Journal of the Korea Academia-Industrial cooperation Society
/
v.14
no.7
/
pp.3518-3527
/
2013
The new developed train(HEMU-430X) faces running at high speed over 400km/h. But The Korea railway design code gives guidelines below 350km/h speed. Honam HighSpeed Railway was also designed based on the design standard below 350km/h. Existing infra structures have to be reviewed at high speed running and the design guideline for the speed over 350km/h should be prepared as soon as possible. This paper presents (1) the simulation results of composite steel girder bridge(Kaya Bridge of Seoul-Pusan HighSpeed Railway), (2) values measured at this bridge and the comparison with simulation results, and (3) the prediction of Yonjung bridge being constructed in Honam HighSpeed Railway.
In 1998, because of the economic crisis called IMF Crisis in Korea, Kyungbu high speed railway project could run by modifying the original plan to open it as a 1st phase only by utilizing the existing railway lines from Seoul to Siheung and the other one from Daegu to Pusan. The modified plan includes that the line from Daegu to Pusan will be constructed as a second phase in next time. Starting railway operation with the changed plan, the combined application operation of high speed rail, passenger rail and freight rail was caused partly from Seoul to Siheung to run into capital area. As a result, the opinion for additional railway line construction is insisted continuously because the operation volume of passenger rail was forced to be reduced, the service quality of it was decreased and it became difficult to add new high speed services. Moreover, with regard to Honam high speed rail, the new construction plan of station in Kangnam metro area as a basement station for starting from Suseo was changed to the plan of turning out at Osong because of the economic effectiveness and this kept resident people in Kangnam metro area and southern Kyungki area unable to get the opportunity of high speed rail service benefit. After beginning of Kyungbu high speed railway operation, national transportation system developments are focused on high speed rail, and when the second phase construction of Kyungbu high speed rail, beginning operation of Kyungjeon line, Jeolla line double track construction, Honam high speed rail in 2014, is completed, the demand for high speed rail will be increased and it is unavoidable to make Kwangmyung station as a basement station and to reduce the number of passenger rail operation. At this moment, it is valuable to consider adding the railway line capacity in capital area to improve the transferring service for citizen who live in area without Kyungbu high speed rail station and to expand the service area from Kangbuk to Kangnam and southern Kyungki area. Accordingly, in this paper, the effective rail operation method, facility plan and the other issue to be reviewed for increasing capital high speed railway lines will be mentioned.
The speed of train has rapidly been increased in accordance with the developed railway technology. Nowadays, high-speed trains were introduced which has the speed faster than 400 km/h. In Korea, a lots of efforts were undertaken to increase the speed of train faster than 350 km/h, however noise and vibration are still the main problems to solve for realization of the high-speed train. In the case of operation speed faster than 350 km/h, it can be easily presumed that the noise and vibration damages could be increased in the train stations which are close to the passing railway tracks. Thus, the noise in the five different types of high-speed train stations were analyzed including stations built on the ground, underground, under rail, and two types on rail. The present paper predicts noises inside the stations depending on the speed of the passing trains and analyze the noise comparing with noise criteria (NC). Sound insulation performance of each part of buildings was calculated using the transmission noise formula and computer modeling, Finally, a series of processes were introduced to satisfy the aural environment with the optimum interior noise criteria by changing interior finishing materials.
Proceedings of the Korean Society of Precision Engineering Conference
/
2004.05a
/
pp.207-207
/
2004
고속철도의 개통이 가까워지면서 사회적 관심이 고조되고 있으며, 특히 안전과 환경의 문제가 주요한 관심사로 대두되고 있다. 특히 공기역학적 관점에서 볼 때 300km/h의 고속에서는 지금까지 국내에서 경험하지 못한 여러 가지 문제점들이 나타나리라 예상되고 있으며, 그 중에서도 승강장에 대기증인 승객 또는 보행자가 열차 통과 시에 느끼는 불쾌감과 위험에 대한 조사와 대책이 필요한 시점이다.(중략)
When constructing a high-speed railroad, the reduction of the distance between track centers and the width of track bed will save the construction cost. However the shortening the distance between track centers may cause the stability problems due to higher wind pressure. Therefore the extensive technical review and aerodynamical study should be performed to determine the adequate distance between track centers. In this study, the impact that the increase in wind pressure due to the change of aerodynamic phenomena with the change of the distance between track centers may have on two trains passing by each other was predicted, and the stability of train operation was analyzed in order to review the distance between track centers suitable to Honam HSR trains. We conducted the parametric study of the effects of train wind on the running stability.
경부고속철도의 개통과 함께 서울-부산 간 운행시간이 새마을호 기준 4시간 30분에서 2시간으로 단축되는 등 획기적인 시간 절감을 이루었으나 이는 고속철도가 운행되는 지역에 국한된 것이다. 이에 고속철도 비 수혜지역의 운행시간 단축을 위해 기존선 속도향상이 요구되며, 이러한 목적으로 한국철도기술연구원에서는 틸팅열차를 개발하여 시운전 10만Km를 목표로 시험운행중이다. 또한 한국철도공사에서는 이와 유사한 목적으로 기존선 신호시스템인 ATS 시스템을 차상신호시스템(ATP)으로 개량하는 사업이 추진되고 있다. 현재 틸팅열차에는 기존의 ATS(자동열차정지장치) 차상장치만을 장착하여 차량의 성능 확인을 위한 시험 및 시운전을 우선적으로 추진하고 있는 상태이며 이러한 ATS 차상장치는 160km/h 이하의 속도에서만 본연의 기능이 유지되고, 그 이상의 속도에서는 현실적으로 사용이 어렵기 때문에 틸팅열차의 목표속도인 200km/h에서 적합하게 시험하기 위해서는 적합하지 않다. 따라서 한국철도공사에서 추진하고 있는 ATP 구축사업의 지상설비와 연계될 수 있는 ATP 차상장치를 설치하여 시험을 하여야 한다. 본 논문에서는 이를 위하여 ATP 차상장치의 틸팅열차 적용에 대한 연구를 추진한 결과를 발표하고자 한다.
Technologically advanced railway countries had a unique ability to design, test and evaluation systems for development of High-speed train system. To evaluate the performance of the train system in Korea for the development of advanced measurement technology and systems are needed. In this study, the Overall Measuring System(OMS) is going to be established to efficiently verify the performance, stability and reliability of the train system and the components, and verify of the maximum speed though an on-line test. OMS consist of vehicle measuring system, pantograph measuring system, video monitoring system and monitoring room was constructed for the overall measuring system and monitoring system. The results of this study were expected to contribute to technical improvement for evaluation of train system.
급속한 경제발전과 이에 대응한 교통인구의 증가로 운송시스템의 속도 경쟁은 날로 심화되고 있다. 그러나, 기존의 차륜구동 시스템은 본질적으로 궤도와 차륜의 마찰에 의하여 추진력을 얻기 때문에 평균 최대속도 250Km/h(상한 최대속도 350Km/h)수준이며 소음, 진동 등의 많은 문제점이 있다. 이러한 단점을 극복하기 위하여 선진 외국에서는 부상식 열차의 개발에 관심을 표명하여 1960년대 후반부터 열차와 공기부상식 열차에 대한 연구를 병행하였다. 1970년대 중반까지 프랑스, 영국, 미국 등에서 개발이 진행된 공기 부상식 열차는 고속 주행 및 환경 문제 등에 문제점이 많아 실용화에는 이루지 못하고 신교통 시스템에 부분적으로 적용되고 있는 실정이다. 그러나 자기부상 열차는 Power Electronics 및 자기관련 기술의 급속한 발전에 힘입어 현재 실용화 단계에 이르고 있다. 특히 자기부상(Magnetic Levitation : Maglev) 시스템은 레일과의 마찰력에 의해 추진하는 방식이 아니기 때문에 본질적으로 고속성, 무공해, 안정성, 신뢰성, 경제성 그리고 승차감이 뛰어나다. Maglev는 레일 표면에서 자력을 이용해서 약 1.0cm 또는 10cm 가량 부상한 상태에서 주행하기 때문에 외부와의 물리적인 접촉이 필요 없어 마찰에 의한 소음, 공해, 마모 등이 없는 대단히 이상적인 미래의 운송 수단으로 각광을 받고 있다.
Computer aided simulation is an essential part in planning, design, and operation of railway systems. To determine the adequate performance and specification of railway system, it is necessary to calculate train performances such as distance, speed, power during train's running. This paper presents result of train performance simulation using the program that developed for Korea high speed train. To verify result of simulation, we have compared that with experiment data.
시속 300km로 주행하는 고속철도 열차의 주행안정성 및 승차감을 확보하기 위해서는 열차하중을 고려한 정교한 정적, 동적해석 및 설계가 이루어져야 한다. 따라서 차량과 궤도의 동적상호작용 및 차량과 교량의 동적상호작용, 터널의 미기압 및 공기압, 대단면 터널굴착의 안정성평가, 열차주행에 의한 지반진동의 예측 등에 전산수치해석기법의 활용 및 개발이 현재 활발히 이루어지고 있다. 그러나 고속철도 보유국을 포함한 선진국들에 비하면은 이러한 전산수치해석분야에 있어서 아직도 더 많은 연구 및 개발이 본 공단을 포함하여 학계 및 연구소에서 이루어져야 하겠으며, 본 경부고속철도 건설사업으로 인하여 차량, 전기시설분야의 각종 첨단기술개발 및 발전과 더불어 하부 토목구조물의 건설 및 설계 해석분야에 많은 발전이 기대된다 하겠다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.