• Title/Summary/Keyword: 경쟁입찰

Search Result 188, Processing Time 0.023 seconds

Bidding Strategics in Competitive Electricity Market (경쟁시장에서 입찰전략 수립에 관한 연구)

  • Ko, Young-Jun;Lee, Hyo-Sang;Shin, Dong-Jun;Kim, Jin-O
    • Proceedings of the KIEE Conference
    • /
    • 2001.07a
    • /
    • pp.550-552
    • /
    • 2001
  • The vertically integrated power industry was divided into six generation companies and one market operator, where electricity trading was launched at power exchange. In this environment, the profits of each generation companies are guaranteed according to utilization of their own generation equipments. Especially, the electricity demand shows seasonal and weekly regular pattern, which the some capacity should be provided into ancillary service based on the past demand forecasting error and operating results of electricity market. Namely, if generation cost function is applied to SMP and BLMP as announced the previous day, the available generation capacity of the following day could be optimally distributed, and therefore contract capacity of ancillary service applied to CBP(Cost Based Pool) and TWBP(Two-Way Bidding Pool) is determined. Consequently, it is Possible to use the retained equipments optimally. This paper represents on efficient bidding strategies for generation equipments through the calculation of the contract and the application of each generator cost function based on the past demand forecasting error and market operating data.

  • PDF

우리나라 최초공모주(最初公募株)의 과도한 저가발행(低價發行)에 대한 원인분석과 개선방향

  • Jeong, Seong-Chang
    • The Korean Journal of Financial Management
    • /
    • v.9 no.2
    • /
    • pp.149-168
    • /
    • 1992
  • 본 연구의 목적은 우리나라에서 발행가격 결정을 발행회사와 주간사회사에게 완전 자율화 하였음에도 불구하고 우리나라의 최초공모주(最初公募株)는 왜 이처럼 과도하게 저가발행(低價發行)되고 있는가에 대하여 원인을 규명하고 그에 따른 해결책을 제시하고자 함에 있다. 발행가격결정 자율화 기간동안의 자료를 이용하여 실증적 분석을 한 결과, 우리나라의 저평가는 미국보다 통계적으로 유의하게 큰 것으로 확인되었다. 이러한 이유를 규명하기 위하여 이론적 모형을 제시하고, 우리나라와 미국을 중심으로한 다른 국가들의 발행가격 결정과정에 대한 제도적인 차이점을 검토하였다. 이론적 모형에서는 발행기업과 주간사회사가 수요의 크기를 예측하여 수요의 불확실성 정도가 낮으면 저평가의 크기가 적어진다는 것을 보였다. 제도적인 차이점들을 검토해 본 결과, 우리나라의 발행가격결정이 일반투자자들의 수요를 전혀 고려하지 않는 공급자의 사전가격결정방식을 택하고 있음에 반해, 미국에서는 발행가격대를 표기한 예비사업설명서와 로드쇼우(Road Show) 둥을 통해 투자자들의 수요예측을 하고 있으며 일본이나 프랑스는 발행주식의 일부를 경쟁 입찰에 부침으로써 투자자들이 발행가격결정에 참여하여 발행가격결정의 합리성을 유지하고 있다. 따라서, 우리나라의 저평가의 크기가 다른 국가들에 비하여 큰 이유는 우리나라의 공모주 발행가격 결정과정에서 투자자의 수요를 전혀 고려하지 않기 때문일 수 있으며, 이러한 저평가의 크기를 줄이기 위해서는 어떠한 형태로든지 발행가격 결정과정에 실수요자인 일반투자자가 참여하는 방식이 채택되어야 한다.

  • PDF

A Study of Commercial Rental Properties within a Large Complex Facility by Measuring the Spatial Structure (공간 구조와 보행량 측정을 통한 대형 복합시설물 상가 임대료 특성에 관한 연구)

  • Hwang, Jae-Hong;Ahn, Byung-Ju;Kim, Ju-Hyung;Kim, Jae-Joon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.6
    • /
    • pp.87-96
    • /
    • 2010
  • This research analyzed the location of stores using a space syntax analysis model to measure the location of building interior stores in a quantitative way. Measure walk population of each space and analyzed analysis model and actuality measurement rent and difference to calculate value of store. With this, analyzed mad effect factor to rent. Drew effect factor of rent which is appropriated present. Had cleared that rent which consider walk population is required.

An Investigation into Factors Influencing Competition Intensity in the Online Auction: A Mediating Role of Perceived Price Fairness (온라인 경매에서 인지된 가격공정성을 매개로 한 입찰경쟁 강도 영향요인에 관한 연구)

  • Park, Sang-Cheol;Kim, Jong-Uk
    • Asia pacific journal of information systems
    • /
    • v.17 no.1
    • /
    • pp.95-121
    • /
    • 2007
  • There are recently several studies of online auctions which have focused on exploring a bidder's bidding behavior in IS area. Those studies, however, have been limited to account for bidders' bidding behavior in the view of TAM and trust, not considering perceived price fairness and competition intensity. Although this view point seems reasonable in the online auction sites, few previous studies employing this perspective are found in the relevant literatures. Based on it, this study developed a comprehensive model based on trust and TAM in terms of perceived price fairness to explain competition intensity in the online auction sites. This study collected 269 survey responses from online bidders who have prior experiences with online auction sites. The survey data are used to empirically verify 11 research hypothesis by using LISREL. The results indicate that trust in websites, trust in sellers and perceived usefulness have significant impacts on perceived price fairness. Finally, perceived price fairness is strongly related to competition intensity in the online auction. This study ends with theoretical and managerial implications, as well as limitations and future research.

Identifying Risks of Power Plant EPC Business in the Middle East and Analyzing their Priority by the AHP (중동지역 발전플랜트 EPC사업의 리스크 발굴 및 AHP분석방법을 통한 우선순위 도출)

  • Kim, Jongwoo;Lee, Jae-Heon
    • Plant Journal
    • /
    • v.11 no.3
    • /
    • pp.32-45
    • /
    • 2015
  • 중동지역을 필두로 하여, 국내건설사들은 시공분야에서의 높은 경쟁력을 바탕으로 매년 놀라운 속도로 해외 플랜트 EPC 건설시장에서의 점유율을 높여 나가고 있다. 2012년에는 전 세계 건설시장의 8.1%를 점유하며, 이탈리아를 제치고 역대 최고인 세계 6위의 건설 강국으로서의 면모를 과시하기도 하였다. 그럼에도 불구하고, 그간 수주 자체를 목적으로 한 저가입찰 등과 같이 리스크를 간과한 무리한 수주는 폭탄의 뇌관을 건드리는 격이 되었고, 결국 2013년 일부 대형 건설업체들은 해외 사업장에서 대규모 손실을 경험하였다. 이와 더불어, 해외 대규모 EPC 플랜트 사업의 수주금액이 급증하여 한 개의 사업에서 발생되는 손실이 기업의 총체적 경영에도 큰 영향을 미칠 수 있게 됨에 따라, EPC 플랜트 건설사업의 잠재 손실의 원인을 최소화하고 건설사들의 지속적인 성장을 가능하게하기 위해서 리스크를 효율적으로 관리해야 하는 필요성은 더욱 증가하였다. 따라서, 본 연구에서는 해외건설시장 중, 중동지역에서 EPC 형태로 발주되는 발전플랜트 건설사업의 리스크 요인들을 발굴하고, AHP (Analytic Hierarchy Process) 기법을 사용하여 리스크 요인들 간의 우선순위를 정량적으로 도출하여, 국내건설사들이 중동지역의 EPC 사업수행 현장에서 효율적으로 리스크를 관리할 수 있도록 도움을 주고자 하였다.

  • PDF

Partnering Strategy for Bidding Success in World Bank's Vietnam Consulting Project (ODA 컨설팅 사업 낙찰을 위한 기업의 협업 전략 도출 - 세계은행의 베트남 사업을 중심으로 -)

  • Lee, Jiseop;Lee, Jeonghun;Han, Seung Heon;Kang, Sin Young
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.6
    • /
    • pp.1021-1028
    • /
    • 2018
  • As entering the international construction market became more difficult than the past, ODA projects can be a breakthrough for domestic engineering companies to enter the international market. However, since many companies compete for limited projects, it is necessary to reinforce the competitiveness of bidding success. The competitiveness is the result of accumulating experience, reputation, and networking through partnering. Therefore, depending on which partnering strategy has been taken over a long period, the bidding success is decided. The objective of this study is to identify the effective partnering strategy for bidding success. For this, the World Bank bid results, focusing on consulting projects in Vietnam, are collected. Using the bid results, inter-firm network representing the partnering relationship is constructed and the Social Network Analysis is conducted. After then, by conducting the Logistic Regression Analysis, effective partnering strategies are suggested. The result shows that the diversification strategy is advantageous for transportation and city development projects and the concentration strategy is advantageous for water projects. The partnering strategy for the consulting project proposed in this study will be used as a reference for the domestic engineering companies to enter the Vietnam construction market in the future.

Need to Reduce Industrial Accidents through the Introduction of an Prevailing Wage System (적정임금제 도입을 통한 산업재해 감축 필요성 고찰)

  • Choonhwan Cho;Yeoncheol Shin;Kyung-Bo Han
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.1
    • /
    • pp.1-9
    • /
    • 2023
  • In order to carry out construction work, it is urgent to introduce a proper wage system so that the cost burden of projects that have been won due to bleeding competition among original government buildings based on low-priced bids can be transferred to subcontractors. Purpose: Construction with illegal multi-level industrial structure needs to improve the wage reduction environment leading to order (100%) → original contractor (80%) → subcontractor (65%) → load contractor (65%) and aims to ensure wages for end workers. Method: Investigate the current status of labor cost appropriate payment plan in the construction industry, and investigate the case of the appropriate wage system (P.W) in the United States. In addition, the effect and direction of the appropriate wage system are presented. Result: Individual minimum wage security was also mentioned in the Constitution, and many researchers suggested that only the introduction of an appropriate wage system could solve the problem of reducing worker labor and ensure quality and safety. Conclusion: The proper wage system in the construction industry will block illegal multi-level and illegal foreign work, improve the labor environment in the construction market, create an influx of young workers, and have a significant impact on the construction industry's competitive structure, safety, and quality.

Business Process Model for Progress Phase of Design-Build Project (설계시공일괄방식 사업의 진행단계별 업무프로세스 모델)

  • Song, Young-Woong;Son, Bo-Sik;Chun, Jae-Youl;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.38-49
    • /
    • 2009
  • In public project market, design-build projects have been increased because of market trend change which enables technical competition. In this condition, its importance is also getting important. Generally, life cycle of design-build project consists of planning, preliminary design, procurement, contract, detail design, start of construction, construction, end of construction, and evaluation. From contractor's viewpoint, it has problems such as difficulties in project management and information sharing because of frequent change of charged division. To solve these problems, it is desirable to change from function-based management system to process-based management system. The purpose of this study is to develop management process model for design-build project by progress phases. This study analyzed main conflicts and decision making factors of each stage in design-build projects, then systemized management subjects' responsibilities and management points' change. And also this study defined the key information that is the key point by project characteristics and progress phases. Based on this analysis, this study did business process modeling from planning stage to construction design check stage. At last, we proposed the way to manage business process by design-build project progress.

Successful Winning Award Factors in Early Stage of International Public Private Partnership Projects (해외개발사업 발굴단계의 수주성공요인 분석)

  • Jung, Wooyong;Han, Seungheon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.3
    • /
    • pp.84-94
    • /
    • 2017
  • Recently, domestic construction companies have increasingly engaged in international PPP projects a result of both uncertainties in the domestic construction market and low competitiveness in international EPC project business. These international PPP projects usually require long-term preparations and substantial sales costs, which make it important for decision-makers to select winning-award potential project in early stage of the projects. However, most previous research has analyzed success factors in terms of project development across all stages. Thus, this study investigated 28 success factors of 4 categories in the early stage of 31 international PPP projects. First, results indicate that unsolicited PPP projects require better implementation capabilities and financial conditions compared to solicited PPP projects. Second, implementation capability is important because it is not easy to improve as the project proceeds. Third, commercial conditions are identified as important even if conditions are not fixed in the early stage of PPP projects. Fourth, non-commercial conditions, strategy, and public interest are not found to be meaningful in the early stage of PPP projects because they can vary as the project proceeds. This study helps to improve selection criteria aimed towards more winning-award potential project in the early stage of international PPP projects.

Development of an Algorithm for Automatic Quantity Take-off of Slab Rebar (슬래브 철근 물량 산출 자동화 알고리즘 개발)

  • Kim, Suhwan;Kim, Sunkuk;Suh, Sangwook;Kim, Sangchul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.5
    • /
    • pp.52-62
    • /
    • 2023
  • The objective of this study is to propose an automated algorithm for precise cutting length of slab rebar complying with regulations such as anchorage length, standard hooks, and lapping length. This algorithm aims to improve the traditional manual quantity take-off process typically outsourced by external contractors. By providing accurate rebar quantity data at BBS(Bar Bending Schedule) level from the bidding phase, uncertainty in quantity take-off can be eliminated and reliance on out-sourcing reduced. In addition, the algorithm allows for early determination of precise quantities, enabling construction firms to preapre competitive and optimized bids, leading to increased profit margins during contract negotiations. The proposed algorithm not only streamlines redundant tasks across various processes, including estimating, budgeting, and BBS generation but also offers flexibility in handling post-contract structural drawing changes. In particular, the proposed algorithm, when combined with BIM, can solve the technical problems of using BIM in the early phases of construction, and the algorithm's formulas and shape codes that built as REVIT-based family files, can help saving time and manpower.