A Study on the Vibration Phenomenon of 6 Bundle Boltless Spacer Damper (6도체 무볼트형 Spacer Damper의 진동현상에 관한 연구)

  • 김영달
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.17 no.3
    • /
    • pp.110-118
    • /
    • 2003
  • Spacer dampers maintain the constant gaps between each conductor in a bundle conductor-transmission line, and are installed at proper intervals to keep a line from all sorts of damages derived from the vibration energy caused by mechanical or electrical external factors. It is most important to embody a technology which considers difficulties of maintenance and repair, and has optimum elements in order to prevent accidents such as destruction by fire or the snapping of a wire by the effect of vibration phenomenon coming from transmission lint In the resent thesis, therefore, the analysis of vibratory characteristics of spacer damper is set up by analytical methods such as the analysis of conductor motion's governing equation, the equation of spacer damper's motion, spacer damper-fastened wire's motion in a span and the numerical analysis of finite difference method. Furthermore, the installation distance between spacer dampers was scrutinized by simulations of various vibration phenomena which change at any time as actual conditions do, and hereafter difference method. Furthermore, the installation distance between spacer dampers was scrutinized by simulations of various vibration phenomena which change at any time as actual conditions do, and hereafter we will be able to analyze all kinds of vibration phenomena coming from a boltless spacer damper with 6 bundle conductor for 765kV transmission line based on new analytical methods.

Dynamic Analysis of Superstructures on Very Large Floating Structure with Semi-Rigid Connections (반강접 접합부를 적용한 초대형 부유식 구조물 상부구조체에 대한 동적해석)

  • Song Hwa-Cheol;Kim Woo-Nyon
    • Journal of Navigation and Port Research
    • /
    • v.29 no.5 s.101
    • /
    • pp.389-394
    • /
    • 2005
  • The additional moment occurs because the superstructures of VLFS are influenced by wave loads instead of earthquake loads. In order to reduce the additional moment, this study used the semi-rigid connections which lie between fully rigid and pinned. If the semi-rigid connections are used for superstructures of VLFS, the moment of beams can be reduced and more economical construction will be possible. This study aims to show the effect of wave loads on structure and the efficiency of the semi-rigid connections due to wave loads by analyzing the time history responses. The dynamic behaviors of the rigid frame are compared with those of the semi-rigid frame considering of static loads, wave loads and combination loads for a four-bay, three-story frames. The semi-rigid connection type is a steel tubular column with square external-diaphragm connections and the time history analysis is used for the dynamic responses. The additional moment responses due to wave loads increase $33\%$ in the rigid frame, $26\%$ in the semi-rigid frame with the spring model.

Studies on the Juvenile Grafts with Plastic Tubes for Forcing Stock Growth in Juglans sinensis (호도나무 대목촉성재(臺木促成材) Plastic원통(圓筒)을 이용(利用)한 유경녹기(幼莖綠技) 접목(接木)에 관(關)한 연구(硏究))

  • Youn, Ki Sik;Goo, Gwan Hyo;Jo, Chung Suk
    • Journal of Korean Society of Forest Science
    • /
    • v.78 no.2
    • /
    • pp.189-197
    • /
    • 1989
  • This study was carried out to produce the grafts of Juglans sinensis by juvenile grafting method which epicotyl of newly germinated seeds were used as stocks and juvenile fresh shoots were used as scion. The results obtained were as follows ; 1. When plastic tube installed covering up seed with soil up to 6cm height for diameter increment of epicotyl, the epicotyl can be grown up to thickness of 10mm. 2. When the soft fruit branches and the soft water sprout with the terminal bud 8cm to 12cm long were used as scions, the survival rates showed 90 Percent. 3. The optimum date for making juvenile grafts was around the 20th of May, and the survival rates of grafted seedlings showed 86 percent in average. 4. The grafted seedlings showed first sprouting the 15th of June, that is 25 days after making graft, and the sprouting rate was 72 percent. 5. The height-growth of grafted seedlings finished at the end of July, and diameter growth lasted into the end of October. 6. There was positive correlation between the height of grafted seedlings and the diameter at root collar. 7. In general, it takes two years to make plantable graft seedlings from hardwood scion and stock, but the juvenile graft seedlings can be easily obtained in a year and so it seems to be economic.

  • PDF

Study on Affecting Factors for the Segmental Joint Behavior of Spliced Girder Bridges (분절교량 접합부 거동의 영향인자에 대한 연구)

  • Nam, Jin-Won
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.23 no.3
    • /
    • pp.9-16
    • /
    • 2019
  • Recently, precast PSC girder bridges have been widely applied for short and middle span bridges. The construction of the spliced girder bridges has been increasing to overcome the length limit of girder and transportation restrictions. In case of the spliced girder, the integrity of the segmental joints is very important to secure the structural soundness of bridge because the discontinuity on the segmental joints between adjacent segments could be vulnerable point. The study of segmental joint behavior with different influence factors of joint type, shear key installation, confining force is very important. In this research, finite element analysis and scaled model test with different shear key shapes and confining forces were carried out and the comparative study was performed to evaluate the segmental joint behavior of precast spliced PSC girder bridge. It was confirmed that the installation of shear key with height and depth ratio of 1/2~1/3 and applying of confining force of 1/2 of the concrete strength at the joint was effective in improving the integrity of segmental joint. In addition, the field loading test for existed precast spliced PSC girder bridge was performed and the measurement of the difference of deflection between adjacent segments at segmental joint was proposed as the assessment solution of the integrity of segmental joint.

Shear Strength of SFRC Deep Beam with High Strength Headed Reinforcing Tensile Bars (고강도 확대머리 인장철근을 가지는 SFRC 깊은 보의 전단강도)

  • Kim, Young-Rok;Lee, Chang-Yong;Kim, Seung-Hun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.23 no.5
    • /
    • pp.111-117
    • /
    • 2019
  • Shear experiments were carried out to evaluate shear performance of SFRC deep beams with end-anchorage of SD600 high strength headed reinforcing tensile bars. The experimental variables include the end-anchorage methods of tensile bars (headed bar, straight bar), the end-anchorage lengths, and the presence of shear reinforcement. Specimens with a shear span ratio of 1 showed a pattern of the shear compression failure with the slope cracks progressed after the initial bending crack occurred. Specimens with end-anchorage of headed bars (H-specimens) showed a larger shear strengths of 5.6% to 22.4% compared to straight bars (NH-specimens). For H-specimens, bearing stress reached 0.9 to 17.2% of the total stress of tensile bars up to 75% of the maximum load, and reached 22.4% to 46%. This shows that the anchorage strength due to the bearing stress of headed bars has a significant effect on shear strength. The experimental shear strength was 2.68 to 4.65 times the theoretical shear strength by the practical method, and the practical method was evaluated as the safety side.

Seismic Fragility Analysis of Rahmen-type Continuous Bridge Supported by High Piers (고교각으로 지지된 라멘형 연속교의 지진취약도 분석)

  • Kang, Pan-Seung;Hong, Ki-Nam;Yeon, Yeong-Mo
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.23 no.5
    • /
    • pp.84-95
    • /
    • 2019
  • This paper reports the process of seismic fragility analysis for the rahman-type continuous bridge system. The target structure was the five span highway bridge with maximum pier hight of 72m. OpenSees software was used for the nonlinear time history analysis. In this study, 50 ground motions are considered for nonlinear time history analysis. For each ground motion, PGA was scaled from 0.1g to 2.0g with intervals of 0.1g in order to consider a wide range of the seismic intensity measure. In addition, yield displacement and ultimate displacement of each pier were calculated through section analysis. Based on the result of non linear time history analysis and section analysis, damage condition of target bridge was classified according to the definition of damage condition proposed by Barbat et al. As a result, it was predicted that Extensive Damage occurred at P1 when 0.731 g earthquake occurred in the longitudinal direction. Based on the seismic fragility analysis results, it is found that the probability of occurrence of Extensive Damage in the 4,800 - year period earthquake was about 4.2%. Therefore the target bridge has enough safety for earthquake.

Analytical Research on Dynamic Behavior of Steel Composite Lower Railway Bridge (강합성 하로 철도교의 동적거동에 대한 해석적 연구)

  • Jeong, Young-Do;Koh, Hyo-In;Kang, Yun-Suk;Eom, Gi-Ha;Yi, Seong-Tae
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.23 no.1
    • /
    • pp.27-35
    • /
    • 2019
  • The existing middle-long span railway bridge has been mainly applied to steel box girder bridges. However, the steel box girder bridges have disadvantages in securing the space under the bridge, and the main girder is made of a thin plate box shape, resulting in a ringing noise due to the vibration. Many complaints about noise have been raised. For this reason, there is a need for the development of long railway bridges that can replace steel box girder bridges. In this paper, the characteristics of the steel composite railway bridge currently developed were introduced and a time history analysis was conducted using MIDAS Civil reflecting the speed of KTX load for 40m and 50m bridges. In addition, from the analysis results, the dynamic behavior of target bridges were verified and it was examined whether they meet the dynamic performance criteria proposed in the railway design standards. As a result, all of the bridges under review satisfied the dynamic safety criteria, however, in case of 40m of span, the vertical acceleration value was very large. In order to solve this problem, authors proposed the improvement plan and corrected the cross section to confirm that the vertical acceleration decreased.

Behavior and Improvement of Construction Crack occurred on Anchorage of PSC-edge Girder Rahmen Bridge (PSC-Edge 거더 라멘교의 정착부에 발생한 시공 균열 거동과 개선)

  • Ok, Jae-Ho;Yhim, Sung-Soon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.5
    • /
    • pp.569-576
    • /
    • 2019
  • PSC-Edge Rahmen Bridge makes low thickness and long span by introducing prestressed force to the edge girder and reducing positive moment. In the bridge, diagonal tension cracks occurred in the direction of $45^{\circ}$ to outer side of the girder after the temporary bent supported on the lower part of the upper slab and the secondary strand is tensioned on the girder. Researches on stress distribution and burst crack behavior of pre-stress anchorage has been conducted, it is difficult to analyze an obvious cause due to difference between actual shape and boundary condition. This study performed 3D frame analysis with additional boundary condition of temporary bent, the maximum compression stress occurred in the girder and there was a limit to identify the cause. It performed 3D Solid analysis with LUSAS 16.1 and the maximum principal tensile stress occurred at the boundary between the girder and the slab. As analyzing required reinforcement quantity at obtuse angle of the girder with the maximum principal tensile stress and directional cosine, reinforcement quantity was insufficient. Additional bridges have increased reinforcement quantity and extended area and crack was not occurred. It is expected that cracks on the girder during construction could be controlled by applying the proposed method to PSC-Edge Rahmen Bridge.

Patrol Monitoring Plan for Transmission Towers with a Commercial Drone and its Field Tests (상용화 드론을 이용한 송전선로 점검방안 및 현장시험)

  • Kim, Seok-Tae;Park, Joon-Young;Lee, Jae-Kyung;Ham, Ji-Wan;Choi, Min-Hee
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.4 no.2
    • /
    • pp.115-123
    • /
    • 2018
  • Various types of robots running on power transmission lines have been developed for the purpose of line patrol monitoring. They usually have complex mechanism to run and avoid obstacles on the power line, but nevertheless did not show satisfactory performance for going over the obstacles. Moreover, they were so heavy that they could not be easily installed on the lines. To compensate these problems, flying robots have been developed and recently, multi-copter drones with flight stability have been used in the electric power industry. The drones could be remotely controlled by human operators to monitor power distribution lines. In the case of transmission line patrol, however, transmission towers are huge and their spans are very long, and thus, it is very difficult for the pilot to control the patrol drones with the naked eye from a long distance away. This means that the risk of a drone crash onto electric power facilities always resides. In addition, there exists another danger of electromagnetic interference with the drones on autopilot waypoint tracking under ultra-high voltage environments. This paper presents a patrol monitoring plan of autopilot drones for power transmission lines and its field tests. First, the magnetic field effect on an autopilot patrol drone is investigated. Then, how to build the flight path to avoid the magnetic interference is proposed and our autopilot drone system is introduced. Finally, the effectiveness of the proposed patrol plan is confirmed through its field test results in the 154 kV, 345 kV and 765 kV transmission lines in Chungcheongnam-do.

Analysis of Track-Bridge Interaction and Retrofit Design for Installation of CWR on Non-ballasted Railway Bridge (무도상 철도교 레일 장대화를 위한 궤도-교량 상호작용 해석 및 개량방안 분석)

  • Yoon, Jae Chan;Lee, Chang Jin;Jang, Seung Yup;Choi, Sang Hyun;Park, Sung Hyun;Jung, Hyuk Sang
    • Journal of The Korean Society For Urban Railway
    • /
    • v.6 no.4
    • /
    • pp.383-392
    • /
    • 2018
  • This study investigated the change of additional axial stress of rail and reaction force at bridge bearings due to the track-bridge interaction when laying CWR on non-ballasted railway bridges including truss bridges with relatively long span. According to the results of the present study, additional axial stresses of rail and reaction forces at bridge bearings showed a large increase when CWR is installed on the non-ballasted railway bridge. The additional axial stress of rail can be acceptable if sufficient lateral resistance can be obtained. However, if the reaction force increases, there is a risk of damage of the bearing or pier, and therefore, it is necessary to take measures to mitigate the reaction force. It is found that additional axial stress of rail decreases when considering the frictional resistance of the bridge movable support, but its effect on the bearing reaction force is very small. On the other hand, when the longitudinal track restraint decreases, both additional axial stress of rail and bearing reaction force are reduced to a large extent. Also, when the ZLR fastening devices are applied to the region where the additional axial stress of rail is highest, bearing reaction force as well as additional axial stress of rail greatly decreased. Therefore, the application of ZLR fastening devices with the reduction of the longitudinal track restraints is very effective for installing CWR on non-ballasted railway bridges.