• Title/Summary/Keyword: 경로산정

Search Result 290, Processing Time 0.029 seconds

방음벽의 효과산정 및 설치현황

  • 정일록
    • Journal of KSNVE
    • /
    • v.3 no.3
    • /
    • pp.199-201
    • /
    • 1993
  • 소음공해에 대한 대책은 크게 나누어 소음발생원의 음량을 원천적으로 저감시키는 저소음화대책, 소음 전파경로상에서의 차음대책, 피해자의 거주공간 자체에 대한 방음대책 등을 들 수 있다. 여기서는 교통소음과 같은 선음원에 대한 전파경로상의 차음방법으로 가장 보편화되어 있는 방음벽에 대해서, 그 효과산정 및 설치현황 등을 개략적으로 소개하고자 한다.

  • PDF

Load Balanced Cost Calculation Scheme for Efficient Precomputation of QoS Routes (QoS경로의 효율적인 선계산을 위한 부하균등 비용산정 방식)

  • 홍종준;김승훈;이균하
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.26 no.11C
    • /
    • pp.140-147
    • /
    • 2001
  • In this paper, we propose a scheme of calculating resources\` costs for precomputation in QoS routing schemes. This scheme is effective in respect to the g1oba1 network utilization and the balanced use of network resources. We also propose a QoS routing scheme for transit and intra traffic in a large scale of domain-based network. For a domain in the network, the routing scheme first precomputes multiple paths between all pairs of ingress and egress border routers while considering balancing of the expected load and then selects paths with the probability of path selection. We, therefore, expect that the paths are better than any other paths in respect to reserving the network resources on paths. The routing scheme combines inter and intra domain routings seamlessly and uses the same cost calculation scheme. And for analysis of a load balancing cost calculation proposed a simulation is done.

  • PDF

Load Balanced QoS Routing for Precomputation of QoS Routes (QoS 경로의 선계산을 적용한 부하분산 QoS 라우팅)

  • 홍종준
    • Journal of Korea Multimedia Society
    • /
    • v.6 no.1
    • /
    • pp.121-127
    • /
    • 2003
  • In this paper, we propose a load balancing QoS routing on a targe scale network. We use the scheme in which it calculates the cost of resources with a precomputation and then selects a path among multiple paths based on the calculated cost for each resources. We also use the QoS routing scheme for the transit and the intra-traffic on a large scale domain-based network. For a domain in networks, this routing scheme precomputes K multiple paths between all pairs made up with each ingress and egress border routers along with the consideration of a load balancing, and then picks up paths having the high probability on the Path selection. This routing scheme can be applied for the transit traffic and the intra traffic and combines the Inter-domain and intra-domain routings seamlessly and put a high priority on the transit traffic Thus, these schemes make Possible both the global use of network resources and the load balancing.

  • PDF

Predictive and Strategic VMS Control to Cope with Overreaction and Concentration Problem (VMS의 과도반응과 통행집중 문제를 고려한 예측적인 운영전략)

  • Park, Eun-Mi
    • Journal of Korean Society of Transportation
    • /
    • v.22 no.4 s.75
    • /
    • pp.107-116
    • /
    • 2004
  • VMS를 통한 정보제공에는 과도반응과 통행집중의 위험부담이 따른다. 즉 대안경로간에 이루어져야 할 통행배분을 정확히 유도할 수 있는 VMS 메시지란 존재치 않는다. VMS 메시지에 의해 특정 경로가 교통상황이 타 경로에 비해 좋다고 정보가 주어질 때, 그 정보에 대한 과도반응과 그 특정경로에 대한 통행집중 문제가 발생하여 정보제공에 의해 오히려 상황이 악화될 수 있다. 본 연구에서는 대안경로간의 물리적 특성 측면에서 우열이 있는 가상 네트워크를 대상으로 하여, 과도반응과 통행집중 문제를 극복하고 대안경로간의 적절한 통행배분을 달성하기 위한 VMS 운영알고리즘을 개발하는 것을 목표로 한다. VMS정보제공 결과, 즉 VMS를 통해 상황이 좋다고 알려준 경로에 통행이 집중할 경우 문제가 될 것인가 여부를 미리 예측해 보고, 문제가 될 경우 정보제공 전략을 수정하도록 하는, 피드백 제어에 예측적 방식을 접목하였다. 본 연구에서 제안한 알고리즘의 주요 기능은 다음과 같다. 1. 교통량, 속도 등에 대한 실시간 모니터링 시스템이 구축되어 있음을 전제로 한다. 2. 실시간 제어에는 모니터링 결과와 이에 근거한 정보제공전략의 시행사이에는 시간차가 존재한다. 이러한 시간차이로 인하여 단기예측이 필요하고, 이를 수행하는 모듈이 있다. 3. 정보제공 결과로 특정 경로에 과부하가 걸리는지 여부를 예측하기 위하여, 그 판단기준으로 그 경로의 실제 용량 산정이 필요하다. 이에 혼잡의 시공간적 전개에 따라 변하는 동적 용량을 산정하는 모듈이 있다. 4. 대안 경로간 통행배분 목표치를 수리적으로 산정할 수는 있으나, 이를 자동적으로 이루어 주는 메시지는 존재하지 않는다. 아울러 현실적으로 예측 불가능한 외란을 모형에 의존하여 예측하기 보다는, 계속적인 피드백 레귤레이터(Regulator) 작동에 의해 보정하여 목표를 달성해 가는 자동제어 기능을 갖고 있다.

Route Optimization for Emergency Evacuation and Response in Disaster Area (재난지역에서의 대피·대응 동시수행을 위한 다중목적 긴급대피경로 최적화)

  • Kang, Changmo;Lee, Jongdal;Song, Jaejin;Jung, Kwangsu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.2
    • /
    • pp.617-626
    • /
    • 2014
  • Lately, losses and damage from natural disasters have been increasing. Researchers across various fields in Korea are trying to come up with a response plan, but research for evacuation plans is still far from satisfactory. Hence this paper proposes a model that could find an optimized evacuation route for when disasters occur over wide areas. Development of the model used methods including the Dijkstra shortest path algorithm, feasible path method, genetic algorithm, and pareto efficiency. Computations used parallel computing (SPMD) for high performance. In addition, the developed model is applied to a virtual network to check the validity. Finally the adaptability of the model is verified on a real network by computating for Gumi 1stNational Industrial Complex. Computation results proved that this model is valid and applicable by comparison of the fitness values for before optimization and after optimization. This research can contribute to routing for responder vehicles as well as planning for evacuation by objective when disasters occur.

Hierarchical Inter-domain Load Balanced QoS Routing (계층적 도메인간 부하분산 QoS 라우팅)

  • Hong, Jong-Joon;Kim, Seung-Hoon;Lee, Kyoon-Ha
    • The KIPS Transactions:PartC
    • /
    • v.9C no.5
    • /
    • pp.671-678
    • /
    • 2002
  • In this paper, we propose hierarchical inter-domain load balanced QoS routing in a large scale of network. And a scheme of calculating resources'costs for precomputation schemes in hierarchical routing is proposed, and a scheme for selecting a path among multiple precomputed paths is proposed. We also propose a QoS routing scheme for transit and intra traffic in a large scale of domain-based network. For a domain in the network, the routing scheme first precomputes K multiple paths between all pairs of ingress and egress border routers while considering balancing of the expected load then selects paths with the probability of path selection. The routing scheme combines inter and intra domain routings seamlessly and uses the same cost calculation scheme. And these schemes make possible both global network resources' utilization and also load balancing.

Hierarchical Inter-Domain based QoS Routing in a Wide Area of Network (대규모 네트워크를 위한 계층적 도메인간 QoS 라우팅)

  • Hong Jong-Joon
    • Journal of the Korea Society of Computer and Information
    • /
    • v.10 no.3 s.35
    • /
    • pp.209-217
    • /
    • 2005
  • In this paper, we propose hierarchical inter-domain load balanced QoS routing in a large scale of network. And a scheme of calculating resources' costs for precomputation schemes in hierarchical routing is proposed. and a scheme for selecting a path among multiple precomputed paths is proposed. We also propose a QoS routing scheme for transit and intra traffic in a large scale of domain-based network. For a domain in the network, the routing scheme first precomputes K multiple paths between all pairs of ingress and egress border routers while considering balancing of the expected load then selects paths with the probability of path selection. The routing scheme combines inter and intra domain routings seamlessly and uses the same cost calculation scheme.

  • PDF

Estimation of Risk and Optimal Route to Transport Hazardous Materials -Application to Metropolitan Area- (위험물 수송을 위한 위험도 및 최적경로산정 -수도권 사례를 중심으로-)

  • 조용성;오세창
    • Journal of Korean Society of Transportation
    • /
    • v.17 no.1
    • /
    • pp.75-89
    • /
    • 1999
  • 위험물차량사고는 일반차량의 교통사고시 발생하는 인명피해, 재산피해, 교통지체 외에 부가적으로 환경적 영향에 의한 엄청난 인명 및 재산손실을 유발시킬 수 있다. 따라서 이러한 위험물차량사고를 예방하고 피해를 최소로 줄이기 위해서는 위험물수송경로의 신중하고 체계적인 결정이 필수적이라 할 수 있다. 따라서, 본 연구는 위험물차량의 수송경로를 결정할 때 고려해야 할 여러 가지의 기준 및 목표에 따라 위험물수송경로를 설정하는 모형을 제시함으로써 위험물수송에 수반되는 위험을 최소화하면서 위험물차량의 통행시간, 거리, 비용 등을 최적화하여 위험물수송의 안전 및 운영효율성을 향상시키고자 한다. 먼저, 위험물 수송경로의 기준지표로 사용될 위험도를 나타내기 위해 사고율과 피해가능규모를 구하도록 사 고건수, 링크 주변노출인구, 링크상의 노출인구, 밀도 등을 변수로 하는 모형식을 제안하고, 두 번째로 위험물 수송을 위한 최적경로를 산출하기 위해 위험도와 통행시간을 목적함수로 하는 다목적계획모형을 제안하였고 기존의 최적경로 알고리즘을 적용하여 최적경로를 산출하였다. 마지막으로 실제 수도권지역을 대상으로 본 연구에서 제안한 모형을 적용하고 현재 일반적으로 사용되는 최단경로와 비교.분석하였다. 모형적용결과, 링크주변인구만을 고려하는 기존 모형에 비해 링크상의 인구를 함께 고려함으로써 좀더 실제적으로 교통상황을 충분히 반영한 피해규모를 산정하였다. 또한, 본 연구에서 제안한 위험도와 통행시간에 0.5의 비중을 주는 다목적모형이 기존의 위험도모형에 비해 충분한 안전성을 확보하면서 최소 4%, 최대 12%의 통행시간 개선의 효과가 있음을 나타냈다.

  • PDF

Development of Evacuation Algorithm from Coastal Inundation (해안침수 대피경로 알고리즘 개발)

  • Kim, Won Beom;Jung, Woo Chang;Son, Kwang Ik
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2020.06a
    • /
    • pp.355-355
    • /
    • 2020
  • 최근 쓰나미와 해일 등 이상기후에 의한 해수면 상승 등으로 인한 해안지역의 침수가 빈번해지고 있다. 태풍 매미의 경우, 피해규모는 인명피해 130명, 이재민 4089세대 10975명, 재산피해 4조 7810억원이며 침수피해는 규모는 주택 21,015동과 농경지 37,986ha으로 나타났다. 특히 이 태풍은 경남 사천시 부근 해안에 상륙할 때의 중심기압은 950hPa로 중심부근 최대풍속 40m/s 이었으며 풍속 15 m/s 이상으로로, 태풍의 강도는 [강], 크기는 [중형]이었음에도 그 피해는 과거에 비해 크게 나타났다. 내륙과는 달리 해일 등의 피해로 인한 해안지역의 침수피해 저감기법은 월파방지 파라펫 설치 또는 침수예상 지역의 지반고를 높이는 이외에는 확실한 대책이 없는 것이 특징이라 하겠다. 따라서 해안지역 침수예방은 월파방지 파라펫과 함께 인명피해 최소화를 위해서는 충분한 선행시간을 통한 대피안내와 가장 효율적인 대피경로를 제공하는 것이 최선이라 할 수 있다. 본 연구에서는 경남 창원지역의 해수면 상승으로 인한 해안지역 침수를 모의할 수 있는 2차원 부정류 프로그램을 개발하고 매미 당시 창원지역의 침수피해 결과와 비교하여 프로그램 모의 결과를 검증하였다. 해안을 따라 다양한 높이의 월파방지 파라펫을 모의하여 시간대별 대상지역의 침수규모를 시간대별로 예측하였다. 모의결과 월파방지 파라펫 규모 별 침수규모와 이에 따른 경제적 피해규모를 산정하였으며 경제성 원칙에 따른 최적의 파라펫 규모를 제시하였다. 또한 이때 시간대별 침수범위 예측 결과를 바탕으로 시간대별 등침수선을 제시하고 일정 시간대별 등침수선을 모의결과를 이용하여 산정하였다. 도로 경사와 대피자의 연령 등을 고려한 대피소요 시간을 산정하여 침수 소요 시간과 비교하여 대피가 가능한 대피경로를 제시하는 알고리즘을 제안하였다. 본 연구결과는 기존에 알려진 대피경로와는 달리 다양한 침수저감 기법규모에 따라 다양한 대피경로를 제안할 수 있었으며 이는 추후 다양한 대피 시나리오를 제시할 수 있는 기초자료를 제공할 수 있을 것으로 기대된다.

  • PDF

Probability-based Critical Path Estimation for PERT Networks of Repetitive Activities (반복작업 PERT 네트워크의 확률기반 주공정 산정기법)

  • Yi, Kyoo-Jin
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.6
    • /
    • pp.595-602
    • /
    • 2018
  • Network-based scheduling methods can be classified into CPM method and PERT method. In the network scheduling chart, critical path can be estimated by performing the forward calculation and the backward calculation though the paths in the network chart. In PERT method, however, it is unreasonable to simply estimate the critical path by adding the sum of the activity durations in a specific path, since it does not incorporate probabilistic concept of PERT. The critical path of a PERT network can change according to the target period and deviation, and in some cases, the expected time of the critical path may not be the path with longest expected time. Based on this concept, this study proposes a technique to derive the most-likely critical path by comparing the sum of estimated time with the target time. It also proposes a method of systematically deriving all alternate paths for a network of repetitive activities. Case studies demonstrated that the most-likely critical path is not a fixed path and may vary according to the target period and standard deviation. It is expected that the proposed method of project duration forecasting will be useful in construction environment with varying target date situations.