A Study on the Estimation Standard of Optimal Construction Duration for Reinforced Concrete Apartment House (철근콘크리트조 공동주택 적정공기 산정기준에 관한 연구)

  • Chun Young-Gee;Lee Gye-Uk;Kim Yang-Taek;Hyun Chang-Tae
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.531-534
    • /
    • 2001
  • At the beginning of construction, the estimation for the construction duration is very important to effectively control and use labors, builder's equipment, permanent and temporary materials, supplies and utilities, and money. In spite of the importance of the estimation for the construction duration, there is no estimation standard of optimal construction duration in korea. The purpose of this study is to suggest the estimation standard of optimal construction duration that is reasonable and systematical through developing the method for estimating, the construction duration. it is expected to be helpful for estimating, planning and scheduling. The analysis is executed the existing estimation standards and consulting the results of the interviews with the on-site engineers and the concrete compressive stress tests.

  • PDF

The Calculation Method for Prolongation cost of Sub-Constract in Domestic Public Construction Project (국내 공공 공사 하도급계약 공기연장 추가간접비 산정방안)

  • Jeong, Kichang;Lee, Jaeseob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.4
    • /
    • pp.61-69
    • /
    • 2018
  • Research on additional indirect cost due to construction period extension in general contracts has continuously been active whereas the same for the subcontract operations has not been. In this research, we review previous research on evaluation methods for additional indirect costs which are widely being used on construction sites as well as previously proposed methods altogether, applying them to analyze model-cases for comparison. We acknowledge that this pattern for construction cost fluctuation over the construction period demonstrates an S-curve. This S-curve shaped indirect cost occurrence is then used to generate model-cases that are used throughout the research which models we applied previous evaluation methods on. Finally in pursuit of finding out some problems of evaluation methods, we came to derive a conclusion that the "Average Actual Cost Evaluation Method on Extended Duration," which, in turn, were proved to be valid for application on general contracts, was also valid for general application on subcontractor operations.

A Study on the Effective Decision-Making Support Model for Construction Duration by the Hypothetical Weather Simulation (가상기후 시뮬레이션에 의한 공기산정 의사결정 지원모델에 관한 연구)

  • Jeong Suk-Nam;Lee Hak-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.4 s.4
    • /
    • pp.74-81
    • /
    • 2000
  • The duration of construction in the construction works contains non-working days as well as working days. The duration is so relevant to climate that it should be calculated after fully considered about the regional climate in which construction processes. In most construction fields, however, there has been a frequent adjustment of duration because the field supervisor's experiences have decided non-working days indiscriminately without any accurate information about weather. Not only has that done great economic damages, but also caused many problems in interests among construction subject. So, in this study, we will analyse the elements of climate which has influences on the duration and implement the hypothetical weather simulation. By connecting the results of simulation with the duration of construction, we will propose the decision-making support model for the efficient calculation of duration when the field supervisor makes the projects schedule.

  • PDF

Analysis of Actual Duration by Effecting Elements to Duration Estimate - Focused on Standard Duration of the Office Building Construction - (공기산정 영향요인별 실적공기 비교분석 - 사무소 건축공사 공기산정기준을 중심으로 -)

  • Hwang Hyo-Sang;Kim Kyung-Rai;Suh Sang-Wook;Kim Chang-Duk;Shin Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.3 s.11
    • /
    • pp.84-93
    • /
    • 2002
  • It is important to reduce construction duration in private sales and lease business for management of cash now in the owner's aspect. However, because the concept of standard duration hasn't been established in the domestic construction industry, it is difficult to present the standard of duration estimate. To solve this problem, this paper (1) grasped the effecting elements considered in the duration estimate through referring the existing literature related to the schedule management, (2) accomplished a comprehensive research on actual duration based on office buildings through the questionnaire survey and the expert interview, (3) presented the collected research data analyzed by effecting elements as standard duration, (4) compared standard duration with actual duration of countries advanced in construction projects as well as analyzed them, and then (5) raised the necessity of duration reduction in the domestic construction industry.

Optimal Scheduling based on Probabilitic Estimation of Construction Duration (확률적 공기산정에 의한 공정 합리화 방안)

  • Kim Sang-Joong;Lee Jae-Soeb
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.383-387
    • /
    • 2003
  • Construction project has many problem such as delay of the appointed date delivery, over budget, wether and site conditions. When several activities are influenced by the same factor, their duration may be delayed. This paper deals with the problem of construction duration estimating and schedule variation on the construction project. The theory of constraints technique for project management is referred to 'Critical Chain' technique. This paper shows optimal scheduling plan and time management technique, used probability construction duration estimating and scheduling buffer based on the critical chain project management.

  • PDF

A Study on the Estimate Criteria and Influence Factors of Construction Duration of Domestic Firms -Focused on the Apartment Building Firms- (국내 건설 업체 공기산정 기준 및 영향요인 연구 -공동주택 중심으로-)

  • Kim Sun-Yeop;Kim Sun-Kuk;Han Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.447-450
    • /
    • 2004
  • The domestic construction industry have focus on duration than construction cost. But recently it have interesting to The domestic construction industry, social requirement is changing. At the moderate speed duration has other angle of reducing cost and management of efficiency. specially Apartment building construction process is similar to other construction industry so it Is obtain a strong Point. This study on, A Target of construction industry is short duration than other it, general construction duration in summary schedule of level is studied, is based and construction duration for the point it is indicated reduction duration

  • PDF

Estimation of non-working days due to weather condition using fuzzy numbers (퍼지값을 이용한 기후요소 작업불능일 산정에 관한 연구)

  • Kim, Joo-Heon;Choi, Hee-Bok;Shin, Yoon-Seok;Cho, Hun-Hee;Kang, Kyung-In
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.349-352
    • /
    • 2008
  • Weather condition is the uncontrolled factor to influence the project duration. Determining non-working days due to it incorrectly leads to often change the project duration and increase the total cost as well as causing the dispute among stakeholders. When making decision of non-working days, it is important to consider the expert's experience according to the characteristic of the site and local area. Therefore this paper presented the method to estimate non-working days due to wether condition by using fuzzy numbers reflecting expert's subjective experience.

  • PDF

The Estimation of Construction Duration for High School Buildings Based on the Actual Data (실적자료에 의한 고등학교 시설 공기산정)

  • Kwon Dong-Chan;Lee Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.138-145
    • /
    • 2004
  • The construction duration for any building or facilities such as high school building influence the quality of the building as well as the total cost for them. Since there are no guidelines to estimate construction duration correctly, an employer(or owner) estimate it by their own experience or intuition. Therefore some conflicts related to construction duration happen between contract parties during construction. The purpose of this study is to suggest a predictive model which helps decision makers calculate exact net working days for high school building construction at the early stage of the construction project. To measure net working days for high school construction, 15 data were collected from actual spot in Incheon region. Multiple linear regression analysis was conducted to obtain the model which calculate construction duration for the substructure, the superstructure and the finishing works. total construction duration could be obtained by adding net working days to non working days which would be based on the meteorological statistics for Incheon region since 1974 to 2003.

Estimation of Non-Working Day Considering Weather Factors in Construction Projects - Based on Estimation Periods for Improving the Forecast - (건설공사의 기후요소에 의한 작업불능일 산정기준에 관한 연구 - 예측성 향상을 위한 산정기간 비교분석 중심으로 -)

  • Lee Keun-Hyo;Kim Kyung-Rai;Shin Dong-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.394-397
    • /
    • 2004
  • Working-day calculation with weather factors of construction-site has estimated wethout proper data. They usually estimate it with their own experience and intuition. It causes not only economic loss to time-adjustment but also conflict with each participants. Moreover, weather estimation becomes worse than before, due to tendency of recently weather change. So, in this paper we present optimal estimation method as assessment by period of the arithmetical mean methods. For that, we analyse characteristic of the regions and weather change of temperature and rainfall which affects time.

  • PDF

Improvement of the Calculation Standard for Prolongation cost of Long-term Continuing Contracts Construction Project (장기계속계약공사의 공기연장 추가간접비 산정 개선방안)

  • Jeong, Kichang;Lee, Jaeseob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.2
    • /
    • pp.30-37
    • /
    • 2017
  • In Korea, additional indirect costs generated from the time period extension of public construction projects have been studied. Practical claims against such costs are increasing. There are no clear criteria for calculating the delay cost caused by the extension, and thus calculation methods differ across entities. Logical valid calculation methods have also not been researched. Further, there are no Korean studies on the additional indirect cost caused by a suspension in a public construction project on a long-term continuing contract. The purpose of this research is to propose a method of calculating the indirect cost incurred by construction time extension that reflects the characteristics of Korean public construction projects. The cost patterns generated during construction periods were analyzed, and then the current criteria of calculating the indirect costs caused by the extension were examined. Following this, actual conditions and practices in the field were surveyed and the current calculation method was applied to a model case to compare the actual cost and that determined from the current calculation method. Issues with the current method were identified by this comparison. Based on this, this research proposes a method of calculating the total actual cost caused by a suspension in a public construction project that is appropriate for calculating the additional indirect cost generated by a suspension in a public construction project on a long-term continuing contract.