• Title/Summary/Keyword: 계통 동기화

Search Result 63, Processing Time 0.028 seconds

Black Start and Synchronization of Microgrid Considering Distributed Generation Control (분산전원의 제어 특성을 고려한 마이크로그리드의 블랙 스타트 및 계통 동기화 전략)

  • Choi, Jin-Young;Won, Dong-Jun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.62 no.7
    • /
    • pp.898-904
    • /
    • 2013
  • In order to minimize the damage from power outage, power system should be restored quickly. In this paper, a procedure for the restoration of microgrid is proposed. After elimination of the causes of power outage, a black start algorithm is executed by considering the characteristics of distributed generation control. After all resources have been recovered to the normal state, a grid reconnecting algorithm for stable operation in grid-connected mode is performed. In order to verify the proposed algorithm, low voltage microgrid is simulated using PSCAD/EMTDC.

Improved grid synchronization technique based on adaptive notch filter (노치 필터 기반의 개선된 계통 동기화 기법)

  • Jung, Hoon-Young;Ji, Young-Hyok;Kim, Jae-Hyung;Lee, Su-Won;Won, Chung-Yuen;Kim, Jin-Uk;Lee, Byoung-Kuk
    • Proceedings of the KIPE Conference
    • /
    • 2009.11a
    • /
    • pp.209-211
    • /
    • 2009
  • A digital grid synchronization technique is needed for distributed generation system to make output current sinusoidal even if the grid voltage is distorted by harmonics. In this paper, a digital grid synchronization technique based on adaptive notch filter is proposed. The analysis of proposed technique is performed through the consideration of grid synchronization technique based on PLL and FLL, and the validity of the proposed method was confirmed by simulation results.

  • PDF

Digital PLL Control for Phase-Synchronization of Grid-Connected PV System (계통 연계형 태양광 발전 시스템의 위상 동기화를 위한 디지털 PLL 제어)

  • 김용균;최종우;김흥근
    • The Transactions of the Korean Institute of Electrical Engineers B
    • /
    • v.53 no.9
    • /
    • pp.562-568
    • /
    • 2004
  • The frequency and phase angle of the utility voltage are important in many industrial systems. In the three-phase system, they can be easily known by using the utility voltage vector. However, in the case of single phase system, there are some difficulties in detecting the information of utility voltage. In conventional system, the zero-crossing detection method is widely used, but could not obtain the information of utility voltage instantaneously. In this paper, the new digital PLL control using virtual two phase detector is proposed with a detailed analysis of single-phase digital PLL control for utility connected systems. The experimental results under various utility conditions are presented and demonstrate an excellent phase tracking capability in the single-phase grid-connected operation.

$^13C_2H_2$ 기체의 1.54949$\mu$m 흠수선을 이용한 OFDM 통신의 광 동기신호 발생장치

  • 조규만;이용구;강민희;김종희
    • Proceedings of the Optical Society of Korea Conference
    • /
    • 1995.06a
    • /
    • pp.30-34
    • /
    • 1995
  • 13C2H2분자의 1.54949$\mu$m 회전-진동 전이 흡스선을 이용하여 DFB LD의 발전주파수를 안정화 시킴으로써 이를 주파수대욕 광 다중통신(OFDM)의 표준주파수를 광동기 신호로 활용하는 방안에 대하여 연구하였다. 본 연구에서는 DFB LD의 발진주파수의 변화에 따른 기체 Cell의 투과한 빛의 세기의 변화를 연산 처리하여 이를 안정화 Loop에 대한 error 신호로 사용하여 줌으로써 MHz 이내에 주파수 안정도를 갖는 광 동기신호를 구성하였다. 이러한 안정화 방법을 이용하여 이제까지 제안된 다른 방법에 비하여 광학계통과 광신호처리 과정을 크게 단순화 된, 또한 동작중 자체 진단 및 자동복구 기능을 갖춘 이상적인 신호를 구성하였다.

  • PDF

Improved Phase Detection Technique under Frequency Variation of Single-Phase Power System (단상 계통의 주파수 변화시 개선된 위상검출 기법)

  • Park, Jin-Sang;Lee, Dong-Choon
    • Proceedings of the KIPE Conference
    • /
    • 2013.07a
    • /
    • pp.506-507
    • /
    • 2013
  • 본 논문은 단상 전원 시스템에서 입력전원의 위상각 추정에 2차 일반화 적분기(Second-Order Generalized Integrator - SOGI)를 기반으로 하는 적응 필터구조를 적용한다. SOGI 출력은 전원 위상각과 관련되고, 올바른 출력을 위해서는 중심 주파수 ${\omega}^{\prime}$이 전원 주파수를 빠르게 추정할 수 있도록 FLL(Frequency Locked Loop)제어가 필요하다. SOGI-FLL의 기존의 방법과는 다르게 비선형 특성이 강한 주파수 동기화 동특성 모델에 퍼지제어를 적용함으로써 복잡한 선형화 과정이 필요하지 않으며, 실시간 이득 조절로 빠르게 전원 주파수 추정을 할 수 있는데 이는 최종적으로 빠른 전원 위상각 추정을 의미한다. 제안된 방법에 대해서 시뮬레이션을 통하여 그 타당성을 검증한다.

  • PDF

Accurate Calculation of RMS Value of Grid Voltage with Synchronization of Phase Angle of Sampled Data (샘플링 시점의 위상각 동기화를 이용한 계통전압 실효값의 정확한 계산 방법)

  • Ham, Do-Hyun;Kim, Soo-Bin;Song, Seung-Ho;Lee, Hyun-Young
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.23 no.6
    • /
    • pp.381-388
    • /
    • 2018
  • A novel and simple algorithm for accurate calculation of RMS voltage is proposed in a digitally controlled grid-tie inverter system. Given that the actual frequency of grid voltage is continuously changing, the constant sampling frequency cannot be a multiple number of the fundamental frequency. Therefore, the RMS of grid voltage contains periodic oscillations due to the differences in the phase angle of sampled data during calculation. The proposed algorithm precisely calculates and updates the initial phase angle of the first sampled voltage in a half-cycle period using phase-locked loop, which is commonly utilized for phase angle detection in grid-tie inverter systems. The accuracy and dynamic performance of the proposed algorithm are compared with those of other algorithms through various simulations and experiments.

Development of Long-Distance Subsea Cable Uninterrupted Laying Method and Equipment for the Construction of Power System In Island (도서지역 전력계통 구성을 위한 장거리 해저케이블 비개착 포설 공법 및 장비개발)

  • Lee, Jaedeuk;Park, Changyong
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.7 no.2
    • /
    • pp.227-231
    • /
    • 2021
  • 해저케이블 설치시 고비용, 민원발생, 환경오염 논란 등의 이슈가 많은 개착식 공법을 대신하여 현장에서 점차 친환경적 공법으로 자리 잡고 있는 비개착식 공법을 이용한 전력설비 건설이 활발하게 논의되고 있다. 본 논문에서는 이런 새로운 시도를 위해 필수적인 장거리 케이블 포설에 대한 새로운 방법을 현장실증을 통한 Data 확보 및 장비개발로 새롭게 제시하였다. 케이블 포설시 밀어주는 장비인 Pusher, 기존의 윈치와 Pusher 의 속도를 동기화시키는 장치 및 케이블을 꼬임없이 당기기 위한 다도체용회전형풀링아이 등을 개발하여 기존에 설치하였던 해저용특수케이블이 아닌 현재 일반적으로 사용중인 케이블의 포설가능 거리를 증가시켜 도서지역 전력공급 등을 위한 장거리케이블 포설에 비개착식 방식이 적용 가능 토록 새로운 케이블 포설공법을 개발하였다.

Study of a Overcurrent Synthetic Circuit Test for Thyristor Switched Capacitor of Static Var Compensator. (SVC TSC Valve의 과전류 합성시험에 관한 연구)

  • Lee, Jin Hee;Kim, Young Woo;Zhen, Yuan;Jung, Teag Sun;Baek, Seung Taek
    • Proceedings of the KIPE Conference
    • /
    • 2014.11a
    • /
    • pp.163-164
    • /
    • 2014
  • 전력계통은 전력수요의 지속적인 성장에 따라서 전력설비의 추가를 지속적으로 추진하고 있지만, 심해지는 환경문제 등으로 인해 용지 확보에 어려움이 있다. 이로 인해 송전선로 장거리화, 용량부족량 등 전력계통에 여러 가지 복잡한 문제가 야기되는데. 이것은 곧 전력계통의 안정도와 직결된다. 이러한 문제를 효과적이면서 경제적인 해결방법으로 FACT(Flexible AC Transmission System)기술이 주목 받고 있다. FACTS 기기 중 SVC(Static Var Compensator)는 상용운전 중이며, 기존 동기조상기에 비해 저렴하고, 신속 정확한 전압제어를 하는 장점이 있다. SVC는 TCR(Thyristor Controlled Reactor)과 TSC(Thyristor Switched Capacitor), FC(Fixed Capacitor)등 여러 종류의 구성을 가지고 있다. 합성시험회로설비(Synthetic Test Circuit)는 Thyristor로 구성된 TCR, TSC Valve를 실제 운전조건으로 동작시켜 SVC Valve의 신뢰성을 검증하는 설비이다. 특히, TSC Valve는 운전시 초기 과전류가 발생하는 운전특성상 이에 대한 평가기준에 따른 시험을 통해 신뢰성을 반드시 검증하여야 한다. 본 논문에서는 IEC 61954에서 제시하는 시험평가 기준에 의거하여 TSC의 Overcurrent Test를 위한 STC 평가 방법를 기술하고 설계된 TSC 시험을 위한 STC topology와 Simulation으로 검증 방법을 기술한다.

  • PDF

Synthetic Circuit for Thyristor controlled Reactor of Static Var Compensator operational Test (SVC의 TCR Operational Test를 위한 합성시험회로)

  • Kim, Young Woo;Lee, Jin Hee;Jung, Teag Sun;Baek, Seung Taek;Chung, Young Ho
    • Proceedings of the KIPE Conference
    • /
    • 2014.07a
    • /
    • pp.51-52
    • /
    • 2014
  • 전력계통은 전력수요의 지속적인 성장에 따라서 전력설비의 추가를 지속적으로 추진하고 있지만, 심해지는 환경문제 등으로 인해 용지 확보에 어려움이 있다. 이로 인해 송전선로 장거리화, 용량부족량 등 전력계통에 여러 가지 복잡한 문제가 야기되는데, 이것은 곧 전력계통의 안정도와 직결된다. 이러한 문제를 효과적이면서 경제적인 해결방법으로 FACT(Flexible AC Transmission System)기술이 주목 받고 있다. FACTS 기기 중 SVC(Static Var Compensator)는 상용운전 중이며, 기존 동기조상기에 비해 저렴하고, 신속 정확한 전압제어를 하는 장점이 있다. SVC는 TCR(Thyristor Controlled Reactor)과 TSC(Thyristor Switched Capacitor), FC(Fixed Capacitor)등 여러 종류의 구성을 가질 수 있다. TCR과 TSC는 실제 운전에 앞서 여러 가지 방법으로 검증이 필요하다. 합성 시험회로 설비(Synthetic Test Circuit)는 TCR과 TSC 안에 존재하는 Thyristor Valve의 동작을 실제 동작 조건으로 동작시켜, 동작의 신뢰성을 검증하는 설비이다. 본 논문에서는 TCR의 Operational Test를 위한 STC를 기술하고 있다. 설계된 STC는 PSCAD를 사용하여 검증하였다.

  • PDF

Evaluation on Long-Term Reliability of HVDC Submarine Cable (HVDC 해저케이블 장기과통전 신뢰성 시험평가 방법)

  • Yang, B.M.;Park, J.W.;Moon, K.H.;Noh, T.H.;Kim, Y.S.;Kang, J.W.
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.377_378
    • /
    • 2009
  • HVDC 케이블은 장거리 전력전송, 국가간 계통연계, 비동기 전력계통연계, 전력의 시장화에 따른 전력공급 제어 필요에 따라 세계적으로 널리 사용되고 있다. 국내에서는 현재 유일하게 제주-해남간 180kV HVDC 해저케이블이 운영 중에 있으며, 향후 제주도의 안정적인 전력공급을 위하여 2011년에 제주-육지간 250kV HVDC 해저케이블이 추가로 건설될 예정이다. 그래서 HVDC 해저케이블의 신속 정확하게 안정적이고 신뢰성 있는 운영을 위해서 국내에서 자체 개발한 HVDC 해저케이블에 대한 장기과통전 시험에 대한 평가 및 절차가 필요하게 되었다. 본 논문에서는 HVDC 해저케이블의 장기과통전 시험평가를 위하여 전기적 시험은 CIGRE에서 권고하고 있는 Electra 189, 219에 근거하고 기계적 시험은 IEC 60055-1, Elecrta 171에 근거하여 기술하고자 한다.

  • PDF