• Title/Summary/Keyword: 공사관리시스템

Search Result 936, Processing Time 0.03 seconds

Development of a Cash Flow Forecasting Model for Housing Construction (공동주택 공사의 현금흐름 예측 모델 개발에 관한 연구)

  • Jang, Joo-Hwan;Kim, Ju-Hyung;Jee, Nam-Yong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.3
    • /
    • pp.257-265
    • /
    • 2012
  • Many construction companies are simultaneously carrying out numerous projects in the housing construction industry. It is essential to accurately forecast the cash flow of a project through optimal process management and resource input in order to manage funds rationally and enhance the competitiveness of a company. Current cash flow forecasting methods offer lower accuracy due to a large gap between the revenue and expenditure element. Expenditure elements depends on the real-time changing actual cost for work performed. This research survey was conducted on the actual state of construction management of K company to investigate the problems of cash flow forecasting. To achieve this, the work process and construction management system were integrated to improve the cost management system of K company. To accurately forecast the cash flow of a project, revenue and expenditure elements were displayed in the total cash flow forecast window. This research is expected to assist in the implementation of a system of cash flow forecasting on housing construction by excluding negative elements of revenue and expenditure.

Study on the Build of HydroG-Server for Providing River information (하천정보 제공을 위한 HydroG-Server 구축 연구)

  • Shin, Hyung Jin;Chae, Hyo Sok;Hwang, Eui Ho;Hong, Sung Soo
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2015.05a
    • /
    • pp.140-140
    • /
    • 2015
  • 하천정보는 관리기관이 다양하고 정보의 표현, 분석단위가 관리 주체에 따라 다르다. 하천정보의 체계적이고 종합적인 정책자료 분석 및 제공 기능의 부재로 인한 이수, 치수, 하천환경 등의 국가수자원종합계획 수립의 어려움이 있다. 하천 및 유역정보의 관리단위를 일원화하여 국가적으로 표준화 하고 유역정보와 수문정보 등에 대하여 공동활용 기반을 마련하여 하천정보의 유기적인 공동이용을 추구할 필요가 있다. 다수의 물관련 기관 시스템들이 독립된 정보체계에서 개발되고 개별적인 진화를 하고 있다. 이로 인하여 시스템 연계의 어려움이 발생하고 있으며 이들 문제점을 완화하기 위하여 하천관련 간편한 Keyword 검색으로 사용자 맞춤형 하천정보(수위 및 유량 등 수문자료, 하천지형자료 등) 제공이 가능한 네이버 및 구글형 하천포털 시스템을 개발해야 한다. 본 연구에서는 하천정보자료 제공 기관별 자료를 공유하기 위한 HydroG-Server는 공간정보 데이터 모델(GDM)의 형태로 구축된 하천 공간 정보의 저장 및 공간정보 검색 및 제공을 위한 웹서비스인 HydroG-OneFlow를 공간정보 제공 프로토콜(HydroGML)을 통한 정보 게시 기능을 갖도록 구축하였다.

  • PDF

A Study on the Analysis of Delay Claim Risk in Apartment Housing Projects (공동주택공사에서의 공기지연 리스크분석에 관한 연구)

  • Kim Jae-Wook;Woo Kwang-Min;Lee Hak-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.217-221
    • /
    • 2003
  • This study proposes a new classification system and analysis methodology for time delay risk of apartment projects. And this study proposes the classification of major trades and risk level and risk index by performing expert-oriented interview and survey report on a national scale. The purpose of this study is to present basic data for time delay risk management system through the analysis of risk level, risk index and rank of major 5 trades(earth work, structure work, masonry work, window and door/glass work, and interior finish work) in apartment projects.

  • PDF

The Application of Data Warehouse for Developing Construction Productivity Management System (건설생산성 관리 시스템 구축을 위한 데이터웨어하우스의 적용)

  • Oh, Se-Wook;Kim, Myoung-Ho;Kim, Young-Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.2 s.30
    • /
    • pp.127-137
    • /
    • 2006
  • Productivity is important to evaluate an efficiency of performed work and organization in construction industry. The productivity should be defined as activity level rather than macro level in order to effectively use productivity data and manage a project. The primary objective of this study is to develop a construction productivity management system using data warehouse, OLAP and data mining technologies which enables to easily accumulate the construction productivity data and perform multi layer analysis. Finally, it is anticipated that the effective use of the developed system would be able to measure the result of project and make a plan of the similar project with reliability.

Development of Design Support System to Optimize the Temporary Work (강교량 설치 가설공사의 최적화설계 지원시스템 개발)

  • Cho, Hun-Hee;Park, Jae-Woo;Cho, Moon-Young;Kim, Jung-Yeol
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.115-123
    • /
    • 2005
  • Design of steel $bridge^{\circ}AEs$ temporary works has conducted relying on the experiences of engineers based on the previous similar projects. Consequently, there have been arguments against over-design of temporary bents to be required at the actual construction sites, and unnecessary design changes have been issued at the construction stage. In this study, we have developed an optimum design support system for temporary works of the steel bridge construction through establishing the database for the materials to be needed for implementation of temporary works. We've also improved the accuracy and efficiency of the works through the design optimization for temporary works, and contributed to reduce design changes as well as to utilize the design informations at the construction stage.

Integrated Management System of Construction Documents and Drawings by Construction Information Classification System (건설정보 분류체계에 의한 설계도서 통합 관리 방안)

  • Seo Jung-Hun;Park Seong-Sik;Kang Leen-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.589-592
    • /
    • 2003
  • Our government suggested an integrated construction information classification system (CICS) for improving construction information exchange between project participants. However, because a database for integrating construction documents and drawings is insufficiently built, there are many restrictions in using CICS. Therefore, this study suggests a methodology to integrate and manage the construction documents and drawings by CICS. The methodology suggested in the study is verified to a web-based construction documents and drawings management system with integrated DB.

  • PDF

Deployment of Lean System for Effective Lean Construction Implementation (효과적인 린 건설 수행을 위한 린 시스템 운용 방안 제시)

  • Kim, Dae-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.152-159
    • /
    • 2005
  • Since Lean Construction has been introduced as a new management approach to improve productivity in the construction industry, much research is in progress to develop lean concepts and principles for better implementation and to get results of the successful adaptation of lean ideas from manufacturing for application in the construction industry. Currently, Lean Construction Institute developed Last Planner System to achieve better workflow and effective planning management. Domestic construction companies are also getting interested in the Lean Construction. However, there are no detailed guidelines how to implement lean system. Thus, this study will provide a guideline for deployment of last planner system, a prototype lean implementation control checklist, and all project participants roles based on the case studies in USA. This study should provide a framework to apply lean construction to domestic construction sites.

A Study on Design of Metadata Management Demonstration System for damage prediction from storm and flood (풍수해 피해예측지도 메타데이터 관리 시범 시스템 설계에 대한 연구)

  • Lim, So Mang;Baeck, Seung Hyub;Hwang, Eui Ho
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2017.05a
    • /
    • pp.472-472
    • /
    • 2017
  • 재해로 인한 피해가 급증함에 따라 이를 예방하기 위한 풍수해 피해예측의 필요성이 증가하였고 관련된 다양한 연구가 진행되고 있다. 타 부처 및 각 지자체에서는 각종 재해지도들을 작성하여 만들어진 재해지도는 작성 유형과 방법 등에 따라 다양한 데이터와 서로 다른 정보를 포함하고 있어 데이터 정보를 표준화 시키고 필요한 정보를 효율적으로 찾아 연계 활용하기 위하여 본 연구를 수행하고자 한다. 메타데이터란 데이터에 대한 정보를 의미하며 데이터 변화의 근원과 변화의 흐름을 말한다. 메타데이터 관련 표준으로는 ISO19115(국제표준), KSXISO19115(국가표준), TTAS.KO-10.0139(유통목록 표준), TTAS.IS-19115(관리용 표준)이 있다. 본 연구에서는 국제표준을 준용하여 풍수해 피해 예측지도의 체계적 관리를 위한 메타데이터 설계 및 관리 시스템 구축 방안을 제시하고자 하였다. 풍수해 피해예측지도 메타데이터 관리 시범 시스템 구축을 위한 표준, 정보의 특성, 사용자 수준 등을 고려하여 설계 기본방향 설정하였으며, 풍수해 피해예측지도 정보 메타데이터 표준안 수립에 반영하였다. 그 결과, 메타데이터 패키지는 총 9개의 섹션(클래스)으로 구성하여 정의하였고 하위개체를 설정 및 연계하여 메타데이터 개체셋 정보를 구성하였다. 풍수해 피해예측지도 메타데이터 관리 시범 시스템 설계 제시를 위해 DB항목 조사 및 도출, 데이터 연계 활용 모델 구축, 프로토타입 개발순으로 연구를 수행하였다. 또한 표출 대상 데이터 항목별 분류, 방재활용 단계, 지역구분 등을 주제로 데이터 Mapping 자료를 작성하였고, 설계 기본 방향에 의하여 설정된 기준으로 데이터 항목별 메타데이터 DB를 작성하여 풍수해 피해예측지도 메타데이터 관리 시범 시스템을 설계하였다. 본 연구 결과는 추후 풍수해 피해예측지도 표준 데이터 및 풍수해 피해예측지도 표준 데이터 모델 구축에 활용 가능하며 표준화 연계활용을 위한 연구에 기여할 것으로 판단된다.

  • PDF

Applying the Cloud Computing Technology for Mobile BIM based Project Management Information System (모바일 BIM 공사관리시스템을 위한 클라우드 컴퓨팅 기술 활용 방안)

  • Lee, Jong-Ho;Eom, Shin-Jo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.145-148
    • /
    • 2011
  • As a futuristic construction model, building information model(BIM) based project management system(PMIS) and mobile PMIS have been showing visible sign. However, researches on the 3D BIM based PMIS using mobile device are hard to find, result from limitation of mobile device application(slow speed at huge BIM file, display size, and etc.) and undefined standard of business processes. Therefore, this research aims at studying feasibility of mobile BIM PMIS based on cloud computing as a business model. In case of applying mobile BIM PMIS, 3D drawings and integrated building informations are possible on mobile devices in real time. it would support increasing the productivity of project participants as designer, engineer, supervisor, and etc. Globally, BIM based PMIS and Mobile BIM system, cloud computing based mobile BIM simulator are in the concept or experimental phase, therefore it is possible to secure global leading technology of IT and construction merger in the mobile BIM.

  • PDF