The Improvement Plan of Project Delivery Systems in the Public Construction Projects (공공건설사업의 발주방식 개선방안)

  • Choi, Eun-A;Kim, Hyun;Park, Sung-Yong;Cho, Hyeong-Jin;Lee, Sang-Beom
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.509-512
    • /
    • 2008
  • Clients demands have been changed by construction circumstances such as high-technology, mega-projects, and the complexity of construction. Advanced foreign countries have already introduced and applied new project delivery systems(i.e, CM, DB, etc.) to deal with the change of such that. Recently, Korea also launched two new project delivery systems, "Best Value Contracts to which the State is a Party" to provoke the project delivery system, which helps a public owner select a project delivery system appropriate to the project characteristics. Even though government has made his efforts as stated above, some clients have still used those to public construction projects uniformly. That is because there are not a selection criteria of project delivery system for clients. Therefore, this paper proposes the selection criteria of project delivery system based on project types in the public large construction projects.

  • PDF

Comparison of Cost Performance for Delivery Methods on Public Construction Projects (공공 건설공사 발주방식에 따른 비용성과 비교연구)

  • Lee, Yoo Sub;Kang, Tai Kyung;Shin, Eun Young;Park, Wonyoung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.6
    • /
    • pp.2575-2582
    • /
    • 2013
  • In the delivery systems for public construction works, design-build methods such as turn-key and alternative have contributed to improving the quality of structures and developing the construction technology. However, it is pointed out that construction based on a design-build method is likely to waste a budget due to its higher contract price than construction based on a design-bid-build method. Other issues such as contract monopoly, bid rigging and deliberation irregularity in design-build. Since there are not much works have been accomplished to comparatively analyze the actual performance and effect based on delivery methods, discussing and judging the performance and effect of each deliver method with limited information could lead to an error. Thus, this study by extensively investigates the actual project cost data, ranging from contract price to the construction cost of the public construction works and comparatively analyzed the characteristics of each delivery method about cost structure and fluctuation trend. This work is expected to assist stake-holders in properly understanding delivery systems for public construction works and promoting their efficient management.

공공 택지 확보에 뛰어든 민간건설사

  • Seo, Mi-Suk
    • 주택과사람들
    • /
    • s.206
    • /
    • pp.44-45
    • /
    • 2007
  • 분양가상한제 시행으로 민간건설사는 시행사와의 도급공사 방식보단 자체 개발사업으로 방향을 선회해야 한다. 이를 위해서는 민간건설사가 직접 부지를 매입해야 하는 등 다소 어려움을 호소하고 있다. 공공택지 확보 경쟁에 뛰어든 민간건설사의 동태를 살펴본다.

  • PDF

이슈 & 이슈 (2) - 대한주택공사+한국토지공사 'LH공사' 출범

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.232
    • /
    • pp.44-49
    • /
    • 2009
  • 대한주택공사와 한국토지공사를 통합한 한국토지주택공사가 지난 10월 1일 공식 출범했다. 주공과 토공 양 공사의 통합은 현 정부들어 공공기관의 방만경영과 비효율을 불식시키고 경영효율화를 위해 추진된 공기업 선진화 정책에 따라 지난 세월 미결로 논란만 지속되어 오던 사항을 1년 8개월만에 성공적으로 완수 하여 그 결실을 맺은 것으로 의미가 깊다. 한국토지주택공사 출범은 택지개발과 주택건설의 일원화를 통한 원가절감 등 시너지 효과를 가져와 저렴한 택지 주택 공급과 서민주거안정을 위한 보금자리주택 건설 추진에 박차를 가함은 물론, 4대강 살리기 사업 및 녹색성장, 토지은행, 국토의 광역개발 등 국가 정책사업을 효율적으로 추진할 것으로 기대된다.

  • PDF

A Study on Estimation Model of Construction Duration for Public Construction (공공건설공사 공사기간 산정모델에 관한 연구)

  • Kim, Byeong-Soo;Chun, Jin-Ku
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.142-151
    • /
    • 2005
  • On public constructions, that the first planed projects delay than the scheduled completion day occurrence frequently because gap between the scheduled construction durations and the actual construction durations. These facts connect with not only problems of the construction during as the construction delay but also brought about the distribution costs increase as the failure of facility use plan and the people discomfort weight, failure of the production and the supply using facility then tremendous loss of each part etc. For reduce these loss, it must improve accuracy of the scheduled construction duration estimating when it order. This study try contribute to a successful manage of public project and reduce the construction duration extension frequent of the construction during, and then ensure the suitable construction duration by present the estimation model of the scheduled construction duration that include the construction duration correct element using as an index on the scheduled construction duration estimation.

Identifying Factors Causing Bid-dropping in Domestic Public Work Projects and Ways of Ending Its Decline (국내 공공공사 낙찰률 하락의 원인 분석 및 개선 방향)

  • Lee, Bok-Nam;Lee, Young-Hwan;Chang, Chul-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.5 s.27
    • /
    • pp.102-109
    • /
    • 2005
  • The contract price of successful bidders in domestic public work projects has dropped significantly under lowest bidding process. Furthermore, compared to the U.S. and Japan, the bids are substantially lower. The increasing trend for domestic construction companies to bid projects without considering markup or expected profit, with the purpose of gaining experience for future similar work, has contributed to the overall dumping in bid prices. The government has implemented controls in hopes of reducing the price dropping trend but these have yet to work in the market. This study determines the level of significance of the contract price of the successful bidder in domestic public works projects and identifies factors that cause bid-dropping by comparing to those of the US and Japan. By mirroring advance countries' rules and regulations to prevent an abnormally low bidder, recommendation are provided to keep unrealistically low bidders from winning the work.

Proposal of Improvement Devices for Construction Dispute Resolution System in Public Works (공공건설공사의 분쟁해결조항 개선방안 연구)

  • Lee Ji-Yeon;Shin Kyoo-Chul;Lee Jae-Seob
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.437-441
    • /
    • 2004
  • This study aims to propose a set of improvement devices for construction dispute resolution clause of public improvement project in Korea. To do so, the study addresses the system and procedure of construction dispute resolution in domestic and overseas, and reviews precedent cases, specifically focused of a selective arbitration case. In public sector's initiated contracts, the absence of c)aim procedure clause is unable to response to the claims in timely manner, and the ambiguity of clause o( selective arbitration make it difficult to resolve a dispute by arbitration. Thus, in this study alternative dispute resolutions are explored as a way to resolve various construction disputes of public-initiated project in developed countries.

  • PDF