The Journal of the Convergence on Culture Technology
/
v.8
no.5
/
pp.547-552
/
2022
In this study, shape-based track management by analyzing track irregularity was studied in terms of force-based track irregularity analysis by numerical analysis of wheel-rail interaction force using by the measured vertical irregularity. The effect of the vertical irregularity of the track due to the difference in track types on the wheel-rail interaction force and the track acceleration in the connecting section of the sleeper floating track and the direct fixation track on concrete bed were analyzed. As the results of this study, the measured vertical irregularity was directly affect the vertical wheel load (the wheel-rail interaction force) and the rail acceleration, and it has been demonstrated to change consistently. In this study, the adequacy and necessity of the force-based track irregularity analysis method was verified based on the wheel-rail interaction analysis using the the measured vertical irregularity.
The Magazine of the Society of Air-Conditioning and Refrigerating Engineers of Korea
/
v.31
no.6
/
pp.35-39
/
2002
최근, 산업의 발달로 인하여 생활수준이 향상되어 대량생산과 대량소비현상이 발생하고 도시의 밀집도가 높아 단위 면적당 거주하는 인구가 증가되면서 거주지역에서 발생되는 부산물이 현저히 증가되어 환경측면에서 복합적인 환경문제에 직면해 있다. 최근까지 대책마련에 고심하고 있는 도시에서 발생된 다량의 쓰레기 처리문제는 경제적인 측면에서 몇 년 전 까지는 대부분을 매립에 의존해 왔으나, 매립 방식에 의존하였으나 지가 및 공사설비의 상승, 일부 비위생적으로 조성된 매립장에서 배출되는 침출수 및 악취 등의 환경오염이 심각한 사회문제로 대두되면서 매립장의 확보나 증설은 해당 지역주민의 반발로 지방자치단체의 골치 아픈 과제로 등장하였다. 이러한 문제점을 보완하기 위해, 최근에는 매립지 확보의 어려움과 환경보존을 위하여 쓰레기를 정적이고 위생적으로 처리하기 위하여, 소각시설이 표 1과 같이 증가하고 있으나 소각 때 발생하는 다이옥신 등 인체에 치명적인 오염을 유발시키기 때문에 소각로 건설에 대한 환경운동단체와 주민들의 반발이 거세게 제기되고 있는 현실이다. 이러한 영향에 의해 앞으로는 소각보다는 쓰레기 자체를 감량.재사용.재활용하는 처리방식이 표 1과 같이 증가되는 현실이다. 쓰레기를 소각하는 것은 제 2오염을 유발시키고, 소각장 건설비용과 유지관리에 많은 예산이 소요된다. 쓰레기소각장을 건설할 때, 인근주민이나 환경단체로부터 반대의견에 직면하게 되는데, 그 사유는 쓰레기 처리과정의 전 단계인 반입.공급 과정에서 악취발생과, 후단계인 소각설비에서 발생되는 배출가스 오염원을 완전히 제거하라는 것이다. 최근에는 소각장의 설계.시공과정에서 최대한 악취발생과 확산을 억제하는 시설에 투자를 하고 있으며, 또한 주민 편익 시설과 부대 복리 후생시설은 소각시설 주변지역 주민틀의 소각시설에 대한 부정적 이미지를 불식시키며, 외부 방문객이나 운영 관리 요원들에게 쾌적한 환경조성과 업무효율 및 근무환경의 개선에 일익을 담당하고 있다. 본 고는 환경 친화적인 쓰레기 소각장을 설계하는 측면에서 1998년도에 턴키방식으로 발주되었고 2001년 12월에 준공하여 운전하고 있는 경기도 구리시 자원회수시설의 환기설비에 적용된 설계 및 시공개념을 소개하고자 한다.
Proceedings of the Korea Water Resources Association Conference
/
2023.05a
/
pp.85-85
/
2023
유량 측정을 위해 도섭법, 횡측선법 등의 인력에 의한 방법이 적용되고 있으나, 이는 야간 및 휴일 측정, 인력 부족 등 여러 제약으로 인해 고수위 홍수를 측정하는 데에 한계가 있다. 이를 해결하기 위해 시공간적 제약이 없는 도플러 방식 초음파유속계(Acousitc Doppler Velocity Meter, ADVM)와 자동유속관측시스템(Portable Automatic Velocity Observation System; PAVOs)이 제안되었다. 이 방법들은 교량에 설치된 장치를 통해 실시간으로 유속이 계측되어 시공간적 제약이 없으며 홍수 관리에 유용하게 사용될 수 있다. 실시간으로 계측된 유속 데이터는 오·결측 값이 발생하며 ADVM의 경우 수위-유량관계식을 활용하는 등 전처리 방법이 활용되고 있지만 전자파표면유속계를 활용한 PAVOs 데이터의 전처리 방법에 대한 연구는 부족하다. 따라서 본 연구에서는 PAVOs에서 실시간으로 계측된 유속 데이터의 전 처리 과정(Pre-processing)을 개발하였다. PAVOs를 통해 측정된 데이터는 5분 단위로 10개의 유속이 한번에 측정되며 비정상성(Non-stationary)인 특징을 가진다. 이 데이터의 전처리 과정으로 오·결측값에 대한 처리 및 보간법 적용 이후 10개 값 중 실제 유속을 판단하고 잡음제거(Denoising)를 수행하였다. 이를 강원도 홍천강에 위치한 홍천교에서 계측된 유속 데이터에 적용하였다. 그 결과 데이터의 상승부와 하강부에서 일정한 경향성을 파악할 수 있다. 이 데이터를 통해 산정한 유량과 실측 기반의 평균유속과 관계를 통해 계산한 유량을 비교해 보았을 때 낮은 편차율을 가지는 것을 확인하였다. 전 처리 된 실시간 유속 데이터를 활용한다면 최고수위가 발생하였을 경우 홍수량을 산정할 수 있을 것이다. 또한, 강우 또는 하천 공사에 의해 변동하는 수위-유량관계곡선식을 실시간으로 개발할 수 있을 것이며 이는 효과적인 홍수관리에 큰 역할을 할 수 있을 것이다.
Proceedings of the Korea Water Resources Association Conference
/
2020.06a
/
pp.415-415
/
2020
국내 농업용수 수요량 산정에 있어서 논벼 수요량은 수정 Penman (Modified Penman: MP) 방법에 의한 증발산량을 기반으로 산정하고 있으나, 최근 국제식량농업기구 (Food and Agriculture Organization of the United Nations: FAO) 및 국내 농진청 등에서는 Penman-Monteith (PM) 방법에 의한 증발산량 산정방법을 채택하고 있다. 따라서 본 연구에서는 논벼 수요량 산정에 있어 우리나라 실제 현장여건에 적합한 논벼 증발산량 산정 방법을 제안하고자 기존에 적용하고 있는 MP 방법과 최근에 국내외적으로 제안되고 있는 PM 방법에 의한 논벼 수요량 산정 결과를 실질적으로 벼 생산에 공급된 저수지 공급량 자료와 비교 분석을 통해 현장 적용성을 평가해 보았다. 이를 위해 본 연구에서는 농진청에서 PM 증발산량 작물계수를 도출한 현장실험지구를 포함하는 호남지역을 대상으로 저수지 100 만톤 이상의 한국농어촌공사 관리지역 중 농업용수 공급량 자료가 신뢰성 있는 대표지구를 선정하였다. 농업용수 실제 공급량 자료를 기반으로 두 증발산량에 의한 논벼 수요량 산정 결과를 비교 분석한 결과, MP 방법에 의한 수요량이 PM 방법에 의한 수요량 보다 높게 나타났으며, 따라서 MP 방법에 의한 수요량이 PM 방법에 의한 수요량 보다 농업용수 공급량과의 차이가 작게 나타나는 경향을 보였다. 대체적으로 강우량이 적은 지역에서 농업용수 공급량 및 논벼 수요량이 높게 나타났으며, 이러한 결과는 공급량과 수요량간의 관계에도 영향을 미쳐 강우량이 많은 지역에서 강우량이 적은 지역에 비해 농업용수 공급일수가 감소함으로써 공급량과 수요량과의 차이가 적어지는 경향을 보였다. 본 연구 결과로 농업용수 공급량을 기준으로 논벼 수요량 산정에 있어 증발산량 산정방법은 안정적인 농업용수 공급계획과 수리시설 설계에서의 이수안전도 확보차원에서 MP 방법을 채택하는 것이 더 바람직 할 것으로 사료된다. 추가적으로 논벼 수요량 산정은 증발산량 산정방법 외에도 유효우량 산정방법, 수로손실, 재배관리손실 등의 다양한 관련 인자들의 영향을 받기 때문에 증발산량 산정방법과 더불어 이들 인자들에 대해서도 종합적인 평가를 실시하여 논벼 수요량 산정 결과의 신뢰성 확보가 요구된다.
KSCE Journal of Civil and Environmental Engineering Research
/
v.43
no.6
/
pp.801-809
/
2023
Road construction projects have a long duration so cost overruns and schedule delays are occurred. However, performance assessment system that can manage and prepare for this in advance is insufficient. In addition, road construction are affected by many factors during under construction. Therefore it is necessary to conduct performance assessment considering the characteristics of roads and prepare for similar projects in the future. The purpose of this study is to provide a framework to evaluate construction phase performance and present a performance management plan using road construction information. Also, This study conducted time adjustment between the start and the finish of the project and developed performance metrics based on absolute and relative indicator. This study analyzed the cost, schedule, and changes of the road project construction process, showing the possibility of advancement of performance assessment and how to use it when planning new road construction projects.
Journal of the Korea Institute of Building Construction
/
v.23
no.6
/
pp.673-682
/
2023
This study investigates the delay in setting characteristics of mortar influenced by variations in super retarding agent(SRA) content, curing temperature, and strength levels. Utilizing a settimeter, the research introduces an objective approach to accurately determine the setting time of concrete with SRA under diverse environmental and material mixing conditions at construction sites. The findings indicate that the settimeter, in conjunction with a nonlinear regression model, can effectively estimate the setting time of super retarding mortar. Optimal management of the initial setting is recommended at approximately 45ST and the final setting around 80ST. This methodology enables more effective quality control in the setting times of super retarding concrete.
Journal of the Korea institute for structural maintenance and inspection
/
v.11
no.2
/
pp.103-108
/
2007
A stress measurement method of structural member using piezoelectric property and electrostatic voltmeter is presented. The electric potentials of the surface of the piezoelectric element, which are proportional to the strain ${\varepsilon}$ on the structural member, are measured by an electrostatic voltmeter during load cycling. The stress ${\sigma}$ is calculated by this strain ${\varepsilon}$. Moreover, a stress distribution measurement tape which can be used for the stress distribution measurement along a specified line on the surface of structural member is developed, and the surface potential was measured by an electric static voltmeter of non-contact type. The applicability of the stress distribution measurement tape is examined through experiments using a notched specimen under cyclic loading. The measured distributions of x, y and xy are compared with those calculated by FEM analysis.
Journal of the Korea institute for structural maintenance and inspection
/
v.13
no.4
s.56
/
pp.107-115
/
2009
The number of railway tunnel design is increasing recently compare to a great number of highway tunnel design which had increased with a lot of highway construction in the 70's and 80's. Therefore, there is more or less difference of time between highway tunnel and railway tunnel. In this paper, numerical analysis on two kinds of tunnels, such as two-forked road highway ventilation tunnel and double track railway tunnel with 4.3m of center line, in cases of with support materials condition and without support materials condition were conducted. Finally, stability of two kinds of tunnels were compared and analyzed through comparing of principal stresses and deviator stresses in the near base rock of tunnels using results of numerical analysis.
Kim, Seon-Gyoo;Noh, Seong-Beom;Lee, Yong-Hyun;Yu, Young-Jeong;Kim, Jin-Bong;Koo, Jae-Oh
Korean Journal of Construction Engineering and Management
/
v.13
no.2
/
pp.120-127
/
2012
Today, most construction projects have been higher, bigger, and more complicated gradually. So the domestic construction companies have been trying to understand overall construction process and relationships between activities, and adopted various management techniques and tools in order to perform a systematic and effective scheduling. However numerous problems have been occurred on the practical applications because most existing scheduling softwares adapt ADM and PDM techniques. One of them, PDM, is so uneffective because it represents the overlapping relationships between two consecutive activities only by the combinations of start and finish points between two activities. In order to supplement the demerit of PDM, Beeline Diagramming Method(BDM) is proposed as a new networking technique, it can represent two-way multiple overlapping relationships between two activities directly. However there are occurring a loop phenomenon on applying two-way multiple overlapping relationships. This research proposes and verifies the schedule computation method of two-way multiple overlapping relationships on the BDM network.
KSCE Journal of Civil and Environmental Engineering Research
/
v.36
no.3
/
pp.573-586
/
2016
In construction jobs, a combination of various kinds of machinery is used to perform earthworks at a large-scale site. Individual equipments essentially cooperate with each other on task such as excavation, load, transfer and compaction. While other area have studied cooperation system, related study in domestic construction is in poor condition. In this study, construction equipment fleet management system is developed for solving this problem and find way to improving efficiency in earthworks site. The entire concept of the fleet management system, including its components and process, has been systematically outlined in this paper. An operational methodology has also been suggested, where a number of machines, such as the excavators, trucks and compactors, are chosen and further grouped into a cluster. A case study verify fleet management system's effectiveness on performing task package by comparing existing work method with methodology in this study. Fleet management system in this study is expected to curtail fuel consumption by the reduction of working time and moving distance. Furthermore, it can be anticipated to declining carbon emission effect.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.