• Title/Summary/Keyword: 공사비 정보

Search Result 378, Processing Time 0.029 seconds

BIM Application for Civil Engineering Project in Planning and Design Phases (토목공사 기획 및 설계단계의 BIM 적용방안 연구)

  • Kang, Leen-Seok;Kim, Seol-Gi;Kim, Hyeon-Seung;Moon, Hyoun-Seok
    • Journal of KIBIM
    • /
    • v.1 no.1
    • /
    • pp.26-31
    • /
    • 2011
  • Due to the characteristics of 3D objects of building construction projects which have regular, vertical and repetitive shapes, the most practical utilization of BIM in the country is focused on building projects. The characteristics of 3D objects of civil engineering project have irregular, horizontal and non-repetitive shapes. Therefore, consisting of a practical BIM model is difficult comparing with building project. This study suggests an application process of BIM for the planning and design phases for civil engineering project. A BIM system is developed based on suggested BIM process and it is verified through a bridge construction project.

Effectiveness Analysis of Variable Speed Limit Systems(VSL) in Work Zones based on Meta-analysis (메타분석을 이용한 공사구간 가변속도제한시스템(VSL) 효과분석)

  • Jo, Young;Youn, Seok-min;Oh, Cheol
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.15 no.4
    • /
    • pp.91-103
    • /
    • 2016
  • The work zone traffic management is of keen interest because the unstable traffic stream in work zones leads to not only less productive traffic operational efficiency but also negative impacts on traffic safety. A promising method to address such issues is variable speed limit systems(VSLS). VSLS is expected to increase in throughput and to enhance safety by diminishing the crash potential. In addition, the usefulness of VSLS has been demonstrated by significant amount of existing literature. The objective of this study is to identify the effectiveness of VSLS based on a meta analysis technique. Throughput and travel speed were used as measures of effectiveness for VSLS in terms of the operational efficiency and safety respectively. Results showed that approximately 16.4% increase in throughput and 16.5% decrease in travel speed were obtainable by VSLS. The outcomes of this study would be useful in developing technologies and polices for better operation of VSLS.

Construction of Ontology for River GeoSpatial Information (하천공간정보의 온톨로지 구축방안 연구)

  • Shin, Hyung Jin;Shin, Seung Hee;Hwang, Eui Ho;Chae, Hyo Sok
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2015.05a
    • /
    • pp.627-627
    • /
    • 2015
  • 기존 물관련 시스템들은 독자적인 DB 구조를 가지고 있고 검색 서비스는 자체 시스템의 DB를 직접 접근하여 사용자에게 결과를 제시하는 형식이다. 이러한 서비스의 단점은 사용자가 개별 시스템의 서비스에 대한 지식이 없으면 접근하기 어렵다는 점이다. 개별 시스템의 개별 서비스의 개념을 벗어나기 위하여 물관련 시스템에 있는 하천공간자료 검색 정보를 카탈로그 서버에 등록하고, 카탈로그 서버에 등록된 검색정보를 사용자가 검색하는 방식을 적용하고자 한다. 카탈로그 서버에 자료에 대한 정보를 등록할 때 자료의 정보를 어떻게 기술할 것인가의 문제가 발생한다. 개별 서버마다 등록하게 된다면 용어 및 문화에 의한 차이로 같은 개념을 다른 용어로 등록하게 되는 혼란이 발생할 소지가 있다. 예를 들어 강우자료에 대하여 "강우", "Precipitation", "Railfall", "비" 등으로 등록할 소지가 있다. 이러면 실제 자료가 존재하는 데도 등록 방법에 따라 자료의 검색이 어려워진다. 이러한 상황을 제어하기 위하여 검사어휘(Controlled Vocabulary)를 도입한다. 이는 포털의 운영자가 미리 용어의 개념과 용어의 분류체계를 설정하고 등록 자료의 검색어를 미리 설정하여 자료의 원천 소유자가 자료를 등록 시 검사어휘를 참고하여 등록하거나 또는 등록되지 않는 용어의 자료인 경우 이 용어를 포탈에 신규로 등록한다. 검색용어의 난립을 피하기 위하여 사용자의 신규등록은 포탈의 운영자가 어느 정도 제어할 필요가 있다. 검사어휘의 정립과 하천 관련된 분류체계는 하천공간정보 검색의 포탈을 위한 필수사항이다. 검사어휘의 정립의 주된 목적은 이질성의 극복이다. 이질성의 종류는 문법적 이질성, 데이터 형식과 구조 및 문맥적 이질성이 있다. 이 중에서 문맥적 이질성이 가장 넓고 어려운 문제이다. 단위는 분야마다 호칭이 다르고 채택하는 기준마다 다르다. 유사어는 전문용어라도 분야마다 다르다. 우리나라에서 서비스 인코딩시 국어와 영어를 어떻게 처리할 지에 대한 대책도 필요하다. 수문학의 시계열 자료를 다루는 CUAHSI/HIS의 온톨로지는 대 개념으로 물리학적, 화학적 및 생물학적인 분야로 분류하고 있다. 하천공간정보의 온톨로지 구축을 위해 데이터 분석 및 분류, 온톨로지 요소 설정, 온톨로지 데이터 테이블 작성, 클래스 생성 및 계층화, 클래스 계층화에 따른 속성 설정, 클래스에 적합한 개체 삽입, 논리 관계 확인 및 수정과 같은 과정으로 온톨로지 개발을 진행하고자 한다.

  • PDF

A study on progress measurement method of a construction project (건설공사의 진도율 산정 방법에 관한 연구)

  • Park se-Jung;Kim Soo-Yong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.450-453
    • /
    • 2003
  • It is very important to examine and compare initial plan with earned value repeatedly in construction. For this purpose, progress measurement, which reflects the actual progress correctly, is required and it is necessary that accurate field data should be offered. To measure the progress, the entire project mutt be divided into unit works that have an accurate scope of work, and required information must be distributed to the all parties. Under the circumstances of domestic construction industry which focus on the specifications, progress measurement needs to reflect the information of schedule as well as cost that includes the quantity of unit work and construction expenses. Therefore this research proposes weighted method of progress measurement based on the information of cost and schedule.

  • PDF

BIM based Integration Method of Cost and Schedule Information (BIM기반 비용.일정 통합관리 방안에 관한 연구)

  • Jung, Do-Young;Baek, Yuong-In
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.321-325
    • /
    • 2008
  • 3D and BIM technology are presumed to be used more and more in the construction industry. The scope of this paper arose from a general wondering of how the constructor in general can benefit from the use of 3D models. Presented herewith is the first application of BIM in Korea to a actual bridge construction site located in Cheongpoong in Chooncheongbook-Do. This paper tries to integrate design, cost and schedule under location-based conditions with industry-specific solution for 3D modeling. 292 activities constitute the cable-stayed bridge of 442m long with a main span of 327m long. Integration of 3D model, cost and schedule is shown by comparing the measurements of works at a specific time by use of 2 different construction sequencing scenarios and cost breakdown structures.

  • PDF

Development of Quantity Take-off Algorithm for Irregularly Shaped Structures using 3D Object (3D기반 비정형 토목구조물 물량산출 알고리즘 개발)

  • Ha, Cheol-Seok;Moon, So-Yeong;Moon, Hyoun-Seok;Kang, Leen-Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.2
    • /
    • pp.655-666
    • /
    • 2014
  • Recently, as the appearance and exterior design of the construction structure are highlighted, the irregularly shaped structures are increasing in a construction facility. Many softwares provide a quantity take-off function of 3D object under BIM environment, however, they are focused on the limited function based on the solid modeling method. Because the vast geometric information of the curved surface is difficult to extract in the 3D objects that consist of major changes in vertical section shape as the irregularly shaped structures, it is difficult to express a 3D object as a solid model. On the other hand, the irregularly shaped structures can be expressed in relatively free in the surface model because the surface model consists of points, lines and surfaces. Accordingly, the surface modeling method is suitable for the modeling of large irregularly shaped structures. This study suggests a quantity take-off algorithm for the irregularly shaped structures using the surface modeling approach that is beneficial in the design work of structures. Some case projects are used for verifying the accuracy of the proposed method.

Improvement Efficiency of Tunnel Work using Site Surveying System (현장측량시스템을 이용한 터널공사의 효용성 향상)

  • Choi, Seok-Keun;Ahn, Won-Tae
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.14 no.3 s.37
    • /
    • pp.31-37
    • /
    • 2006
  • The existing tunnel survey method contains many problems of taking much measuring time, increasing construction expenses, and delaying a term of construction. Therefore the site survey system for an improvement efficiency is developed. This system will be able to solve the ewer factor and the problem of curtailment of time and expenditure. In order to solve these problems it connected a measurement equipment and a notebook computer, and developed the system which simultaneously with tunnel measurement it will be able to decide locations and errors from site at real-time. The development or the tunnel survey system minimize the error occurrence as measuring tunnel, and the probability of more or less excavation. Therefore this site survey system leads to the effect of the improvement execution quality of work, the cost reduction and the construction term reduction.

  • PDF

The Common Temporary Work Management System Using Historical Database (실적 데이터베이스를 활용한 공통가설공사 관리 시스템 개발)

  • Park Kyoung-Ho;Lee Hoon-ku;Baik Jong-Keon;Kim Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.367-370
    • /
    • 2002
  • The Elements of common temporary work in Construction Project have ambiguous work scope between client and builder. Also problems of non-breakdown, non-standardization in common temporary work are obstructive when contract. Finally they will be reached claim factors on the construction project. Because the common temporary work information management system is not built, We have to develop common temporary work information management system based on historical cost database for Construction Management. This system will successively accomplish the project in pre-construction step to standardize work items and to forecast the cost of common temporary work. Therefore feasibility study will be possible with historical database in new project.

  • PDF

An Analysis of Factors Affecting the Amount of Long-term Repair Allowance Used and the Amount of General Repair Cost Used in Apartment Houses : Focused on the Bidding Construction Cost of Apartment Houses in Busan (공동주택의 장기수선충당금 사용액과 일반보수비 사용액에 영향을 미치는 요인 분석 : 부산시 공동주택의 입찰공사비를 대상으로)

  • Lee, Chan-Ho
    • Journal of Industrial Convergence
    • /
    • v.20 no.5
    • /
    • pp.1-9
    • /
    • 2022
  • Today, apartment houses account for a very high proportion of the types of residence. This study analyzed the difference between the bidding construction cost using the long-term repair allowance and using the general repair cost, and analyzed the difference of factors affecting the amount of use of these two items. For this purpose, related data on apartment housing complexes located in seven representative districts of Busan from 2017 to 2021 were collected and analyzed from the apartment housing management information system. As a result of statistical analysis, the type of bidding variable had the greatest negative(-) effect on the bidding construction cost, and the next factor that affected was different between the amount of long-term repair allowance used and general repair cost used. In addition, there was a difference in statistical significance in the type of bidding by construction year for the number of bidding works between the case of using the long-term repair allowance and the case of using the general repair cost. The results of this analysis will help to find ways to reduce bidding construction costs. However, it is expected to find additional meaning by including more detailed variables such as technical ability.

A Study on Automated Reinforcement Detailing for Reinforced Concrete Structures Using BIM (BIM 기반 철근콘크리트 구조물의 자동 배근 모델 생성)

  • Park, U-Yeol;Yun, Seok-Heon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.4
    • /
    • pp.507-515
    • /
    • 2024
  • Recent advancements in Building Information Modeling(BIM) have significantly impacted the construction industry, driving competitiveness and innovation. However, rebar construction, a critical component influencing project quality and cost, has lagged behind in BIM adoption. Traditional methods relying heavily on 2D drawings for rebar detailing have hindered efficiency and introduced potential errors. This paper presents a novel system designed to automate the detailed modeling of rebar, thereby promoting BIM integration within rebar construction and optimizing construction management processes. The system leverages confirmed structural drawings from the post-structural design phase to automatically generate intricate rebar models for columns and beams. To ensure adherence to domestic structural design standards, the system is developed using C# programming language and the Revit API. By automating rebar modeling, this system aims to minimize human error, reduce labor-intensive tasks, and enhance overall rebar construction efficiency through the effective utilization of generated rebar model data.