• Title/Summary/Keyword: 고속철도터널

Search Result 216, Processing Time 0.025 seconds

급류수로 터널에서의 Cavitation의 문제와 대책방안

  • 김성인;김재관
    • Geotechnical Engineering
    • /
    • v.20 no.6
    • /
    • pp.6-13
    • /
    • 2004
  • 주행속도가 300km/h에 육박하는 고속철도가 터널안으로 진입하게 되면 터널내의 공기흐름에 영향을 미치게 되어 터널벽체에 공기압이 작용하게 된다. 따라서 일반도로나 철도에서의 터널설계와는 달리 고속철도용 터널설계에서는 공기압에 대한 검토를 별도로 하는 것이 일반적이다.(중략)

  • PDF

Calculation of the Normal Operation Rate of Monitoring Hardware in the Long Tunnels of High-Speed and Urban Railways (고속 철도와 도시철도 장대터널 계측기기의 정상 작동율 산정 연구)

  • Woo, Jong-Tae
    • Journal of the Society of Disaster Information
    • /
    • v.18 no.1
    • /
    • pp.80-90
    • /
    • 2022
  • Purpose: The objective of this study was to improve smart monitoring and monitoring management technology in long tunnels by investigating and analyzing the normal operation rates of monitoring hardware in the long tunnels of high-speed and urban railways. Method: This study evaluated, analyzed, and compared the normal operation rate of 6-8 types of monitoring hardware for each long tunnel, targeting three high-speed railway lines with a long tunnel (i.e., Suseo-Pyeongtaek Line, Gyeongbu Line, and Honam Line) and two urban railway groups with a long tunnel (i.e., Seoul Metro Lines 5, 6, and 7, and 9). Result: The rank of the normal operation rate of monitoring hardware was in the order of Suseo-Pyeongtaek High-Speed Railway (92.1%), Seoul Metro Lines 5, 6, and 7 (85.8%), Seoul Metro Line 9 (85.2%), Gyeongbu High-speed Railway (80.5%), and Honam High-speed Railway (46.7%). Conclusion: The mean normal operation rate of the monitoring hardware in the three high-speed railway long tunnels was 83.4%, and that of the two urban railway long tunnels was 85.5%, indicating that the deviation between them was small. The mean normal operation rate of the monitoring hardware in the long tunnels of the five high-speed and urban railway lines was 84.2%.

현장탐방 - 수도권고속철도(수서~평택) 터널

  • 대한기계설비건설협회
    • 월간 기계설비
    • /
    • s.311
    • /
    • pp.40-51
    • /
    • 2016
  • Rail로 세상을 연결하여 국민의 행복을 창조하기 위해 노력하는 한국철도시설공단(이사장 강영일)은 수서~평택 간 수도권 고속철도사업을 올해 안으로 완수하기 위해 노력하고 있다. 한국철도시설공단이 추진하는 수도권고속철도(수서~평택) 건설사업은 서울 강남의 수서역에서 출발하여 동탄역을 거쳐, 평택역에서 현재 운영 중인 경부고속철도와 접속하는 노선으로 총 3조7천억원이 투입됐다. 지난 2011년 착공하여 올해 말까지 완공할 계획으로, 대부분의 구간을 지하로 건설한다. 수도권고속철도가 건설되면 KTX 수서역 동탄역이 신설되어 서울 강남 강동권 및 경기 동남부 지역까지 KTX 수혜범위가 확대되고 수서에서 부산까지 2시간 2분, 목포까지 1시간 52분으로 운행시간이 크게 단축되어 이용객 증가는 물론 지역균형발전과 성장동력 확보에 기여할 것으로 예상된다. 본지는 수서역사와 율현터널 현장에서 한국철도시설공단 수도권고속철도건설단 건축설비부 신승섭 차장(기계설비 감독관)과 율현터널(제1공구) 기계설비를 시공 중인 (주)세화이엔지[대표 박현수] 윤한식 현장소장, 수서역사 기계설비를 시공 중인 (주)초록이노텍[대표 양기준] 홍승훈 현장소장, (주)서한종합건축사사무소 홍형창 기계부장(감리단)을 만나보았다.

  • PDF

Experimental Study on the Slit Cover Hood for Reducing the Micro Pressure Waves in High-speed Train-tunnel Interfaces (고속철도에서 슬릿커버후드의 터널 미기압파 저감성능에 관한 연구(II))

  • Kim, Dong-Hyeon;Shin, Min-Ho;Han, Myeong Sik
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.2 no.3
    • /
    • pp.3-11
    • /
    • 2000
  • Purpose of this paper is to investigate the hood configuration at a tunnel entrance to reduce the micro pressure wave that is generated according to train speed. Two configurations were examined for the tunnel of 0.5 km in length. The experimental results show that a slit cover hood installed at the entrance of the tunnel reduces the maximum micro pressure wave by 41.2%, and the configuration with a slit cover hood installed at the entrance and the $45^{\circ}$ slanted portal at the exit of the tunnel suppress the pressure wave by 47.7%.

  • PDF

Stability Analysis of High Speed Railway Tunnel Passing Through the Abandoned Mine Area (폐광지역을 통과하는 고속철도터널의 안정성 평가)

  • 장명환;양형식;정소걸
    • Tunnel and Underground Space
    • /
    • v.10 no.3
    • /
    • pp.395-402
    • /
    • 2000
  • The influence of the mined-out caves on the stability of the high speed railway tunnel was investigated with a series of geological logging and in-situ tests on the one hand, and with the rock mass classification using the multiple regression analysis on the other hand. The rock mass in this area can be classified as 'fair', and the condition of the discontinuities plays the most important role in the classification of the rock mass. The results of the analysis obtained by the FLAC showed that the western part of the tunnel locating at 50m above the mine cavities could be affected by subsidence associated with a considerable deformation, the magnitude of which might depend on the properties of the rock mass.

  • PDF

Tunnel Blast Design for Earthquake Accelerometer Installed Rapid Transit Railroads (지진가속도계가 설치된 고속철도 터널 인근의 발파설계)

  • Lee, Jong-Woo;Kim, Nam-Soo;Jung, Sang-Jun;Park, Chi-Myeon
    • Explosives and Blasting
    • /
    • v.32 no.1
    • /
    • pp.18-22
    • /
    • 2014
  • KoRail establishes "Guideline for earthquake acceleration measuring instrument and operation." and applies the management of the rapid transit railroad. KoRail manages the trains by train driving patterns subjected to the train operating know-how for the safety against the earthquake hazards. This paper introduces the case studies on bench blast and tunnel blast designs considering a rapid transit railroad.

고속철도용 터널의 상시계측 시스템 구축에 관하여

  • 이준석;최일윤;문도영;이희현
    • Magazine of korean Tunnelling and Underground Space Association
    • /
    • v.3 no.2
    • /
    • pp.63-67
    • /
    • 2001
  • 최근 구조물의 안전과 관련하여 계측기술에 대한 관심이 고조되고 있으며, 시공중 계측 뿐 아니라 시공후 유지관리를 위한 구조물의 계측 사례가 증대되고 있다. 본 고에서는 영구계측을 위하여 고속철도용 터널에 적용된 유지관리 계측시스템을 소개함으로써 추후 터널의 유지관리 계측시스템을 구축하는데에 기초적인 자료를 제시하고자한다.

  • PDF

Wave Phenomenonin High-Speed Railway Tunnel (고속철도 터널에서 발생하는 유체역학적 파동현상)

  • 김희동
    • Journal of the KSME
    • /
    • v.34 no.10
    • /
    • pp.796-807
    • /
    • 1994
  • 이 글에서는 고속철도 터널에서 열차에 의해 발생하는 압축파의 특성과 그의 전파거동에 관하여 기술하였다. 또 터널내에서 발생한 압축파가 터널 출구에서 충격음(미기압파)으로 방출되어 주 변의 환경에 큰 영향을 미치고 있다는 문제점을 지적하였으며, 이러한 소음의 발생 메카니즘과 소음의 저감 및 제어방법에 대하여 개괄적으로 기술하였다.

  • PDF

A numerical study on the pressure relief by a vertical shaft in a high speed railway tunnel (고속열차의 터널 진입시 수직갱의 압력저감효과에 대한 수치해석 연구)

  • Kim, Hyo-Geun;Seo, Sang-Yeon;Ha, Hee-Sang;Kwon, Hyeok-Bin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.15 no.6
    • /
    • pp.559-570
    • /
    • 2013
  • High speed railway can transport large quantity of people and commodities in a short time and has become one of the most desirable and environmentally friendly transportation. However, it is hard to have a complicated route for high speed railways, construction of tunnels is essential to pass through a mountain area. When a high speed train enters a tunnel, pressure wave is created in a tunnel and the wave causes micro pressure wave and discomfort to passengers. In order to alleviate pressure wave in a tunnel, constructing a vertical shaft is one of the most efficient ways. This study represents a numerical analysis module, which takes into account the effect of a vertical shaft in a tunnel. The module can be used in a numerical program (TTMA) specialized for aerodynamics in a tunnel, and it was validated by comparing numerical results with various measurements in Emmequerung tunnel and results from numerical analysis using Fluent.

Railway tunnel ventilation system design (철도터널 환기설계의 기초)

  • 신현준;유지오
    • The Magazine of the Society of Air-Conditioning and Refrigerating Engineers of Korea
    • /
    • v.28 no.6
    • /
    • pp.463-475
    • /
    • 1999
  • 산업과 생활수준의 향상에 따라서 도로나 철도 등의 기간산업에 대한 고속화 및 대용량화가 요구되고 있다. 특히 철도에 있어서는 선형의 직선화 및 복선화계획이 진행되면서 터널건설이 증가하고 장대터널이 요구되고 있는 실정이다. 이에 따라 철도터널의 환기 및 방재 시스템의 설계기법에 관심이 고조되고 있으나 현재의 국내 철도 터널은 대부분 오래 전에 건설된 것이며 또한 환기설비를 요구할 만큼의 장대터널이 없기 때문에 이를 고려하지 않고 있다. 그래서 국내의 철도터널 환기설계 기술은 미약한 상태로 현재 발주되는 대부분의 공사를 외국의 용역사의 설계에 의존하고 있는 실정이다.

  • PDF