAEC system based on the implications derived in this study, the APAEC system will be able to maintain it's position of a firm and unique means to access the execution capacities of construction companies.

건산법시행령.시행규칙 입법예고-(입법예고기간 : 2007. 9. 5일 ~ 9.27일)

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.10 s.207
    • /
    • pp.35-38
    • /
    • 2007
  • 건교부는 일반.전문건설업간 겸업을 허용한 건설산업기본법 개정의 후속조치로 마련한 건산법 시행령 및 시행규칙 개정안을 지난 9월 5일 입법예고하고 9월 27일까지 의견수렴 기간을 거쳐 본격 개정에 들어가 내년부터 적용할 계획이다. 개정안은 겸업제한에 관한 특례에 따라 기계설비의 설치와 관련된 업종은 4년간 유예하는 내용을 포함하여 내년부터 일반.전문건설업간 겸업이 허용됨에 따라 본격화될 교차 진출 때 과거 공사실적의 인정기준이다. 또한 2009년 7월 시행이 예정도니 단순복합공사의 원도급 허용범위와 지난 8월 발표된 건설업 등록 때 기능인력 보유 의무조항 등과 함께 내년에 별도의 입법을 통해 추진된다. 이와 함께 개정안에는 건설공사 부실, 부조리에 대한 제재 강화 조항도 포함됐다. 이 중 기계설비공사업과 관련된 내용만 발췌하여 게재한다.

  • PDF

A Study on the Estimation of Elemental Costs for an Apartment Building (공동주택에 대한 부위별 공사비 산정에 관한 연구 - 사례 H사의 실행단가를 중심으로 한 연구 -)

  • Kang, Hyun-Wook;Yoo, Jong-Hwan;Kim, Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.2
    • /
    • pp.173-181
    • /
    • 2007
  • The purpose of this study is to estimate elemental costs of an apartment building. The adapted research method includes a case study from $^{\circ}{\AE}H^{\circ}{\phi}$ construction company. The results of this study are as follows: 1) An elemental cost format of an apartment building is proposed, 2) An elemental cost table based on a case study of $^{\circ}{\AE}H^{\circ}{\phi}$ construction company is suggested.

공청회

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.7 s.192
    • /
    • pp.39-43
    • /
    • 2006
  • 건설산업 선진화를 위한 건설생산체계 개선 공청회가 지난 6월 30일 국토연구원 강당에서 개최되었다. 국토연구원이 주최하고 대한건설협회, 대한설비건설협회, 대한전문건설협회가 후원한 이번 공청회는 향후 건설산업기본법의 개정(안)과 건설산업관련 제도개선에 활용 방안을 도출하기 위하여 마련된 것으로 김재영 국토연구원 선임연구위원이 주제발표를, 김수삼 한양대학교 대외협력부총장이 토론회 진행을 했으며, 최기원 삼건설비(주) 대표이사를 비롯하여 손태락 건설교통부 건설경제팀장, 김명수 가톨릭대학교 경제학과 교수, 유주현 (주)신한건설 대표, 이교선 한국건설기술연구원 수석연구위원, 이상호 한국건설산업연구원 건설정책연구실장, 천길주 현대건설(주) 상무, 황한석 (주)삼중엔지니어링 대표 등이 토론자로 참석하여 열띤 토론을 벌였다. 이날 토론회에서 대한설비건설협회 측 토론자로 나선 삼건설비(주) 최기원 대표는“겸업제한 폐지 등 기존 건설산업기본법의 틀을 근본적으로 바꾸는 것보다 현행법 내에서 제도개선 방안을 강구하는 것이 바람직하나, 정부방침에 의거 겸업제한제도를 폐지할 경우 상대적으로 약자인 설비건설업계를 위한 발주제도를 개선하는 방안 강구가 필요하다”고 강조했다. 최기원 대표는 또“기계설비공사의 경우 상호 실적을 인정해서는 안될 것이며, 실적인정과 관련한 혼선을 최소화하고 문제점 발생시 보완 및 조정을 위한 한시적 조정위원회 설치”를 제안했다. 이와 함께 건설공사 발주방식의 다양성 확보에 대한 의견으로 발주할 때 일반건설업자로 제한해서는 안되며, 다양한 공종과 업종의 건설공사는 통상적으로 전문분야 또는 업종에 따라서 분리발주를 의무화해야 한다고 강조했다. 이날 공청회에서 대한설비건설협회는 플로어 발언을 통해‘설비공사 분리발주를 원칙으로 하고 분리발주가 안될 경우 설비∙전문간의 공동도급으로 원도급시장 참여를 법적으로 보장할 것과 시공관리형 CM업을 신설하여 줄 것’을 건의했다. 건설교통부는 이날 공청회에서 논의된 방안을 중심으로 의견수렴을 거쳐 오는 12월 정기국회서 건설산업기본법을 개정하고 2007년 3월 시행령 등 정비안을 마련할 계획이다. 건교부는 또한 정비안을 바탕으로 다시 업계의 의견을 듣고 내년 상반기중 시행령 및 규칙 등을 개정한 뒤 5~6개월 유예기간을 거쳐 이르면 2008년부터 생산체계 개선방안을 시행한다는 방침이다. 본지는 이날 발표된 건설생산체계 개선방안과 대한설비건설협회의 의견을 게재한다.

  • PDF

Algorithm for Freight Transportation Performance Estimation on Expressway Using TCS and WIM Data (TCS 및 WIM 데이터를 활용한 고속도로 화물수송실적 산정 알고리즘 개발)

  • Youjeong Kang;Jungyeol Hong;Yoonhyuk Choi
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.22 no.3
    • /
    • pp.116-130
    • /
    • 2023
  • Expressways play pivotal roles in cargo transportation because of their superior accessibility and mobility compared to rail and air. On the other hand, there is a limit to the accurate calculation of cargo transportation performance using existing highways owing to the mixture of vehicle types and difficulty in identifying cargo loads of individual cargo vehicles. This paper presents an algorithm for calculating more reliable cargo transportation performance using big data. The traffic performance (veh·km/day) was derived using the data collected from Toll Collecting System. The average tolerance weight for each vehicle type and the cargo load unit (ton/unit) considering it was calculated using vehicle specification information data and high-speed and low-speed axis data. This study calculated the cargo transportation performance by section and type using various online integrated highway data and presented a method for calculating the transportation performance by linking open business offices and private highways.