Approximate Estimating Model Using the Case Based Reasoning - PSC BEAM Bridge - (사례기반추론을 이용한 개략공사비 산정모델 개발 - PSC BEAM교를 중심으로 -)

  • Kang, Chan-Sung;Lee, Geon-Hee;Kim, Kyoung-Min;Kim, Kyong-Ju
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.445-448
    • /
    • 2008
  • This study attempts to estimate approximate cost on construction of PSC BEAM Bridge using Case-Based Reasoning and suggests approximate estimation model at the planning and design stage. This paper suggests phased influence factors on construction cost and approximate estimation model for integrated project cost management.

  • PDF

A Study of Improvements in the Standards of Cost Estimate for the New Excellent Technology in Construction (건설 신기술의 원가산정기준 개선방안에 대한 연구)

  • Lee, Ju-hyun;Tae, Yong-Ho;Baek, Seung-Ho;Kim, Kyoungmin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.5
    • /
    • pp.65-76
    • /
    • 2022
  • The New Excellent Technology (NET) designation system, introduced in 1989 for the purpose of promoting the development of domestic construction technology and enhancing national competitiveness, reviews the statement of construction cost of new technologies. And the cost reduction effect such as design, construction, and maintenance cost and the effect of reducing the construction duration are evaluated as an evaluation criteria of economic feasibility. However, in this evaluation process, differences of opinion between the institution of construction cost estimating standard management and the new technology developer about unique technologies frequently occur. In addition it is difficult to objectively compare the construction duration with existing similar technologies because there is no information on productivity as the current cost estimating standards for new technologies only present the required amount per unit quantity. In this study, the current state of cost estimating criteria review procedure, evaluation criteria, and cost estimating standards establishment method were analyzed when screening for the designation of a new construction technologies, and compared with overseas cost estimating standards, measures to improve the cost estimating standards of current construction new technologies were suggested. Through the improved cost estimating standards of this study, it is expected that cost information on new technologies will be provided to clients in more detail than the current ones, and the availability and applicability of new construction technologies would be improved by simplifying the construction cost calculation process more.

Cost Estimation Model Framework of Road Construction Project through Quantity of Standard Work (대표물량을 활용한 도로공사 개략공사비 산정모델 프레임워크)

  • Kwak, Soo-Nam;Kim, Du-Yon;Han, Seung-Heon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.607-612
    • /
    • 2007
  • Early cost estimation promote efficient budget plan by comparing alternatives and presenting cost information However it is hard to predict accurate cost because of vague cost standard and lack of available information in the early stage. The precious cost model has limitations in the accuracy because they are simple linear model which uses the unit cost per kilometer. This study presents the framework of early cost estimation for road construction projects to overcome the limitation of previous cost model. This study analyzed domestic and foreign cost model and cost data of previous road construction project to present method of cost model framework.

  • PDF

An Analysis on the Revision Factors of Construction Cost Calculation Criteria through Field Survey of Waterproof Work (방수공사 현장시공실태에 따른 공사비산정기준 개정요인에 관한 연구)

  • Oh, Jae Hoon;Ahn, Bang Ryul
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.10
    • /
    • pp.468-477
    • /
    • 2019
  • This study analyzed the major contents and results of revision through an analysis of the specifications and the field survey to revise the construction cost calculation criteria. The result of the survey found that the background processing difficulty was reduced due to an improvement of the quality level of the field floor, and the enhancement of the material's function brought a decrease in construction time and the application of various construction methods. In addition, the application of combined waterproofing methods using more than one material was increasing and the productivity differed according to the site and location. Based on these results, waterproof items were subdivided and applied to the composite construction method, and the input items were differentiated according to the material and construction method. The adequacy of the construction calculation criteria was ensured by presenting the criteria classified according to the construction area, and deleting the items that are not applicable and amending them to make them suitable for the specifications by reflecting the actual conditions of the construction on the site.

A Criterion for Estimating Supervision Cost Considering the Change Factors by Construction Works (공사별 변동요인을 고려한 적정 감리대가의 산정기준 연구)

  • Lee, Bae Ho;Kang, Leen Seok;Lee, Yang Gyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.14 no.5
    • /
    • pp.1199-1208
    • /
    • 1994
  • In the country, supervision cost is being estimated by percentages of construction cost or cost plus a fixed fee without a reasonable standard. This type has no function for adjusting supervision cost according to variables, such as construction work complexity, extent of supervisory services, fluctuations in prices. In this study, an objective criterion to estimate supervision cost with improved supervisory services has been developed, in which adjusting functions as stated above should be properly considered. A comparative study of supervisory service systems in foreign countries and a survey through questionnaire were carried out for the study. An objective criterion from the results is proposed in the form of an expression or table.

  • PDF

The Improvement of Tunnel Construction Cost Standards Considering the Site Conditions in Korea (현장실태를 고려한 국내 터널공사 공사비산정기준 개선)

  • Ahn, Bang-Ryul;Lee, Han-Soo;Oh, Jae-Hoon;Song, Tae-Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.8
    • /
    • pp.26-35
    • /
    • 2020
  • Tunnel construction is an important part of Korean public construction projects. Although the development of various equipment and technologies has led to advances in tunnel construction methods that are implemented on sites, the cost standards related to such works do not yet reflect the realities of the construction sites. A literature review and site surveys were conducted to suggest reasonable cost standards for tunnel work that reflects the realities of the field. First, each item in the cost standards for tunnel work, as established in the Construction Standard Production Rates, were analyzed. The results were compared with the actual costs implemented on tunnel projects. The key items analyzed included those regarding the work cycle time, such as rock classification, profiling survey, drilling speed, and muck-disposal processing equipment combination, as well as the number of people put to tunneling work. Based on the site survey results, improved estimates regarding the cycle time per one tunnel drilling blast, drilling speed of the machine, muck disposal processing equipment combination, and the number of people put to tunneling work were suggested. This study suggests the cost standards that reflect the realities of tunneling sites. The results are expected to help ensure adequate costs for tunnel construction projects.

A Study on the Construction of Computerized Algorithm for Proper Construction Cost Estimation Method by Historical Data Analysis (실적자료 분석에 의한 적정 공사비 산정방법의 전산화 알고리즘 구축에 관한 연구)

  • Chun Jae-Youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.192-200
    • /
    • 2003
  • The object of this research is to develop a computerized algorithm of cost estimation method to forecast the total construction cost in the bidding stage by the historical and elemental work cost data. Traditional cost models to prepare Bill of Quantities in the korea construction industry since 1970 are not helpful to forecast the project total cost in the bidding stage because the BOQ is always constant data according to the design factors of a particular project. On the contrary, statistical models can provide cost quicker and more reliable than traditional ones if the collected cost data are sufficient enough to analyze the trends of the variables. The estimation system considers non-deterministic methods which referred to as the 'Monte Carlo simulation. The method interprets cost data to generate a probabilistic distribution for total costs from the deficient elemental experience cost distribution.

A Study on the Estimation of Proper Construction Cost for Road Pavement Maintenance Work (아스팔트포장 유지보수 적정공사비 산정방안 연구)

  • Oh, JaeHun;Song, TaeSeok;An, BangYul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.6
    • /
    • pp.16-26
    • /
    • 2020
  • Road Pavement Maintenance Work is generated in a variety of different field conditions, and it is difficult to calculate the construction cost because there are no detailed criteria when preparing the estimated construction cost. Unlike new pavements, Road Pavement Maintenance has to be constructed with operating vehicles, and there are many differences in productivity depending on urban areas, limited work hours, night-time, construction area, etc. To compensate for this, the standard for calculation of construction cost provides additional charges for the number of lanes, residential areas, working hours, and night work, but it applied differently depending on construction officials. In this study, construction cost estimation standards that can properly reflect the conditions of the site was investigated for major types of Road Pavement Maintenance work. The site was investigated and analyzed mainly for many construction sites with 'overlay of asphalt after cutting', 'restore surface', 'repair of pavement', and 'recovery of roadway'. The criteria for the application of construction volume separately according to working hours, public places, and land area including extra charges for basic downtown and residential area. The hours of operation were divided into three types(7 hours, 5 hours, 3 hours) excluding movement and preparation time, and each type provided a coefficient for dividing the area of the construction site into five types. The construction cost calculation method based on the construction purpose is site conditions is proposed accordingly, and it is deemed that a plan for the designer to calculate the construction cost has been prepared in consideration of the site conditions.

Development of the Approximate Cost Estimating Model for PSC Box Girder Bridge based on the Breakdown of Standard Work (대표공종 기반의 PSC Box 교량 상부공사 개략공사비 산정모델에 관한 연구)

  • Kim, Sang-Bum;Cho, Ji-Hoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.2
    • /
    • pp.791-800
    • /
    • 2013
  • Needs for developing a better way of cost estimating process for public construction projects have been widely recognized. Those needs are mainly from the early phases of the project through the construction life cycle due to the its importance to the control process. In contrast to the traditional estimating method based on unit-price references, this research utilized this following process. The first step is analyzing the real cost data from actual cost activities (2000~2010) about the statement of P.S.C(Prestressed Concrete) Box Girder Bridge. The collected data was broken into four categories based on technical construction methods such as I.L.M(Incremental Launching Method), M.S.S(Movable Scaffolding System), F.S.M(Full Staging Method), and F.C.M(Free Cantilever Method). The second, actual design documents including the actual cost estimating documents, drawings and specifications were carefully reviewed to cluster the cost itemized statement from four categories. It was also attempted to seek the proper breakdown of standard works that are responsible for more than 95 percentage in each categories in terms of its cost. The third, this research comes up the index for standard unit materials and unit price of standard work and develops the approximate estimating model applying for the specification(length and breadth of bridges) per square area that the user takes as well as suggests the practical application plan within the original time alloted.

A Study on Considering Non-Working Days for Determination Normal Project Duration in the Railway Bridgework Construction (철도 교량공사의 적정공사기간 산정을 위한 비작업일 산정에 관한 연구)

  • Chae, Su Min;Lee, Sang Hyuck;Park, Hyung Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.41 no.5
    • /
    • pp.601-608
    • /
    • 2021
  • Recently, despite a decrease in the number of working days and an increase in the number of non-working days due to an increase in the abnormal climate and the revision of the Labor Standards Act, a standard construction period reflecting this has not been established. For this reason, even if the appropriate construction period is calculated at the site, there is a situation where delays occur due to unexpected circumstances. Therefore, this study proposes a method of calculating the number of non-working days for railway bridgework construction that reflects changes in construction conditions and climate change and reflects this to railway bridgework construction, and the number of working days was calculated. As a result, the number of non-working days by region and month in Korea was derived, and through this, the necessity of regulations and standards for appropriate construction periods reflecting regional characteristics and characteristics of each construction type was presented.