• Title/Summary/Keyword: 공사관리시스템

Search Result 936, Processing Time 0.024 seconds

A Study on the Cost Estimating Method based on Spatial Unit Focused on Improving Limitation Caused by Lack of Spatial Information of the Cost Based on Work Type (공간단위 공사비 산정방법에 관한 연구 - 공종별 공사비의 공간정보 부재로 인한 한계점 개선을 중심으로 -)

  • Lee, Ki-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.3
    • /
    • pp.131-139
    • /
    • 2011
  • In this Study, the Cost of Public Facility Construction in the VE Cost Model, and the Progress of the Construction Site Management, and Cost due to the Lack of Cpatial Information in Dispute Cost Work Type Recognize the limits of Historical Information, and to Overcome the Perception of Cost and Space Systems Unit In the Process of Transition that Began Seeking Ways to Improve Through this Study, Different Parts of the Proposed Area of Construction Work Unit System, the Core of Calculating Hourly and Detailed Engineering Information and Cost Information Generated Extension to Configure the Construction Unit in Every Space, Every Work Unit System, All Materials That Make Up Work Unit System, Unit Labor Costs, And All of the Configuration Items Enables Precise And Multidimensional Understanding is That.

Conceptual Cost Estimating System Development for Public Apartment Projects (공공아파트 프로젝트 기획단계 공사비 산정시스템 개발)

  • Lee, Hyun-Soo;Lee, Heung-Keun;Park, Moon-Seo;Kim, Soo-Young;Ahn, Jo-Seph
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.4
    • /
    • pp.152-163
    • /
    • 2012
  • At the conceptual phase of a construction project, estimated construction cost is very important as it significantly influences the owner's decision-making. Accurate cost estimating, in the early stage of a public construction project, serves as a critical factor because initial decision-making effects the final cost of a construction project. However in the cases of Korean public apartment projects, excluding a few of the public owners, there is a problem in properly estimating construction cost due to the lack of construction cost estimating system. Thus, this research developed a public apartment cost estimating system using case-based reasoning that was suggested by a previous research with 66 cases of Korean public apartment projects. Based on the system experiments involving 19 public officers and 10 cases of Korean public apartment projects, the effectiveness of the system in terms of estimation accuracy and user-friendly was confirmed. As a result, the developed system has an error range of 1.47% to 13.74% and mean of 6.15%. In addition, the system was evaluated that it could greatly improve the current estimation task of public officers. Consequently, the results of this research can be used as a foundation for a technological advance in estimating construction cost and improving the accuracy and consistency of construction cost estimation.

The Common Temporary Work Management System Using Historical Database (실적 데이터베이스를 활용한 공통가설공사 관리 시스템 개발)

  • Park Kyoung-Ho;Lee Hoon-ku;Baik Jong-Keon;Kim Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.367-370
    • /
    • 2002
  • The Elements of common temporary work in Construction Project have ambiguous work scope between client and builder. Also problems of non-breakdown, non-standardization in common temporary work are obstructive when contract. Finally they will be reached claim factors on the construction project. Because the common temporary work information management system is not built, We have to develop common temporary work information management system based on historical cost database for Construction Management. This system will successively accomplish the project in pre-construction step to standardize work items and to forecast the cost of common temporary work. Therefore feasibility study will be possible with historical database in new project.

  • PDF

Improving Constructability for Partnering in Large Hospital Construction Projects (대형병원 프로젝트의 시공성 증대를 위한 파트너링 모델 구축)

  • Kim Sang-Il
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.3 s.19
    • /
    • pp.153-165
    • /
    • 2004
  • Most engineering tasks require collaboration between many users in major hospital construction projects that have many reconstructions. Loss and change orders occurred in factors such as information exchange, misunderstandings, advanced technology in hospital projects. Moreover, changes in context, costs, requirements, deadlines, etc. require negotiation of issues that may modify important project characteristics. The objective of this paper is to reduce reconstruction for the pre-construction process of hospital projects, reconstruction factors were analyzed in recent hospital construction project the system was established in order to solve reconstruction factors, and this system was validated through applying to the real project. Therefore it is a major challenge to make high level of communication and to have mutual understanding.

Development of a Materials Management System Considering Construction Supply Chain Management (건설공급사슬을 고려한 건설공사 자재관리시스템 개발)

  • Jang, Myung-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.5
    • /
    • pp.87-93
    • /
    • 2009
  • A construction supply chain needs an integrated information system, as the general contractor and subcontractors must communicate regularly with one another and share a substantial amount of information in their cooperative work. In the construction industry, supply chain management is necessary in the management of a system, including business process improvement, participant-oriented management, and the supply chain. This research proposed a supporting system and developed the prototype focusing on materials that play an important role in the supply chain. Construction projects are managed mainly through schedule management. As such, supply chain management should be linked with schedule management. The research implemented a prototype of the supporting system for construction supply chain management. The prototype was implemented in Microsoft Project using VBA, including a simulation tool based on @Risk for Project.

Analysis of Floor Slab and Support for the Shortening of Construction Time in High-Rise Wall-Type Apartment Building (고층벽식구조 아파트에서 골조공사 공기단축을 위한 바닥 슬래브 및 지주의 해석)

  • Kim, Young-Chan;Kwon, Ki-Sang
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.6 no.1
    • /
    • pp.141-147
    • /
    • 2002
  • 국내 주거의 주종인 아파트의 구조형식은 벽식 철근콘크리트조로 경제성 때문에 대부분 고층으로 지어지고 있다. 철근 콘크리트구조 건물을 구체공사비중 상당부분이 거푸집공사에 투입되고 있다. 구체공사의 공기(工期)는 층당 소요일수로 산정할 수 있는데 공사비 절감 및 공기단축을 통한 시공효율상의 향상을 위해서는 지주시스템의 효율적인 전용(轉用)이 필수적이라 할 수 있다. 본 연구에서는 벽식구조 아파트의 현장조사를 토대로, 현재 사용되고 있는 지주시스템 및 바닥슬래브에 대한 응력해석을 수행하고, 이를 분석하여 공기단축의 가능성을 검토하였다.

Development of Maintenance Management Tool for Water and Waste-Water Maintenance Management (상ㆍ하수도 유지관리를 위한 유지관리 툴 개발)

  • 김기우;조성언
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2001.10a
    • /
    • pp.195-198
    • /
    • 2001
  • This paper has studied and developed a tool for water and waste-water maintenance management with which builds a database of various construction information and makes easier the report writing and data searching. The maintenance management for water and waste and water is a method and system to control a water and waste-water scientifically and structurally, and is also a combination system that connects water and waste-water construction companies with the related department of government, or local government by using a database. It has also analyzed problems on controlling method of an existing water and waste water, and explained functions to improve fallouts of a conventional system and expected effects when using the improved program.

  • PDF

A Development Of Network Infrastructure Design Aiding System For Underground Facilities Construction (지하시설구축시 필요한 관로설계프로그램(NIDAS) 개발)

  • Oh, Ik-Jin;Baik, Song-Hoon;Seo, Myung-Woo;Kim, Jin-Gwi
    • 한국정보통신설비학회:학술대회논문집
    • /
    • 2005.08a
    • /
    • pp.197-200
    • /
    • 2005
  • 도로에는 많은 종류의 지하시설물이 매설되어 있어 이에 대한 효율적인 관리를 위해 1995 년부터 국가적으로 국가지리정보체계 (NGIS:National Geographic Information System) 구축사업을 시작하였고, 많은 지방자치단체에서도 지하시설물 전산화를 통하여 시설물에 대한 DB 를 구축하여 전반적인 관리시스템을 갖추어 놓았다. 아울러 지하시설물 기관별로도 별도의 유지관리시스템을 구축하여 운용하고 있다. KT 에서도 TOMS(선로도면시설관리시스템: Telephone Outside-plant Management System)를 이용하여 도면전산 DB로 활용하고 있으며 이를 기반으로 TOPS (선로시설설계시스템:Telephone Outside Plant Design System)로 공사 설계를 하고 있다. 하지만 지하시설물로써 원초적인 관로에 대한 설계시스템은 도면의 hand drawing 작성방식으로 도시 한후 MS windows 환경의 excel로 설계함에 따라 설계시간이 많이 소요 되는 실정이다. 따라서, 본 프로그램의 개발은 KT 통신 network 구축에 필요한 맨홀 및 관로등의 지하시설물에 대한 공사설계의 툴로써 전산화 설계를 가능하게 하고 공사감리업무 종사자들의 업무환경 개선을 위해 개발 하였다.

  • PDF

A Study on the Application of Bridge Maintenance System using LoRa LPWAN Wireless Communication (LoRa LPWAN 무선 통신을 활용한 교량 유지관리 시스템 적용성 연구)

  • Park, Jin-o;Park, Sang-Heon;An, Sung-Ju;Park, Won-Joo;Kim, Jong-Hoon
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.23 no.1
    • /
    • pp.138-146
    • /
    • 2019
  • LoRa LPWAN network system uses a license-exempt wireless communication system and implements data measurement through the integrated sensor based on Mems and wireless communication of existing measurement sensors. This system has superior technological / economic superiority using existing network and long distance communication compared to existing wireless measurement system, and secured economical efficiency by minimizing system construction equipment compared to wired measurement system. It is confirmed that the economical efficiency can be reduced by 41% compared to the conventional wired metering system. Since the LoRa LPWAN network system is excellent in terms of maintenance and operation, if installed in many bridges in Korea in the future, it will be developed as an excellent system in the maintenance of bridges. Etc.), and plant field (fire safety, etc.).

Development of Integrated Work Breakdown Structure for Project Management Information System in Multi-Family House Projects (공동주택 건축공사의 효율적인 PMIS 운용을 위한 통합WBS 개발)

  • Park, Ji-Hyun;Shin, Joo-Yong;Kim, Hae-Gon;Hong, Tae-Hoon;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.801-804
    • /
    • 2007
  • Development of construction project management information system is accelerated because information management system has become more important by recent complicated and large-sized construction industry. There are many problems to operate PMIS efficiently because no standardized WBS exist in current. This study has identified the problems of WBS in building construction of multi-family house projects with 4 public and private organizations by interviews and compared each WBS. From those facts, this research presents the integrated WBS and the improved application form in PMIS.

  • PDF