• Title/Summary/Keyword: 공법선정 모델

Search Result 42, Processing Time 0.024 seconds

The study of developing the freezing seal isolation method for the pre insulated heat transfer pipe (이중보온 열수송관에 대한 동결차수공법개발에 관한 연구)

  • You, Byounghee;Ahn, Changkoo;Kim, Woocheol;Shin, Ikho
    • Journal of Energy Engineering
    • /
    • v.26 no.3
    • /
    • pp.105-112
    • /
    • 2017
  • A lot of piping systems have been used from nuclear power systems to water supply systems. The maintenance of the piping systems is needed to ensure proper operation of the piping systems. Failure of the large pipe systems especially such as KDHC(Korea District Heating Corporation) can be a matter directly related to the enterprise productivity and profitability. It can also lead to very important issues in promoting public safety and convenience. Therefore a method of quick and safety repairs have been emerged as the most important problem. In this study, freezing seal isolation method using liquid nitrogen cryogenic refrigerant was developed for the maintenance of a pre insulated heat transport pipe of KDHC with a diameter of 300 mm. In this study, by employing computational analysis techniques we performed the flow and heat transfer analysis for the targeted pre insulated heat transfer pipe and freezing seal jacket(ice-Plug) and have selected for optimal system. The detailed design model based on the results of the computational analysis finally was produced. A laboratory-scale test apparatus were designed and the freezing seal isolation self-test carried out. Also the performance assessment tests in the test bed of KDHC were carried out for on-site application.

Finite Element Analysis for Transmission Tower Behavior Characteristic by Connection Beam Stiffness (수치해석을 이용한 송전철탑 연결형 기초의 연결보 강성에 따른 거동 특성)

  • Choi, YoungHo;Kyung, DooHyun;Lee, JunHwan
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.1
    • /
    • pp.219-227
    • /
    • 2013
  • This study analyzed the effect of performance connected-type foundations of behavior and the connected beams according to the characteristics into soft clay transmission tower foundation. For this purpose, the finite element analysis model was built and connected to the transmission tower foundation mat and the contact area of the connection beam by the percentage change in the behavior and resistance characteristics were analyzed and finite element verification of the validity of the analytical model was conducted using connected-type transmission tower results of the model experiments constructed, and effective connected-type transmission tower basis of the behavior of connected beams were selected by analyzing the effect due to the increase of the stiffness. In addition, weak analysis by connected beam self-bending moment distribution was conducted.

A Study on Brace-height Ratio for Seismic Retrofit of School Building (학교 건축물의 내진 보강을 위한 가새 - 높이비에 관한 연구)

  • Lee, Hwa-Jung;Byon, Dae-Kun;Yoon, Sung-Kee
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.24 no.4
    • /
    • pp.10-17
    • /
    • 2020
  • The recent earthquake in Korea caused large and small damages to many school building. School building is an important building that is used as a shelter in the event of disaster. Among the seismic retrofit methods, the internal steel braced frame type method is used for its relatively easy construction and excellent performance. In this study, the maximum shear force and displacement were compared and examined by applying the brace frame to existing concrete school buildings. As a result, we verified the adequacy of the analytical model and compared and examined the effect of brace-height ratio on the span of the existing school buildings. The adequacy of the maximum shear force and displacement relationship can be confirmed in the model with a length of 0.3. In addition, seismic frame was applied to the actual non-seismic reinforced concrete school building, and the seismic performance was evaluated by nonlinear static analysis(Push-over analysis) according to the ratio of brace-height. As a result, the increase of the brace-height according to the brace-height ratio has the effect of increasing the maximum shear force and maximum load at the performance point. But the collapse of the braced frame due to the increase in the lateral stiffness occurred, indicating that seismic retrofit according to the proper brace-height is necessary. Therefore, in the seismic retrofit design of brace frame of existing school building, it is necessary to select the proper brace-height after retrofit analysis according to the brace-height ratio.

A Study on the Settlement Prediction of Soft Ground Embankment Using Artificial Neural Network (인공신경망을 이용한 연약지반성토의 침하예측 연구)

  • Kim, Dong-Sik;Chae, Young-Su;Kim, Young-Su;Kim, Hyun-Dong
    • Journal of the Korean Geotechnical Society
    • /
    • v.23 no.7
    • /
    • pp.17-25
    • /
    • 2007
  • Various geotechnical problems due to insufficient bearing capacity or excessive settlement are likely to occur when constructing roads or large complexes on soft ground. Accurate predictions of the magnitude of settlement and the consolidation time provide numerous options of ground improvement methods and, thus, enable to save time and expense of the whole project. Asaoka's method is probably the most frequently used one for settlement prediction and the empirical formulae such as Hyperbolic method and Hoshino's method are also often used. To find an elaborate method of predicting the embankment settlement, two recurrent type neural network models, such as Jordan model and Elman-Jordan model, are adopted. The data sets of settlement measured at several domestic sites are analyzed to obtain the most suitable model structures. It was shown from the comparison between predicted and measured settlements that Jordan model provides better predictions than Elman-Jordan model does and that the predictions using CPT results are more accurate than those using SPT results. It is believed that RNN using cone penetration test results can be a highly efficient tool in predicting settlements if enough field data can be obtained.

The Effects of Nail Inclination in Soil Nailing by Finite Element Analysis (유한요소해석에 의한 쏘일네일링의 네일 경사각의 영향에 관한 연구)

  • 천병식;김원철;윤창기
    • Journal of the Korean Geotechnical Society
    • /
    • v.20 no.6
    • /
    • pp.19-27
    • /
    • 2004
  • Since the first construction of soil nailing in France in 1972, the application of soil nailing has increased. However, there is currently no design method which is universally accepted or agreed upon far soil nailed wall, because each of the design methods has different assumptions and, therefore, different approaches, moreover, since the suggested optimal inclination angles of nails are different by researchers. Therefore, the effect of nail inclination with soil nailing is analyzed by FEM. In this study, Finite element program SOILSTRUCT was applied for the effect analysis of nail inclination in soil nailed wall. For this finite element analysis, CEBTP No. 1 project data were used. The analyzed nail inclination ranged from 0$^{\circ}$ to 30$^{\circ}$ with 5$^{\circ}$ intervals. The result of finite element analysis showed that the most optimal inclination was 20$^{\circ}$ Also, the tension farce in the nails increased as the nail inclination increased. However, the effect of nail inclination on the wall deformation was very little. Therefore, constructability seems to be more important than nail inclination. Also, the tension force in the nails increases as the nail depth below the top of the wall increases, except f3r the lowest nail. Therefore, appropriate nail diameter should be used to prevent breakage of nails with considering nail strength-deformation interaction.

Model Tests on a Plastic Pipe Pile for the Analysis of Noise, Energy Transfer Effect and Bearing Capacity due to Hammer Cushion Materials (해머 쿠션 재질에 따른 모형말뚝의 소음, 에너지 전달효율 및 지지력 분석)

  • Lim, Yu-Jin;Hwang, Kwang-Ho;Park, Young-Ho;Lee, Jin-Gul
    • Journal of the Korean Geotechnical Society
    • /
    • v.22 no.12
    • /
    • pp.33-43
    • /
    • 2006
  • Driving tests using model plastic piles with different hammer cushion materials were performed in order to evaluate the efficiency of energy transfer ratio from the hammer, degree of vibration of the surrounding ground and noise due to impacting. A small pile driving analyzer (PDA) was composed using straingages and Hopkinson bar which is measuring force signal and pile-head velocity. The hammer cushion (cap block) materials used for the model driving tests were commercial Micarta, plywood, polyurethane, rubber (SBR) and silicone rubber. The highest energy transfer ratio was obtained from Micarta in the same soil and driving conditions. Micarta was followed by polyurethane, plywood, rubber and silicone in descending order. The more efficient energy transfdr ratio of the hammer cushion materials became, the bigger average noisy (sound) level was found. In addition, Micarta and polyurethane provided bigger bearing capacities than other materials compared in the same soil and driving conditions in which the static loading tests were performed at the end of driving.

Behavior of High-elastic Stress Absorbing Interlayer for Reflective Cracking Resistance (고탄성 응력흡수층의 반사균열 저항특성 연구)

  • Park, Tae Soon;Lee, Yo Seop
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.3D
    • /
    • pp.445-451
    • /
    • 2006
  • This study was conducted to develop the interlayer mixture that absorbs the stress between the old concrete pavement and the asphalt overlay pavement layer. The elasticity, the flexibility, the consistency and the impermeability is required for high-elastic Stress Absorbing Interlayer(HSAI) to absorb and disperse the stress that causes the flexural and horizontal movements of the joint and the crack. The HSAI developed from foreign product was satisfied with the design criteria. The specimens using the HSAI showed the significant reduction of the reflective crack compared those not using the HSAI. The significance included that the life of shear failure and horizontal displacement resistance increased 4 times. The life of the share failure increased to 5 times and the horizontal displacement increased to 9 times according to the selection of surface course material which showed the excellence of the HSAI.

A Study on Bridge Construction Risk Analysis for Third-Party Damage (교량공사 제3자 피해 손실에 의한 리스크 분석 연구)

  • Ahn, Sung-Jin;Nam, Kyung-Yong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.2
    • /
    • pp.137-145
    • /
    • 2020
  • The recent bridge construction projects demand thorough and systematic safety and risk management, due to the increase of risk factors following the introduction of new and complex construction methods and technologies. Among many types of damages that can occur in bridge construction projects, the damages to third parties who are not directly related to the existing property of the contractor construction project can also bring about critical loss in the project in order to compensate the damages. Therefore, risks that could be caused by the loss occurred to indemnify the third party damages should be clearly analyzed, although there are not subsequent amount of studies focusing on the issue. Based on the past record of insurance payment from domestic insurance companies for bridge construction projects, this study aimed to analyze the risk factors of bridge construction for loss caused to compensate the third-party damages happened in actual bridge construction projects and to develop a quantified and numerical predictive loss model. In order to develop the model, the loss ratio was selected as the dependent variable; and among many analyzed independent variables, the superstructure, foundation, flood, and ranking of contractors were the four significant risk factor variables that affect the loss ratio. The results produced can be used as an essential guidance for balanced risk assessment, supplementing the existing analysis on material losses in bridge construction projects by taking into account the third-party damage and losses.

Analysis of Life Cycle Costs of Railway Track : A Case Study for Ballasted and Concrete Track for High-Speed Railway (철도 궤도의 수명주기비용 분석 : 고속철도 자갈궤도와 콘크리트궤도 사례 연구)

  • Jang, Seung Yup
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.20 no.2
    • /
    • pp.110-121
    • /
    • 2016
  • In the decision-making, such as selection of structure, construction method, or time and scheme of maintenance, the evaluation of life-cycle cost(LCC) is of great importance. The maintenance cost occupy a large portion of the LCC of the railway track as well as the initial construction cost. Futhermore, the proportion of the maintenance cost is much higher in the ballasted track. Thus, the importance of the LCC evaluation is higher than in any other engineering structures. In this study, a LCC model that can consider various design parameters such as the type of track structure, annual traffic volume, axle load, train speed, and proportion of curve sections and engineering structures has been developed. Fundamental data for calculating costs also have been presented. Based on the model and data proposed, the trends in the variation of LCC according to the design parameters were examined and the most important design parameters in the LCC analysis of railway track were investigated. The results show that the proportion of renewal and operational costs is much higher in the ballasted track than in the concrete track, and the annual traffic volume and ballast taming period are most significant factors on the LCC of the ballasted track. On the contrary, it is revealed that the proportion of the initial construction costs in the concrete track is much higher, and the LCC of the concrete track is less sensitive to the traffic volume, train speed, and axle load.

A real-time construction management of a tunnel using position tracking sensor (위치추적 센서를 이용한 터널의 실시간 시공관리)

  • Lee, Kang-Hyun;Kim, Dae-Won;Mun, Sung-Mo;Cho, Hun-Hee;Kang, Kyung-In;Lee, In-Mo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.13 no.2
    • /
    • pp.133-148
    • /
    • 2011
  • Construction sites are becoming larger and complex with the growth of national economy. Accordingly, it is important to identify real-time information about materials, equipments, and manpower during construction at sites. Even though research utilizing position tracking sensors has been conducted in architectural engineering fields, this area of research is almost nil in civil engineering fields. Therefore, a feasibility study to find a way to apply position tracking sensors to an in-situ tunnel construction site adopting conventional tunnelling method is performed in this study. A methodology is proposed that the progress management of the tunnelling work can be monitored by checking construction materials needed at job site and the safety management system can be assessed by checking distance between in-situ workers and construction equipments. The most representative materials were identified so that IT technology can be applied by attaching and monitoring sensors to the selected materials. Also, time of arrival (TOA) for a position determination technology along with a wireless network technology was chosen and build wireless network system. The adopted methodology was applied to an in-situ tunnelling site, and verified the usefulness of the proposed system.