• Title/Summary/Keyword: 고속도로공사

Search Result 243, Processing Time 0.025 seconds

Development of Selection Model of Interchange Influence Area in Seoul Belt Expressway Using Chi-square Automatic Interaction Detection (CHAID) (CHAID분석을 이용한 나들목 주변 지가의 공간분포 영향모형 개발 - 서울외곽순환고속도로를 중심으로 -)

  • Kim, Tae Ho;Park, Je Jin;Kim, Young Il;Rho, Jeong Hyun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.6D
    • /
    • pp.711-717
    • /
    • 2009
  • This study develops model for analysis of relationship between major node (Interchange in expressway) and land price formation of apartments along with Seoul Belt Expressway by using CHAID analysis. The results show that first, regions(outer side: Gyeongido, inner side: Seoul) on the line of Seoul Belt Expressway are different and a graph generally show llinear relationships between land price and traffic node but it does not; second, CHAID analysis shows two different spatial distribution at the point of 2.6km in the outer side, but three different spatial distribution at the point of 1.4km and 3.8km in the inner side. In other words, traffic access does not necessarily guarantee high housing price since the graphs shows land price related to composite spatial distribution. This implies that residential environments (highway noise and regional discontinuity) and traffic accessibility cause mutual interaction to generate this phenomenon. Therefore, the highway IC landprice model will be beneficial for calculation of land price in New Town which constantly is being built along the highway.

A Conspicuity Effect Study of Fluorescent Orange Color Traffic Sings for Work Zone Application (공사구간 형광주황색 교통안전표지 적용에 따른 주목성 효과 연구)

  • Ko, Sangkeun;Choi, Keechoo;Lee, Sang-Soo;Yun, Ilsoo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.5D
    • /
    • pp.437-444
    • /
    • 2012
  • This study intended to improve traffic safety in work zones using fluorescent orange color traffic signs. For this end, the current problems of existing traffic signs and facilities in work zones were analyzed and some good examples of foreign countries were compared. More specifically, in order to identify current problems, the basic shape and color of traffic signs in use were examined through literature review, surveys and field studies. It was found that the fluorescent color worked more effectively than other colors in terms of visibility and conspicuity in work zone sign system. For evaluation, both Conspicuity surveys and in-door simulator experiments were conducted to effectively assess the merits and demerits of different types of traffic signs for work zones. The results of evaluations showed that black lettering on a fluorescent orange background outperformed more than 70% in terms of visibility and ability to call drivers' attention compared with those from black/red lettering on yellow/white backgrounds currently used at work zones on expressways and national highways. In addition, simulated driving experiment disclosed that drivers recognized the fluorescent orange background sign 15m ahead compared with the yellow background sign and 25m ahead compared with the white background sign, respectively. As for the diamond-shaped "Under Construction" sign, drivers recognized fluorescent orange background 11m ahead compared with the yellow background sign and 19m ahead compared with the white background sign, respectively.

The Proper Length of Transition Area for Work Zones on Urban Freeways (도시고속도로 공사구간의 적정 완화구간 길이 산정)

  • Lee, Mi Ri;Lee, Chungwon;Kim, Do-Gyeong
    • Journal of Korean Society of Transportation
    • /
    • v.31 no.4
    • /
    • pp.58-66
    • /
    • 2013
  • Due to the characteristics of urban freeways such as heavy traffic and high speed, work zone on urban freeways causes the increase of not only the likelihood of crash occurrence but also traffic congestion caused by lane drop, lane change, acceleration/deceleration, and etc. This paper aims to determine the proper length of transition area that satisfies two criteria, mobility and safety, to make the operation of work zone more efficient. For the analysis, three different scenarios were developed by the number of lanes and the proper length of transition area were determined by changing the length from 100m to 500m in 100m increments. The results showed that the proper length of transition area for 3- and 4-lane freeways is 300m, whereas the proper length of 2-lane freeways is 200m. The results indicated that the different length of transition area based on the number of lanes is more desirable and efficient.

An Investigation on the Propriety of Ratio-Unit Price Method for Estimating Demolition Cost (해체 공사 원가분석을 통한 비율단가 적용방식의 적정성 검토)

  • Sung Nak-won;Kim Young-suk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.579-583
    • /
    • 2004
  • A new and extendable highway should be planned and budgeted by estimating the total construction cost on the basis of the precise cost data. However, the demolition or disjointing cost could not reflect construction site condition sufficiently because it was simply estimated by multiplying the highway structure installation cost by the regular ratio($10\~70\%$) specified in the Korea Standard Estimate. The regular ratio for estimating of demolition and disjointing cost was calculated by not actual construction cost data but subjective experiences of field manager. Therefore, the reliance of the estimated demolition or disjointing cost has been declined. The primary objective of this study is to purpose the standard for estimating proper demolition or disjointing cost of relevant items through various site analysis and survey, and to investigate on the propriety of ratio-unit price method for estimating demolition and disjointing cost.

  • PDF

An Analysis on Service Usage of Traffic Information on the Expressway (고속도로 교통정보 서비스에 대한 이용실태 분석)

  • Oh, Dong-Seob;Oh, Young-Tae;Jo, Soon-Gee;Hong, Eun-Joo
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.8 no.5
    • /
    • pp.12-25
    • /
    • 2009
  • The purpose of this study is to identify and analyze drivers' attitude related to usage of traffic information and traffic management service. A sample survey on Seohaeanseon Expressway(15), Gyeongbu Experssway(1), Youngdong Expressway(50) was conducted to analyze drivers' attitude ; sample size is 304 with 95% of confidence level and ${\pm}3.6%$ of sampling error. The analysis lists of drivers' attitude are usage of traffic information, awareness about information dissemination devices, and awareness about traffic control information related to LCS or RWIS. The results of this study is that drivers want pre-trip information, voice-based Hi-pass OBU, and fast incident management. According to the IPA, KEC's main consideration is a traffic flow improvement.

  • PDF

고속도로상에서의 타이어 점검

  • Song, Yeong-Gi
    • The tire
    • /
    • s.109
    • /
    • pp.40-44
    • /
    • 1983
  • 당협회에서는 금년도에도 교통부, 치안본부, 한국도로공사의 후원으로 4차에 걸쳐 고속도로의 휴게소에서 무료 타이어 점검 및 서비스를 실시하였다. 금년도의 점검결과도 예년과 마찬가지로 타이어 정비불량률이 무려 45%에 달하고 있으며, 차종별로는 승용차가 53%로 가장 불량한 것으로 나타났으나, 이는 주로 공기압부적 차량이고, 실제로 타이어 정비상태가 가장 불량한 것은 트럭으로서 52%였다. 정비불량항목으로는 과마모가 제일 많아 전체 타이어 정비불량건수중 43%를 차지하였으며 트럭에 가장 많았다. 특히 관광버스에는 재생 타이어 취부률이 35%나 되었고 또한 트럭에는 눈올 때에만 사용토록 되어 있는 스노 타이어를 봄, 여름, 가을까지 계속 사용하고 있는 차량이 13%나 되어 발열에 의한 트레드 세페레이션 (Tread SEparation) 사고의 위험성이 많았다.

  • PDF

건설안전리포트: GS건설 강남순환도시고속도로 6-1공구 -'안전'으로 '재해'라는 암반을 부순다

  • Choe, Jong-Deok
    • The Safety technology
    • /
    • no.158
    • /
    • pp.12-14
    • /
    • 2011
  • 서울 관악구 신림동에 위치한 강남순환도시고속도로 6-1공구, 이곳은 연장 155m의 터널을 뚫는 현장으로, 시공 초기인 현재는 발파작업이 한창 진행되고 있다. 발파작업은 다량의 폭약이 수시로 사용되는 만큼 위험성이 상당히 높은 공정 중 하나다. 하지만 이곳 현장의 모습을 보면 정말 위험공정이 맞나하는 의구심이 들게 된다. 그만큼 안전관리가 철저하다는 얘기다. 수차례에 걸친 시험발파를 통해 진동과 소음을 최소화한 발파작업이 이뤄지고 있으며, 작업 시 대응절차에 나서는 근로자들의 모습도 일사불란하기 그지없다. '안전'으로 터널공사의 새로운 교과서를 만들겠다는 이곳 현장을 찾아가 그들만의 특별한 안전활동을 살펴봤다.

  • PDF

Analyzing Environmental Impacts in Construction Project at Different Ownership - Focus on Express Road Pavement Process - (공공발주자와 민간기업 측면의 건설공사 온실가스 환경비용 영향분석 - 고속도로 포장공종을 중심으로 -)

  • Jang, Woo Sik;Park, Heedae;Han, Seung Heon;Jeon, Jong Seo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.1D
    • /
    • pp.111-117
    • /
    • 2011
  • In the wake of increased concerns on reduction of greenhouse emission which started with United Nation's Framework Convention on Climate Change (UNFCCC) and Kyoto protocol, Korean government is making various efforts under the represented slogan "Low Carbon, Green Growth". Therefore, it is inevitable that construction industry also follow the Korea government's slogan and the international trend in environmental problems. This study identified several main construction materials and equipments of civil construction projects and suggested a environmental cost estimation method and related estimation standards (Public and private owners are distinguished). A case analysis of a real road construction project is also performed and characteristics according to the owner type is compared. This study analyzed the environmental impact to total construction cost variations. In the result, public owner required 11~16% of extra budget and private owner required 19~22% of extra costs. This study is limited in consideration of environmental factors and carbon trading prices.