Estimation of non-working days due to weather condition using fuzzy numbers (퍼지값을 이용한 기후요소 작업불능일 산정에 관한 연구)

  • Kim, Joo-Heon;Choi, Hee-Bok;Shin, Yoon-Seok;Cho, Hun-Hee;Kang, Kyung-In
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.349-352
    • /
    • 2008
  • Weather condition is the uncontrolled factor to influence the project duration. Determining non-working days due to it incorrectly leads to often change the project duration and increase the total cost as well as causing the dispute among stakeholders. When making decision of non-working days, it is important to consider the expert's experience according to the characteristic of the site and local area. Therefore this paper presented the method to estimate non-working days due to wether condition by using fuzzy numbers reflecting expert's subjective experience.

  • PDF

An Earthwork Districting Model for Large Construction Projects (단지공사의 토공구획 계획 모델)

  • Baek, Hyeon Gi;Kang, Sang Hyeok;Seo, Jong Won
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.3
    • /
    • pp.715-723
    • /
    • 2015
  • Earthwork in a large construction project such as a land development generally costs 20-30% of the total cost. The earthmoving process, comprising of four repetitive tasks: loading, hauling, unloading, returning, is quite simple and it does not need delicate or advanced techniques. Therefore, earthmoving earthwork planning can heavily affect the cost and time., and Even a slight deviation from the plan can increase or decrease the cost and time. This study presents a planning model that minimizes average haul distance in a large complex construction project. Based on earthwork planning, practitioners' heuristics, a districting algorithm and Simulated Annealing algorithm were employed to build the model. Districting algorithm plays a role that divides in dividing an earthmoving area into several sections. Simulated annealing provides a function that decides whether a new generated solution is confident. Finally, the proposed model was applied to a real earthmoving project of a large land development. It was found that the model showed approximately 14% improvement in average hauling distance compared to the actual design plan.

Building construction process improvement using prefabricated materia (공업화자재의 활용을 통한 공정합리화)

  • Yoon You-Sang;Lee Hyung-Soo;Suh Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.1 s.13
    • /
    • pp.90-96
    • /
    • 2003
  • The purpose of this study is to present an improvement building construction process by using prefabricated materials. The current slab form work has waste factor by unnecessary process and not complete integration with the finishing process. Therefore the study used value stream analysis methodology for effective improvement of slab form work process. The main contents of the study are as follows; 1) Non-value adding activities were found at existing slab form work process by current state mapping(CSM) 2) Future state mapping(FSM) suggest process Integration to slab form work. 3) Slab form work is analyzed reduction time-cost by prefabricated material. The study recommends that, as a future research, development of tool and technique for the non-value adding activities are eliminated in building construction and application of prefabricated material should be increased.

Analysis on the Safety of Structure and Economics of Replacement Method Using Rock Debris in the Soft Ground - Case Study of Miho Stream Crossing Road in Cheongju City (연약지반 암버럭 치환공법의 구조물 안정성과 경제성 분석 - 청주시 미호천 횡단도로를 대상으로)

  • Heo, Kang Kug;Park, Hyung Keun;Ahn, Byung Chul;Min, Byeong Uk
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.4
    • /
    • pp.705-713
    • /
    • 2016
  • For the soft ground construction, the factors not considered in the design stage occurs in the construction stage so that they cause the increase of the construction cost due to the structural stability and the design change. The subject of the study is the construction section of the industrial complex access road made in the Ochang region of Chungcheongbuk-do. The study is concerned with selecting the soft ground handling method such as the replacement method using rock debris and the surcharge reflecting the service load as the soft ground handling measure and analyzing the effect of reducing the construction cost with the stability of structures and the reduction of the construction period. The soft ground in the study section consists of sandy and cohesive soil and is 2.4m to 5.5m deep. It is distributed unevenly between the 1.5m to 5.9m stratums under the ground surface. Settlement is not serious, but the future uneven settlement and difference are expected so that the future settlement behavior is estimated by analyzing the site measurement results after the soft ground treatment. Moreover, in consideration of the regional characteristics and economic efficiency, soil with good quality is replaced with rock debris as the replacement material so that 29% of the construction cost is reduced due to the increase of stability and the reduction of duration. If the estimation of the dispersion of the pore water pressure within the dam body and the change of the underground water level and the relation of the actually measured soft ground with consolidation is studied further on the basis of the study, it is expected that the behavior of the soft ground will be correctly estimated in various site conditions.

A Study of Automatic Fire Detection Installation based CAN Comunnication (CAN 통신기반 자동화재탐지설비에 관한 연구)

  • Kim, Young-Dong;Oh, Guem-Kon;Kang, Won-Chan
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.20 no.2
    • /
    • pp.50-59
    • /
    • 2006
  • In this paper, We are going to propose the fire protection system using CAN(Controller Area Network). The larger, higher and deeper buildings an, the more dangerous people are when fire happens. We should be aware of the problems of prior fire protection system. Therefore, we construct the embedded system based on CAN communication that is capable of N to N communication, and build independent fire protection system. If the fire is occurred on the building, the problem is that how fast we can detect the fire and put it on by using available system, this is major factor that reduces damage of our wealth. Therefore in this studies, We would like to design more stable system than current system. This system is based on CAN communication which is available N to N communication constructs and designed to compensate for each fault, so that our aim is to reduce the wires of system, cost of installation and to suppose future type fire protection system.

A Study on the Estimation Standard of Optimal Construction Duration for Reinforced Concrete Apartment House (철근콘크리트조 공동주택 적정공기 산정기준에 관한 연구)

  • Chun Young-Gee;Lee Gye-Uk;Kim Yang-Taek;Hyun Chang-Tae
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.531-534
    • /
    • 2001
  • At the beginning of construction, the estimation for the construction duration is very important to effectively control and use labors, builder's equipment, permanent and temporary materials, supplies and utilities, and money. In spite of the importance of the estimation for the construction duration, there is no estimation standard of optimal construction duration in korea. The purpose of this study is to suggest the estimation standard of optimal construction duration that is reasonable and systematical through developing the method for estimating, the construction duration. it is expected to be helpful for estimating, planning and scheduling. The analysis is executed the existing estimation standards and consulting the results of the interviews with the on-site engineers and the concrete compressive stress tests.

  • PDF

Improving Constructability for Partnering in Large Hospital Construction Projects (대형병원 프로젝트의 시공성 증대를 위한 파트너링 모델 구축)

  • Kim Sang-Il
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.3 s.19
    • /
    • pp.153-165
    • /
    • 2004
  • Most engineering tasks require collaboration between many users in major hospital construction projects that have many reconstructions. Loss and change orders occurred in factors such as information exchange, misunderstandings, advanced technology in hospital projects. Moreover, changes in context, costs, requirements, deadlines, etc. require negotiation of issues that may modify important project characteristics. The objective of this paper is to reduce reconstruction for the pre-construction process of hospital projects, reconstruction factors were analyzed in recent hospital construction project the system was established in order to solve reconstruction factors, and this system was validated through applying to the real project. Therefore it is a major challenge to make high level of communication and to have mutual understanding.

Systematic Improvement for Effective Operation of Long-Term Continuous Construction Contracts (장기계속공사계약의 효율적 운영을 위한 제도 개선)

  • Cho, Youngjun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.6
    • /
    • pp.3-10
    • /
    • 2019
  • The entire duration of the long-term continuous construction contract project cannot be expected when calculating the initial budget as the construction of the contract is carried out annually according to the budget composition. In addition, the statutes related to the defect liability and execution of contracts have not been established systematically in relation to the contract. Therefore, there are many problems at the actual construction site with regard to the defect liability or the performance of the contract in relation to the contract. In this study, the following improvement directions were presented for the efficient operation of the contracts: First, the defect liability is legal and should be specified in an Act rather than an enforcement decree. Second, if the parties to the contract vary in the following order in the contract, the special agreement should be specified in the enforcement decree. Third, in the event of an indirect cost due to the extension of the period of the long-term continuous work, the contingency items of the total project cost management policy should be utilized. Fourth, in the case of general construction contract conditions, clauses related to the purchase of the premium of the CAR, inspection, taking over, defect repair, and defect inspection shall be supplemented.

Influence of the Structural Framework on the Critical Path of Finish Works in Winter Season -Focusing on Case Study of High-rise Apartment Housing- (동절기 골조공사 시행이 마감공사의 주공정선에 미치는 영향 -아파트 공사의 사례분석을 중심으로-)

  • Han, Choong-Hee;Bang, Jong-Dae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.1 s.29
    • /
    • pp.148-158
    • /
    • 2006
  • Public construction companies have strictly followed a rule that they should not do the works using water such as concrete pouring for the structural frame for a certain period during the winter season. It is usually known that the designated non-working period during the winter causes increase of the project duration and the project cost escalation. The halted work also makes negative effects on national economy because it reduces worker's income. However, the situation would be a lot better if the work for the structural frame is allowed under some conditions. The structural framework done alone without being followed by finish works gives a lot of stresses on the finish works. In this sense, this study examines how the structural framework performed during the winter season affect on the critical path of the finish works. To accomplish the objective of this research, the subnet for the finish works as well as a master network are prepared along with critical paths for a virtual construction site. Using the prepared networks, simulations are carried out to see the effects described above. This study is expected to be used in estimating the construction duration of high-rise apartment housing when the site work for the structural frame should be performed during this period.

Application of Accrual Basis for Calculation of Prolongation Cost in Construction Projects (공기연장 추가간접비 산정기준의 발생주의방식 적용 연구)

  • Jeong, Kichang;Lee, Jaeseob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.5
    • /
    • pp.111-120
    • /
    • 2018
  • Recently, Domestic public construction projects are experiencing a great deal of disputes because of the growing uncertainty about the criteria for calculating the prolongation cost. In addition, researchers have been studying various systems and proper cost estimates in an effort to reduce the uncertainty of these systems and the occurrence of disputes. However, there is no standard yet for social consensus. Meanwhile, The study on the classification system according to the recognition standard of accounting has been systematically studied. As a result, the concepts of accrual and cash basis are defined separately. The purpose of this study is to verify the possibility of applying the concept of 'accrual basis' to the Standard for calculation of prolongation cost. Therefore, As a result of analyzing the occurrence pattern of Job-site overhead cost, it is confirmed that actual costs can not be calculated by the cash-basis method. In particular, the implications of the necessity of the accrual-basis method should be more strictly indicated in the case of items such as indirect labor costs and welfare benefits. In addition, the contractor 's claim report and the appraisal report were examined. As a result, it was confirmed that the calculation situations of prolongation costs are biased to the cash-basis method. In this way, it is suggested that necessary to supplement the calculation standard of the actual costs from the point of view of accrual basis.